All content in this website is sourced legitimately

Archives


All the news items since the launch of our web site are preserved in the archive section. The archive entries are freely accessible to all the users.


Jan 2020

If you are looking for an empanelled list of vendors to set up rooftop solar plants of slightly large scale plants, here is a list of vetted vendors
8Rooftop solar is now proving to be cheaper than grid power
8Also, if larger scale solar power plant, power from which can be used inhouse and exproted to the grid can be a positive income source for companies
Click on Reports for more
Details
Get an update on this OALP-block of Cairn India
8
Project Name: RJ-ONHP-2017/4 Block Exploration
8Project Cost: Rs 1451 crore
Click here for more details
Details
8Project Name: North Goa City Gas Distribution
8Project Cost: Rs 200 crore
8Project Description: Goa Natural Gas Private Limited, JV of Gail Gas Limited- BPCL, has been granted permission on June 29, 2016, to set up a CGD network in North Goa district of Goa. The entity won the project under the 6th CGD bidding round.
8Project Event: RFQs for laying steel pipeline network and associated works is expected by March, 2020.
RFQs for further equipments for CGS station are expected later in Q2 2020.
Click here for more details, including key contacts Details
8Project Name: NTP2-NTP1 pipeline repair
8Project Cost: Rs 150 crore
8Project Description: Oil and Natural Gas Corporation Limited RFQs for the hiring of services for NTP2-NTP1 pipeline repair and maintenance along with the dredging work are expected to be released by the end of next month.
Click here for more details for key contacts
Details
Adani Gas Ltd's share prices have tanked with the NSE writing to the management seeking confirmation on allegations that PNGRB has threatened to cancel its licences to 13 geographical areas for reportedly, as per the gas regulator's own terminology, "perpetrating a fraud"
8The website has learned that Adani Gas had indeed been served with a strongly worded show cause notice by the regulator, and there is a possibility that the process of cancellation of licence will proceed ahead despite a clarification given by the Adanis. There is also the threat of cancellation of Rs 400 crore of guarantees given by Adani Gas
8While allegations are flying thick and fast, the website also carries here the views of Adani Gas on the subject. "As far as we are concerned, we have given a satisfactory reply," an Adani Gas representative told this website.
Click on Details for a comprehensive update Details
For reference purposes the website carries here the following tenders:
8Subscription of various Cloud Services Details
8Supply of Hot Dip Galvanized Grating Details
8Supply of Once Through Hydro cracker Unit Catalyst (OHCU) along with Inert balls Details
8Partial Catalyst Unloading, Skimming and Loading in Inert Atmosphere in NHT Reactor Details
8Non-Comprehensive Annual Maintenance Contract for Gas Detectors Details
8Artificial intelligence based antivirus for endpoints and servers Details
8ARC for Steel Cord Belt Pulling, laying & jointing for 3 years at CPP Coal Handling System Details
8ARC for Product Tank M&I jobs in Refinery Offsite area Details
8De-Silting of Small Drain at MRPL Area Details
You can also click on Tenders for more

For reference purposes the website carries here the following Newsclips:
8Adani Gas cracks 14% as report suggests PNGRB seeks to cancel its licence Details
8AGR dues: GAIL moves SC for clarification, DoT says outstanding amount at Rs 1.83 lakh cr Details
8GST credit against excise duty on petroleum products Details
8Fuel prices set to fall as virus scare may hit demand Details
8Have responded to PNGRB with all information: Adani Gas Details
8Natural gas pipeline linking Kochi-Koottanad-Mangaluru most likely by end of March: Gail Details
8Petrol, diesel prices see big cut on Saturday Details
8EPCA decides for full ban on diesel gensets in NCR next winter Details
8Oil India may hold 74 per cent in BPCL's NRL, Assam 26 per cent Details
8Reliance's partnership with Saudi Aramco not a retreat from energy business: Report Details
8OPINION: Prepare for turbulence in emerging markets Details
8Slash GST on Auto LPG, address policy issues stalling growth: Industry body to FM Details
8Govt moves to green 2 lakh telco towers Details
8India's Ujjwala scheme provided LPG access, but failed to promote its use: Study Details
You can also click on Newsclips for more   Details
Phosphoric acid Expansion Project
8Cost - Rs 130 crore
8Project Event: The company authority has been decided to do the project through its existing engineering team. Purchase of long lead items is continuing. Construction is likely to start in April 2020 due to a delay in the energy-saving project which is likely to be commissioned in March 2020, The construction of the Phos acid project is to start after the commissioning of the energy-saving project.
Click here for more details
Granular Single Super Phosphate Greenfield Project
8Cost - Rs 148 crore
8Project Event: The proposal for the environmental clearance has been accepted and the project is in the initial stage, Still discussion is ongoing, RFQ for the EPC contractor is likely to be released in March 2020 instead of January as thought of earlier.
Click here for more details (Available only through www.indianfertilizer.com)
Details
We have an update on two Cairn India blocks won under OALP-1
They are:
Project Name: RJ-ONHP-2017/3 Block Exploration
8Project Cost: Rs 2142 crore Click here for more details
Project Name: CB-ONHP-2017/10 Block Exploration
8Project Cost: Rs 1663 crore Click here for more details Details
8Project Name: Bhopal and Rajgarh Dictricts City Gas Distribution
8Project Cost: Rs 200 crore
8Project Description: Think Gas Investments Pte. Limited, in consortium with Think Gas Distribution Private Limited, had been granted permission on September 20, 2018, to set up a CGD network in Bhopal and Rajgarh districts of Madhya Pradesh. The entity won the project under the 9th CGD bidding round. Think Gas then requested transfer of authorization to Think Gas Ludhiana Pvt Ltd, wholly-owned subsidiary of Think Gas Distribution Private Limited
8
RFQs will start from Q-2, 2020
Click here for more details Details
8Project Cost: 146.37 crores
8Project Description: Indian Oil Corporation Limited (IOCL) along with Engineers India Limited (EIL) as the PMC contractor is planning to install a demonstration plant with a capacity of 850 kg/hr Slurry Resid hydrocracking (indResid) unit. IOCL's in-house team is the licensor and FEED work is going on. Currently, the RFQs are on hold due to lack of capital approval which is expected by March-2020.
8Project Event: RFQ for the EPC contractor is expected in April-2020.
Click here for more details Details
8Project Cost: 146.37 crores
8
Project Description: Indian Oil Corporation Limited (IOCL) along with Engineers India Limited (EIL) as the PMC contractor is planning to install a demonstration plant with a capacity of 850 kg/hr Slurry Resid hydrocracking (indResid) unit. IOCL's in-house team is the licensor and FEED work is going on. Currently, the RFQs are on hold due to lack of capital approval which is expected by March-2020.
8Project Event: RFQ for the EPC contractor is expected in April-2020.
Click here for more details Details
In fleet owners in India are warned to be extra vigilant when following IMP 2020 regulation on use of complaint bunker fuel
8The cost non-compliance is high
8The US is strict, under their "magic pipe" formulation but Chinese inspectors are also extra vigilant these days Details
Oil tankers equipped with scrubbers are earning a much higher return on investment than those without scrubbers and forced to use low sulphur fuel oil
8The heavy disparity in low and heavy sulphur fuel oil is the reason
8Find out more on what kind of differential earnings those with and without scrubbers are earning
Click on Reports for more Details
Fuel retail outlets in India are going through a transformation process just like anywhere else in the world
8Fuel retail has been commoditized, with consumers choosing between one retailer and another by price, location and availability of specific services.
8People are more likely to decide on one station over another for compelling reasons, and while location will remain a key factor, the presence of diverse convenient services is becoming more important as a differentiator.
8Find out more on what kind of changes are in the offing and how fuel retail outlets of the future are going to look like
Click on Reports for more Details
The PNGRB notice to Adani Gas has left French energy major Total red faced
8Well placed sources said that the multinational was putting together its own investigation as to why this flouting of the rule was not discovered by its own forensic team which did the due diligence for purchase of a 37.4% stake in Adani Gas
8Total paid Rs 6155 crore for the stake. 
 Click on Details for more
Details
Following our story on "McDermott's bankruptcy: Indian operations will be hit", company officials got back to us, claiming that the company's operations will not suffer in India.
8In fact, things will get better after the embattled multinational's technology division is jettisoned, it is pointed out.
8Find out how this logic will work in India? And what is the company's strategy for India?
Click on Details for more Details
Get a full listing of offshore oil & gas vendors in India
8The list holds both engineering service providers as well as equipment and service providers
Click on Reports for more   Details
Phosphoric Acid & Sulphuric Acid Greenfield Project
8Cost - Rs 18000 crore
 
8Project Event: The Company is in the process of discussions with phosphoric acid process Licensors for the supply of Basic Engineering Package based on which it will execute the project on an EPC basis. Finalization expected in February 2020. Simultaneously the company is in final discussion with rock phosphate suppliers for the execution of Memorandum of Understanding (MoU) to ensure the availability of rock phosphate on a long-term basis. he RFQ for the EPC contractor is likely to be released in April 2020.
Click here for more details (Available only through www.indianfertilizer.com) Details
Ammonia-Urea Energy Saving Project
8Cost - Rs 262 crore
8Project Event: 90 % construction work has been completed and commissioning is likely to be completed in April 2020 in place of January 2020 due to delay in the procurement work.
Click here for more details (Available only through www.indianfertilizer.com)
  
Details
We have two city gas update for you
8
Project Name: Jalandhar (Except areas already authorized), Kapurthala, and SBS Nagar Districts City Gas Distribution
RFQs are expected from Q-2 onwards
Click here for more details
8
Project Name: Ludhiana (Except area already authorized), Barnala, and Moga Districts City Gas Distribution
Get key contacts and future RFQ dates here
Click here for more details
Details
8Project Name: Madanam CPF and Pipeline Development
8Project Cost: Rs 390 crore
8Project Description: Oil and Natural Gas Corporation Limited is expected to award the contract for the hiring of Gas Dehydration and Dew Point Depression services for Madanam field, at CPF Madanam by end of next month.
8Project Event: LOI for the GDU services is expected to be awarded by Feb end 2020.
Click here for more details
Details
8Project Name: B-66 and C-Series 3-D Seismic Data Acquisition
8Project Description: Oil and Natural Gas Corporation Limited awarded the cumulative tender for the hiring of 3D seismic survey services for its B-66 and C-Series field
Click here for more details
Details
Slowly but inexorably, Indian companies are getting their toe-hold in the high-tech offshore steel fabrication and pipeline business.
8Pushed by Make in India policy of the government of India, foreign suppliers are going to be edged out unless they set up manufacturing facilities in India.
8But for foreign companies, the market is not big enough to warrant an investment but for an Indian company, it is not just orders locally from the likes of ONGC that they can count on but also look out for orders from the rest of the world
8Two Indian companies have muscled their way into the exclusive offshore seamless line pipes segment
8Moreover, at least three new companies are setting up fabrication units which will qualify for bidding in offshore tenders
Click on Details for more Details
What has been OIL's loss of production in December when the CAA stir hit Upper Assam?
8Output was badly hit
Click on Details for more Details
DES West India LNG prices are at a 10-year low at sub-$4/mmbtu
8And spot LNG prices could be quickly hurtling towards the $3/mmbtu mark by summer
Click on Reports for more Details
Cairn India seems to have moved from being high performer to an under-performer now
8Despite huge potential, the company's flagship RJ-ON-90/1 field seems to be underperforming
8It is also encountering problems with its vendor base.
8"The company is behaving in a rather quirky manner these days," one vendor said
Click on Details for more   Details
For reference purposes the website carries here the following tenders:
8Supply of Secondary Reformer Catalyst in Ammonia Plant Details
8Supply of Foam Cum Water Monitors at Pipeline Locations Details
8Two Year Comprehensive Maintenance Contract for IT Assets including availing services of Resident Engineers Details
8Hiring of OFC maintenance services for Gailtel network under agra region Details
8Procurement of CPVC Pipes Fitting and Valves for IOP&S And GCU-1 Plant Details
8Procurement of Hydrochloric Acid Details
8Supply of monoliths with integrated LED rate display units and product display units for retail outlets Details
You can also click on Tenders for more

For reference purposes the website carries here the following Newsclips:
8Relief to consumers as petrol, diesel get cheaper Details
8Indian Oil signs MoU with Ghana's National Petroleum Authority Details
8Draft policy to push CNG, PNG in cities Details
8Five non-telecom PSUs seek clarity from SC on AGR order Details
8ONGC gets 28 bids for 50 oil, gas fields in 1st bid round Details
8Lenders bet on clean fuel, city gas projects worth Rs 38,000 crore tie up funds Details
8Adani Gas to invest Rs 9,000 cr on distribution networks over next 10 yrs Details
8BRIEF: Will soon discuss long-term deals with Russia and Qatar, says Oil Minister Pradhan Details
8BRIEF: India's oil ministry wants IOC, other state refiners to buy oil from Brazil Details
8PNGRB to launch 11th City Gas Distribution round soon: Dharmendra Pradhan Details
8Punjab to replace old three wheelers with electric, CNG three wheelers Details
8India keen on importing more oil from Brazil Details
8U.S., Canadian oil company bankruptcies surge 50 per cent in 2019 Details
8Kinder Morgan profit jumps 26 per cent on Gulf Coast Express pipeline strength Details
8Norway court to rule in Arctic oil drilling case Details
8Oil slump deepens as China virus casts cloud over fuel demand, economy Details
8China's Beijing Gas wins state approval for Tianjin LNG terminal Details
8Brazil produces more than 1 billion barrels of oil in 2019 Details
8Greenpeace loses Norway Arctic oil lawsuit again Details
8UK gas prices fall as mild weather reduces demand Details
You can also click on Newsclips for more   Details
Offshore jack up rig rates have shown sharp increases, lifting the mood in the industry
8Spot day rates in India rose a whopping 60%. What is more, there is a modest rig count recovery in India in 2019 after drop in 2018 but a further rise likely in 2020
8While a majority of players are still posting low capacity utilization levels, smarter players are leveraging the volatility by buying rigs at rock bottom rates and deploying them at higher rates
Click on Details for more Details
A recent tender for sale of 19 Tag Offshore vessels did not elicit a good response despite a lot of interest shown initially
8Only two bidders participated eventually and not all vessels have elicited interest
Find out more Details
ONGC's offshore  platforms have pathetic living conditions, company officials have complained
8From rat infestations to lack of drinking water to poor food quality and hygiene have made a posting to an offshore platform a nightmare," an officers' association official told this website
8The quality of equipment is poor, gas leaks are frequent and an accident is waiting to happen
8ONGC's L-1 bidding system, without adequate caveats to bring in quality vendors, has resulted in such conditions, claim officers
8"Sub par suppliers, lack of adequate controls, have ruined the system," he said
Click on Details for more Details
8Project Name: Alwar (Other than Bhiwadi) and Jaipur Districts City Gas Distribution
8Project Description: Torrent Gas Private Limited, had been granted permission on September 27, 2018, to set up a CGD network in Alwar (Other than Bhiwadi) and Jaipur districts of Rajasthan. 
8The entity won the project under the 9th CGD bidding round. The CGD network will have a coverage area of 1918 sq. km.
8GAIL's Neemrana-Alwar-Jaipur is being constructed which will supply RLNG to the said network.
8Find out more on what kind of progress has been made and what kind of RFQs are coming up ahead. Click here for more details Details
8Project Name: Begusarai City Gas Distribution
8Project Cost: Rs 200 crore
8 Gas will be drawn from GAIL's Jagdishpur-Haldia-Bokaro-Dhamra Natural Gas Pipeline.
8Know more about what is up
Click here for more details
Details
8Project Name: Peravali Oil Field Development
8Project Cost: Rs 1500 crore
8Project Description: Oil And Natural Gas Corporation Limited's project for the 50 well development drilling project in Godavari On-land PML block of KG Basin in East & West Godavari Districts of Andhra Pradesh is expected to take some time.
Find out more
Click here for more details
Details
8Project Name: Crude Oil Handling Facility
8Project Description: Bharat Petro Resources Limited is expected to take some time to float the RFQs for the hiring of an EPC contractor for the construction of a Crude Oil Handling Facility at ONGC's Central Tank Farm facility in Kheda, Gujarat, as the financial approval for the project is still pending.
8Project Event: RFQ for the EPC contractor is expected by Q2 mid 2020.
Click here for more details
Details
For reference purposes the website carries here the following tenders:
8Ambient air quality monitoring around refinery Details
8Procurement of spares for Well-logging Truck Details
8Hiring of Services for Annual Maintenance Contract for LAN and EPABX System Details
8Spares for national type Triplex Power Slush pumps Details
8Supply of Resineated Lignite Details
8Standing Rate Contract for Retail Visual Identity including Comprehensive Annual Maintenance Details
8NHT Catalyst for CCRU Details
You can also click on Tenders for more

For reference purposes the website carries here the following Newsclips:
8Aramco IPO proceeds to fund Saudi industry, including defence: Finance minister Details
8Cairn hunts for big oil partner via stake sale Details
8Gujarat: Morbi coal-to-gas switch turns into a case study Details
8GAIL to invest over Rs 45,000 cr to create infra for gas-based economy Details
8Slash GST on auto LPG, address policy issues stalling growth: Indian Auto LPG Coalition Details
8Indian state refiners near first annual deals to buy Russian oil Details
8AGR dues demand from Oil India a credit negative: Moody’s Details
8CAA protests in North East dent ONGC and Oil India's Dec output Details
8Oil India files petition for review of SC order on Rs 45,000 cr AGR dues Details
8Indian Oil signs MoU with Ghana oil regulator for assistance in LPG programme Details
8FM Sitharaman may raise disinvestment target for FY21 to Rs 1.5 lakh crore in Budget 2020 Details
8Crude story: Oil demand rises 1.8 per centduring April-December Details
8Ghana to replicate India's cooking gas success model Details
8India keen on importing more oil from Brazil Details

8China virus could hit oil prices by $3 per barrel - Goldman Sachs Details
8BP's Looney goes all-in on climate goals and explores overhaul Details
8US calls for immediate resumption of Libya oil operations Details
8Brazil to start discussions on joining OPEC in July Details
8Indonesia's Pertamina considers buying stake in Rokan block ahead of 2021 transfer Details
8Slovenia's largest fuel retailer Petrol nominates Popovic as new CEO Details
You can also click on Newsclips for more   Details
8Project Name: Bharuch Development Drilling and Production
8Project Cost: Rs 2393 crore
8Project Description: Oil and Natural Gas Corporation Limited is yet to award the contract for the hiring of EIA services for 145 wells development drilling project in Bharuch, Surat and Vadodara districts, Gujarat. As per the sources, the tender will be awarded by the mid of next month, subsequent to that the public hearing and EC process will be started. In the meanwhile, RFQs for the oilfield services and equipment will be released by March 2020. 
8Project Event: RFQ for the hiring of equipment and oil field services is expected by March 2020 instead of February earlier
Click here for more details
Details
What is the 2020 gas and LNG outlook globally?
8Where is the market headed?
8Ahead of its negotiations with Qater, Petronet LNG Ltd can derive some satisfaction from the fact that it is not the only company seeking better terms from long term suppliers as contract LNG,  mostly priced at a steep slope to crude oil, has become twice as expensive as spot LNG prices.
8Get all the data that you may need here.
Click on Reports for more Details
Ammonia Brownfield Project
8Cost - Rs 250 crore
8Project Event: The project is in the initial phase and discussion is ongoing, RFQ for the process licensor is now likely to be released in March 2020 instead of January. The preparation of the EIA report is still ongoing, a proposal for the environmental clearance is likely to be submitted in February 2020.
Click here for more details
Sulphuric Acid and Captive Power Unit Expansion Project
8Cost - Rs 300 crore
8Project Event: The project is considered for environmental clearance, and is expected to clearance in March 2020. RFQ for the EPC contractor is likely to be released in April 2020 instead of February as was anticipated earlier.
Click here for more details (Availabe only through www.indianfertilizer.com)
Details
Oil & gas giant McDermott International has filed for bankruptcy in the US as it has run into cash flow problems in the US
8McDermott has a big footprint in India
8The bankruptcy process will no doubt have a big impact on Indian operations. Some of the people working with MsDermott will find themselves dealing with new owners.
8The multinational has vendors in India, how will they be impacted?
Click on Details to find out more about what changes will take place here. Details
The hunt is on for new EIL chief.
8The present CMD retires in January, 2021.
8The petroleum ministry made some rather subtle amendments in the job description, it seems
Click on Details for more
Details
Has the golden run for gas, and in turn for LNG, begun in India?
8LNG imports were up 22% in December in relation to the same month in the previous year. This increases is despite a serious slowdown in the Indian economy.
8Part of the upsurge in LNG was fostered by an 7.9% decline in domestic gas production but lower LNG prices have had a hand in the upswing in imports
8The high price elasticity of LNG is proven yet again, it seems. Also gas demand has been buoyant enough, growing at a faster pace than general POL consumption.
8Lower prices predicted for 2020 will give a further impetus
Find out how much LNG prices are down in December.  Details
There is a center-state confrontation brewing over the recent environment ministry relaxation of the public hearing caveat for onshore and offshore E&P projects
8Public hearings are a way to voice grievances or opposition to projects particularly in economically sensitive areas and doing away with this caveat is seen as an affront to the local population around the affected areas as well as to state governments which conduct these hearings
Click on Reports for more
Details
The news can't be worse: POL consumption is down in December. In some sectors the slide is precipitous, pointing towards a severely slowing economy.
8Consumption of key industrial products are all down: Naphtha (-5.6%), Diesel (HSD) (-0.7%), Light Diesel Oil (LDO) (-11.4%), Furnace oil & Low Sulphur Heavy Stock (FO/LSHS) (-12.2%) and Bitumen (-8.4%).
8From April to December, we have had five months of negative growth. Consumption during the entire period is up only 1.8%
8Bitumen consumption is down, indicating that the momentum in road construction has petered out
8Diesel consumption recorded a drop over the December last year in the face of a 12.3% decline in commercial vehicle sales in December
8Consumption of FO/LSHS is down 12.2% on the back of weaker demand from power, fertilizer, petrochemical and steel.  .
8The ban on fuel oil use in Delhi, Uttar Pradesh, Rajasthan and Haryana should have led to an increase in the consumption of LDO, but offtake is down 11.4% in December
Click on Reports for more Details
8Project Name: Mehsana Development Drilling
8Project Description: Oil and Natural Gas Corporation Limited's mega project for the 406 wells development drilling in Mehsana, Patan, Ahmedabad and Gandhinagar is now finally picking up speed. ONGC along with its EIA consultant ABC Technolabs Limited is now planning to carry out the public hearing for the project on 3rd march 2020, despite its earlier stance of seeking an exemption from public hearing. It is pertinent to note that among the total number of wells, 211 wells are EOR wells and 195 are non EOR wells. 
Click on Details for more
Details
8Project Name: Dholpur District City Gas Distribution
8Project Description:  Torrent Gas has acquired Dholpur CGD Private Limited from the Essel Group and is now doing work in the CGD network. The CGD network will have a coverage area of 3028 sq. km.
For an overall timeframe of 8 years, Torrent Gas is expected to install 14 CNG stations, 18000 piped natural gas connections and lay 412 inch-km of steel pipe. GAIL, using the Vijaypur –Ibrahimpur-Dadri- LNG Pipeline (and a 30 km Ibrahimpur-Dholpur LNG Spurline) will bring LNG to the network.

8Project Event: RFQs for laying of MDPE pipes network and associated works is expected in Q2 2020.
RFQs for laying steel pipeline network and associated works is expected later in Q3 2020.
RFQs for further equipments for CNG stations are expected later in Q4 2020.
Click here for more details for key contacts and other project parameters
Details
Being a downstream man all his life, eyebrows were raised when BC Tripathi joined the Essar Group's E&P division as its chairman. One more senior level executive has joined up after him. More are to follow.
8Tripathi did not adhere to the mandatory cooling off period for a public sector executive when joining Essar but he had his reasons for not doing so.
8Find out more on what Tripathi is expected to do
Click on Details for more Details
For reference purposes the website carries here the following tenders:
8Supply of Nickel Catalyst Assy for Gas Chromatograph Details
8Laying of Coated Carbon Steel Pipelines Details
8Procurement of Catalyst Tube Assembly Details
8Procurement of PP Catalyst Details
8Procurement of Flow Tees for BGPL Project Details
8Procurement of Insulating Joints Details
8Consultancy Services for Cooling Water Network Optimization Details
8IA Compressor Package Reciprocating for installation of GTC Details
8Supply of Air Cooled Heat Exchanger for installation of GTC Details
You can also click on Tenders for more

For reference purposes the website carries here the following Newsclips:
8Reliance Industries is India's answer to Exxon, AT&T, Amazon - all rolled into one Details
8India, Brazil to sign 20 pacts during Bolsonaro visit to elevate strategic partnership Details
8GAIL ferries LNG in trucks over 1,700 km to fuel gas demand in east Details
8Essar appoints Pankaj Kalra as CFO of energy arm Details
8Relief to consumers as petrol, diesel prices dip further on Tuesday Details
8Goa: Tourism corp does U-turn, to lease out its fuel pumps Details
8Vedanta keen to Replicate Reliance-BP Model Details
8Oil falls again as amply global supply seen offsetting Libyan outage Details
8IEA's Birol sees 1 million bpd oil market surplus in H1 2020; says Iraq a concern Details
8Aramco IPO proceeds to fund Saudi industry, including defence: Finance minister Details
8OPINION: Mission Impossible, China can't meet its commitments on U.S. crude, LNG, coal: Russell Details
8Barclays raises 2020 oil demand forecast on expected global economic recovery Details
8Nigeria charges ex-attorney general with financial crimes in $1.3 bln oil deal Details
8Halliburton takes $2.2 bln charge on fracking, swings to loss Details
You can also click on Newsclips for more   Details
Ammonia-Urea Energy Saving Project
8Cost - Rs 481 crore
8Project Event: 90% of the project work has been completed. The installation of first and Second HRSG have been completed. The pre-commissioning is ongoing, the commissioning is likely to be completed in April 2020 instead of December
Click here for more details
Ammonia Greenfield Project 
8Cost - Rs 2773 crore
8Project Event: The project is likely to be submitted for environmental clearance in February 2020. The company needs Rs 600 to 700 crore addition capex which is under process. The RFQ for the contractor is likely to be released in March 2020.
Click here for more details
Details availabe only through www.indianpetroplus.com
Details
Now that IMO 2020 regulations are in place, what is the bunker fuel outlook for India?
8What is the demand?
8And where is the complaint fuel going to come from?
Click on Reports for more
Details
8Get the full year LNG import cargoes to India from the US here
Click on Reports for more
Details
 < 1 2 3 4 >  Last ›

Showing 51–100 of 247 items