The gas compression industry has a low entry barriers and yet competition seems to be low 8Contracts are begun to be awarded on a nomination basis 8At least three contracts worth over Rs 20 crore were awarded in this manner Click on Details for more
Details
Oil and Natural Gas Corporation Limited has awarded the contract for the installation of gas compressor at its Ankleshwar asset 8Cost Rs 116.60 crore 8Among those who bid were Kirloskar Pneumatic Co Ltd., Oriental EPC Private Limited, Tata Projects Limited and Esseh Turnkey EPC Pvt. Click on Details for more
Details
For reference purposes the website carries here the following tenders: 8ARC of Granular Activated Charcoal for Gas Sweetening Unit Details 8Procurement of LEL Detectors Details 8Procurement of pneumatic push fittings and PU tubing for DM plant Details 8Procurement of pipeline coating material Details 8Supply, installation & commissioning of Fire alarm and Detection System Details 8Supply of Heat Exchanger U Tubes Details 8Retrofit of Electronic Intelligent Actuator of CDU 2 Heater Soot Blower System Details You can also click on Tenders for more For reference purposes the website carries here the following Newsclips: 8ONGC sets up helpline for public safety Details 8Manipur regulates sale of fuel to check hoarding Details 8Reliance Industries topples IOC to become India's largest companyDetails 8Reliance, BP sign pact to set up petrol pumps under Jio-BP brand Details 8Nayara Energy cuts debt by Rs 4,600 crore Details 8Oil hovers near three-month high on trade optimism, supply cuts Details 8Opinion: Bullish oil bets surge after OPEC+ reaches deal on cuts Details 8Exxon, Chevron face new round of shareholder climate resolutions Details 8OPINION: Opec+ deal isn't worth the paper it's written on Details 8OPINION: Tough for China to buy enough US crude, coal, LNG and soybeans Details 8Russia's Sakhalin LNG plant plans maintenance in summer 2020 Details 8China set to add 1.2 bn tonne to proved petroleum reserves this year Details 8BP encounters gas in drilling offshore Mauritania, Senegal Details You can also click on Newsclips for moreDetails
Ammonium Nitrate and Nitric Acid Greenfield Project 8Cost - Rs 1375 crore 8Project Event: The project is waiting for the environmental clearance, RFQ for the LSTK contractor is likely to be released in March 2020. Click here for more details Phosphoric Acid Greenfield Project 8Cost - Rs 300 crore 8Project Event:The company is planning to purchase the land for the site, RFQ for the EPC contractor is likely to be released in April 2020 Click here for more detailsDetails
Find out how slower economic growth in India is impacting the global tanker market 8Crude imports have slowed down. Imports last year averaged 4.5 million b/d, but for the year to date are running lower at 4.4 million b/d, 8Then again, over the first 8 months of the year, India exported an average of 2.57 million tonnes of middle distillates per month. However, for the 3 months September to November, exports jumped to average 3.58 million tonnes per month and look set to remain above 3 million tonnes in December. Click on Reports for more
Details
Canadian LNG can be cheaper in India that those arriving from other destinations, including the US. 8Upstream costs can be really cheap in Canada 8If the correct regulatory environment is created in this environment-sensitive country, up to 100 MMTPA of new liquefaction capacity can come up in Canada Click on Details for more
Details
Get an update on IOC's Rs 4554 crore acrylics/oxo alcohol project 8The project will also involve the construction of a 15 km RLNG pipeline Click on Details for more
Details
8Project Cost: Rs 116 crores 8Project Description: Hindustan Petroleum Corporation Limited along with EPC contractor Optech Engineering Private Limited is carrying out the engineering activities to install an LPG bottling plant with a capacity of 120 TMTPA Click here for more detailsDetails
There is uncertainty now over BPCL's planned projects Our project monitoring software has given out Q2, 2020 as the possible RFQ dates for the following projects 8Petro Resid Fluidized Catalytic Cracking Unit (PRFCC), Mumbai Refinery, where EIL is the PMC as well as the EPC contractor. Click here for more details 8Mahul Refinery Polypropylene (PP) Unit Project (BPCL): EIL is the PMC and Honeywell UOP is the licensor. Click here for more details 8Bina Greenfield 2G Ethanol Bio-Refinery: PMC RFQs were floated, find out what has happened since. Click here for more details 8As HPCl prepared for privatization, get a full idea of the company here in terms of its various subsidiary, JV and affiliate companies, including their future plans. Click on Reports for moreDetails
8EIL is eyeing the consulting opportunities in two major projects -- The Rs 20,000 crore NRL expansion -- 1.2-1.5 mtpa naphtha cracker and petrochemical complex at HMEL at a cost of Rs 2400 croer 8Find out what kind of consultancy income that EIL is looking at from these projects 8Also know more on why EIL is looking inwards than outwards for business 8Know more on why EIL is bad at procuring private sector contracts Click on Reports for more.
Details
For reference purposes the website carries here the following tenders: 8Carrying out Heat Exchanger, Air Coolers Overhauling Jobs during 2020 Shutdown Details 8CNG Station Composite Works Details 8OTS Upgradation Project at refinery Details 8Rebuilding of UCT 2 A/ B/ C/ D/ E Cooling Tower with Pultruded FRP Structure Counter Flow Design Details 8Supply of full Surface Tank Fire Fighting Package Details 8Electrical Works at Coastal Installation Details You can also click on Tenders for more For reference purposes the website carries here the following Newsclips: 8Oilmen move PMO, seek review of BPCL valuation before sale Details 8Oil prices hit highest in three months as U.S.-China trade deal takes shape Details 8Maruti may do a U-turn on plan to ditch diesel Details 8Court orders probe against Vadodara Gas Limited directors Details 8India's exports contract for fourth straight month in Nov to USD 25.98 bn Details 8Assam, North East to face fuel supply problems if citizenship agitation continues Details 8Refineries, petrochemical plant shut; Assam, North-East headed for fuel crisis Details 8A new wave of petrochemicals expansion developing in Gujarat Details 8CAB protests: Oil India appeals to people in Assam to allow day-to-day operationsDetails 8Anti-Citizenship Act stir hits oil, gas output in AssamDetails 8Citizenship (Amendment) Act protest: Fuel scarcity hits ManipurDetails 8WPX in talks to buy Felix's oil and gas assets for $2.5 bln Details 8Norway plans North Sea power grid to cut oil industry's emissions Details 8Chevron says its Gulf of Mexico Anchor project will need $5.7 bn in investment Details 8Canada will consider climate plan in Teck oil project decision Details 8Equinor to export oil from Castberg field directly to the market Details 8Shell signs innovative $10 billion revolving credit facility Details 8DNO makes small oil and gas discovery in the Norwegian Sea -NPD Details 8Chinese led consortium to build Cyprus' gas import terminal Details 8Work at oil & gas fields hit, fuel crisis looms Details You can also click on Newsclips for moreDetails
ONGC's CB-ONHP-2018/2 exploration block. It is an OALP-2 award. 8Find out who won the 3D seismic award 8What kind of RFQs can be expected next? Click here for more detailsDetails
8Dholasan Oil Field Development is beign done through a JV made up of Hindustan Oil Exploration Limited, Gujarat Natural Resources Limited and Gujarat State Petroleum Corporation Limited, each with a 25%-30%-45% stake respectively. 8RFQ for the sucker rod pump is expected by February 2020. Click here for more detailsDetails
Get the latest update on Essar's Rs 1100 crore IB Valley CBM block activity 8Know more on why work on this project may get delayed 8And when will drilling work be now undertaken? Click here for more detailsDetails
For reference purposes the website carries here the following tenders: 8Procurement of SKF/ FAG/ NTN/ NSK/ TIMKEN make bearings Details 8Procurement of Molecular Sieves and Support Balls for Primary, Secondary and Liquid Dryer Details 8Procurement of 750 KW Motor for C2C3 LP Compressor Details 8Procurement of Gate Valve and NRV Valves Details 8Providing Security Services at SV Stations of Pipeline Section Details 8Soil Investigation Works for additional areas for Polyols Petrochemicals Project Details 8Procurement of CS Ball Valves Details 8Vessel Overhauling & Testing Jobs in GOHDS & CDU 1 Unit during shutdown Details 8ARC for double Coating & Wrapping for Under Ground Pipelines at Refinery, Oil Jetty, Sarapady etc for Capex Modification and Maintenance Jobs Details 8Design, Supply, Fabrication, Installation and Commissioning of Heavy Duty Rack System Details 8Procurement of LV Switchgear Panel with PDB Details You can also click on Tenders for more For reference purposes the website carries here the following Newsclips: 8Goa: Natural gas pipeline station on the anvil at Marcaim Details 8Nashik: BPCL to let LPG users pay by credit, debit cards soon Details 8BPCL privatisation: Roadshows to begin overseas from today Details 8India’s petroleum products demand to stay below 3 per cent: ICRA Details 8Automated petrol pump, first in Andhra, to come up in Vizag Details 8India’s petroleum consumption rebounds to 10.51 per cent in November Details 8Shrikant Vaidya to be the next chairman of IOCDetails 8Saudi Aramco hits crown prince's $2 trillion target Details 8Global oil prices set to be relatively low in 2020: IATA Details 8OPEC sees small 2020 oil deficit even before latest supply cut Details 8China's 2020 gas consumption seen rising Details 8Saudi Aramco set to hit $2 trillion market value on Thursday Details 8Russian gas pipeline project to face US sanctions Details 8Tokyo Gas, Chugoku Electric to cooperate on LNG procurement Details 8Oil prices stabilise on OPEC supply deficit forecast Details You can also click on Newsclips for moreDetails
The Rs 1542 crore Bina-Panki greenfield multi-product pipeline still has a few RFQs coming up 8When are they coming up 8Who is the key contact? Click here for more detailsDetails
8L&T has had a losing spree recently in refinery EPCC quotes, having lost by wide margins while bidding for the 2.4 MMTPA Delayed Coker Unit and Unsaturated LPG Treating Unit and 9 MMTPA open art Crude Distillation Unit and a 4.8 MMTPA Vacuum Distillation Unit in HPCL's Barmer refinery project 8But the dry bout ended yesterday.Details
8The North Balol Oil field development plan is worth Rs 240 crore 8Lot of interest has been generated against a selective RFQs workover drilling services and drilling tangibles Click here for more detailsDetails
What is the latest update on the DSF-1 Laxmijan drilling programme operated by Megha Engineering? 8PFR has been prepared 8RFQs are out Click here for more detailsDetails
ONGC has a Rs 957 crore CBM development coming up at Raniganj 8There are land overlapping issues with an adjacent airport operator 8Those are being resolved 8When will RFQs be out? Click here for more details for key contacts and moreDetails
The Shapoorji Pallonji JV with Malaysia-based Bumi Armada Berhad had bagged one of the largest contracts every given out in the oil and gas industry in India 8The JV won the contract to build a FPSO for the KG-DWN-98/2 with a total estimated cumulative value of a massive $2.1 billion dollars. 8Even so, the outlook does seem to be all that rosy for the JV partners for now, it seems Click on Details for more
Details
The economic slowdown is hitting demand for gas in industrial clusters. 8Business is down 15 to 20% and demand for gas is down accordingly down 8Find out more on how the switch to gas for Indian industrial clusters is a more complicated story than most would have us believe.
Details
8Bids for two more EPCC packages -- that of the Sulphur Recovery Block and the Diesel Hydrotreater and hydrogen geneartion unit -- have been opened for the 9 MMTPA Barmer refinery project of HPCL 8Find out who the bidders were, how much did the quote and who emerged L-1Details
For reference purposes the website carries here the following tenders: 8Procurement of HDPE Tarpaulins and Plastic Ropes Details 8Road and Drain works at Patalganga Details 8EPMC Services Pipeline at Patalganga Details 8Chiller replacement Jobs in Nitrogen-1 Plant refrigeration system Details 8Annual Maintenance Contract for UPS on PAN India basis Details 8Assess the health of existing underground oil and gas pipeline network at Rajahmundry Asset Details You can also click on Tenders for more For reference purposes the website carries here the following Newsclips: 8Ujjwala Yojana: 3.4 lakh beneficiaries were issued 2-20 refills in a day, points out CAG Details 8OPINION: India's economic recovery critical for oil in 2020: KempDetails 8Goa: Natural gas pipeline station on the anvil at Marcaim Details 8India's fuel demand growth hits 23-month high in November Details 8Nashik: BPCL to let LPG users pay by credit, debit cards soon Details 8Global oil prices set to be relatively low in 2020: IATA Details 8Brazil sees scope of cooperation with Bihar over biofuel and more Details 8Crude oil futures fall even as global prices surge Details 8European diesel margins sag before new shipping fuel rules Details 8UN says cannot confirm Iran behind Saudi oil attack Details 8Russia's Rosneft seeks Japanese investors for giant Vostok oil development Details 8Chevron expects $10 billion-$11 billion charge in fourth quarter; plans asset sales Details 8Saudi Aramco to be a good lead for a play on oil prices: David Lennox, Fat Prophets Details 8Springfield E&P says it has discovered 1.5 bln barrels of oil offshore Ghana Details 8Oil prices stabilise on OPEC supply deficit forecast Details You can also click on Newsclips for moreDetails
Ammonia-Urea & Captive Power Unit Greenfield Project 8Cost - Rs 7000 crore 8Project Event: The proposal for the terms of references has been granted but project activity is on hold, even though the management claims proposal for the environmental clearance is likely to be submitted in February 2020, in place of September 2019, RFQ for the EPC contractor, the promoters claim, is likely to be released after the environmental clearance. Click here for more details Single Super Phosphate Greenfield Project 8Cost - Rs 10 crore 8Project Event:The proposal for an environmental clearance is likely to be granted in March 2020. The new internal project committee has been form for the project, and the tender for an EPC contractor is likely to be released in April 2020 in place of November 2019 due to delay in the environmental clearance. Click here for more details (Available through www.indianfertilizer.com)Details
Project Name:Thiruvallur- Bengaluru Greenfield RLNG Pipeline Project 8IOC has completed the contracting for it, with the award of SCADA and automation job to Electronics Corporation of India Ltd 8Work is currently going on 8When is pre-commissioning and commissioning RFQs expected? Click here for more details for key contacts and other detailsDetails
ONGC has 700 km of pipeline network, mostly gathering and transportation lines, in its Rajahmundry Asset. 8Quite a bit of it pass through farmers' land. They also go through roads, canals, highways, railway tracks, bridges, qquatic farms etc 8Worried about spillage and possibility of accidents, ONGC is keen to do a non-invasive diagnostics of this vast but aging network, to figure out where repairs are urgently required. Click on Reports for more
Details
The website carries here an update on the proposed Petro Resid Fluidized Catalytic Cracking Unit (PRFCC), Mumbai Refinery 8EIL is the EPC contractor here 8Honeywell is doing the Front End Engineering Design What is status as of now? Click here for more detailsDetails
8Project Name: Koravaka Drilling Field Development 8Project Cost: Rs 110 crore 8Project Description:KEI-RSOS Petroleum & Energy Pvt Ltd is soon expected to issue is a selective tender for the hiring of various equipment and services for its in 9 well development drilling programme in Koravaka oilfield. 8Project Event: RFPs' for the equipment and services are expected by Q1 2020. Click here for more detailsDetails
8Project Name: Mehsana, Kheda, Ahmedabad and Gandhinagar Development Drilling 8It is a big Rs 4253 crore plan 8RFQs are expected for a drilling rig, a workover rig and associated drilling equipment and infrastructure Click here for more detailsDetails
There is a growing feeling among equipment and service provider that some if not all DSF field owners may not be that serious in pursuing the plans they had submitted to the DGH to win these blocks. 8Some of them are difficult to contact, quite a few do not have their own websites. Our analysts are left wringing their hands pursuing them for information, some of them cannot be located despite strenuous efforts. 8We cannot paint all promoters with the same color. We have noticed in DSF-I blocks, serious promoters have already begun work, orders for equipment and services are being placed. In DSF-2 blocks, however, there is an overall postponements of plans, what was meant have started in Q-4, 2019 has been put off to Q-2, 2020. Little on ground activity has been noticed. 8"Most of them are just whiling their time, and given low crude and gas prices, many will just end up winding up their operations," one rig provider told this website. 8But our analysis shows that may not entirely right. Over the next few days, we will provide a holistic updates on these blocks, with a large volume of actionable information for our viewers For now, here are updates on two DSF blocks, where the promoters claim they are putting together plans to move ahead 8Project Cost: Rs 150 crore 8Project Event:RFQs for PMC is expected late in Q1 2020. RFQs for seismic survey and seismic data interpretation for the block are expected in Q2 2020. RFQs for EIA consultant is expected in Q2 2020. Click here for more details 8Project Cost: Rs 250 crore 8Project Event:RFQs for PMC is expected in Q2 2020. RFQs for seismic survey and seismic data interpretation for the block are expected in Q2 2020. RFQs for EIA consultant is expected in Q2 2020. Click here for more detailsDetails
What is the reason proffered by ONGC for closing the tender for two onshore fields under the Production Enhancement Contract? 8Kalol and Geleki were the two fields for which EOIs were sought and a series of meetings were interactions were held with the three main service providers, Baker Hughes, Schlumberger and Halliburton 8Eventually, while Kalol did not attract any bid, Schlumberger made a valiant attempt to working out a PEC for the Geleki field but differences over baseline production and decline ratios torpedoed a deal. 8Meanwhile, even as an EOI has been floated for 64 fields under the PEC format, ONGC has come out with an ingenious reason why it abandoned the PEC regime for the Kalol and Geleki fields. Click on Details for more
Details
Pakistan and Bangladesh will consume more LNG than India between now and 2030, according to a set of new projections 8And despite current headwinds, LNG producers see better prospects ahead 8Clearly, the glass is half empty or half full, depending upon whether you are a seller or buyer of LNG Click on Details for more
Details
Dismantling ships is one of the most dangerous professions in the world, both for workers and the environment, with high levels of fatalities, injuries and work-related illnesses stemming mainly from hazardous materials on board. 8Regulations -- such as the Hong Kong Convention for Safe and Environmentally Sound Recycling of Ships (HKC) and the EU Ship Recycling Regulation (EU SRR) -- are in now in place to ensure that the activity is environmentally compliant. 8The point to note is that the Indian ship dismantling industry has slowly began the transformation to become complaint with the new laws Click on Details for more
Details
Swan Energy has admitted that its 5 MMTPA LNG project is going to be delayed 8The company is setting up a FSRU along with a Floating Storage Unit (FSU) in Jafrabad, Gujarat 8According to initial plans, the FSRU was meant to have been delivered in December, 2019 Find out when is it scheduled to come up now and what are the real reasons for the delay.Details
Corporate social responsibility (CSR) spending of public sector oil companies is one of the largest sources of patronage in India. 8ONGC is the largest CSR spender in India, with a budget of over Rs 600 crore annually. 8But other public sector oil companies are big spenders too. 8The website carries here details of CSR spending by all public sector companies here Click on Reports for more
Details
Many believe that it is geography and politics which have come in the way of the Turkmenistan-Afganistan-Pakistan-India (TAPI) pipeline. The pipeline is regarded as a security and logistical nightmare as it will pass through some of the most dangerous terrains in the world. 8But that is not true. The real reason why the pipeline has not taken off so far is anchored economics and not logistics Click on Details for more
Details
8It is a good time to be a domestic manufacturer of casings and tubings for an Indian manufacturer. The Make in India policy caveats have ensured domestic manufacturers have a monopoly over a large variety of casings and tubings required by the oil & gas sector.Here is a Rs 500 crore order for seamless casings recently cornered by one Indian manufacturer. Click on Details for more 8A new JV has been formed to push city gas distribution in the North East of India. Click on Details to know more 8The commissioning of the Hazira-Dahej naphtha pipeline is going to be big cost saving boost for ONGC as well as ONGC Petro additions Ltd. That way the costly sea route to deliver naphtha from ONGC's plants can now be avoided. Click on Reports for more 8NQP Process Platform Gas Dehydration Unit Revamp: Oil and Natural Gas Corporation Limited has awarded the LSTK contract for the revamp of a Gas Dehydration Unit for the NQP offshore platform for Mumbai High field. Click here for more details 8KEI-RSOS Petroleum & Energy Pvt Ltd is soon expected to issue is a selective tender for the hiring of various equipment and services for its GS-KV 1 offshore block. Click here for more details 8HPCL had hired PDIL as the EPCM for the Rayagada Greenfield LPG bottling plant: Most jobs have been awarded but a few RFQs are still in the pipeline Click here for more detailsDetails
For reference purposes the website carries here the following tenders: 8Hanging hardware for MPDs to be used at retail outlets all over india Details 8Engagement of consultant for Detailed Feasibility Study on Adblue/ Diesel exhaust fluid ( AUS 32)- Market study/ operational model identifying strategic locations for manufacturing considering optimum supply chain logistics network Details 8Green Belt Development Phase-II for PDPP Details 8Inspection, Maintenance and Servicing of Fire Protection Systems at Pipeline Locations in Western, Central, Northern & Southern Regions of Pipelines Details 8Supply of Mono Ethylene Glycol (MEG) Details 8Supply of Pressure Type Dispensers and Pressure and Suction Type MPDs Details You can also click on Tenders for more For reference purposes the website carries here the following Newsclips: 8Petrol price remain on a one-year high in Delhi Details 8Nitin Gadkari reiterates indigenisation of alternate fuel to reduce import burden Details 8Executives at Indian state-run companies oppose privatisation of refiner BPCL Details 8Public sector officers’ association against privatisation of BPCL Details 8Gazprom undersea pipeline to provide gas to Pakistan, India Details 8PSU divestment not on the basis of profit or loss: Govt Details 8Companies can recover full exploration cost from new discoveries only: Oil Ministry Details 8RIL, ADNOC in pact to explore setting up Ethylene Dichloride JV Details 8BPCL disinvestment a change of stance from Govt: CEADetails 8Pradhan meets Japanese counterpart Hiroshi Kajiyama, seeks investments in energy, steel Details 8Fitch revises outlook on Cairn India to negative Details 8Indonesia eyes biodiesel with 40 per cent bio-content during 2021-2022 Details 8Russia-Ukraine gas talks to continue in coming days: Gazprom CEO Details 8Non-Saudi investors get 23 per cent of Aramco IPO institutional tranche Details 8Oman's 2020 crude oil premiums mostly unchanged from this year Details 8Spread between US. oil and natural gas hits highest since September Details 8Israel tells energy companies to hold fire on Cyprus gas project Details 8Oil prices slip again as spectre of trade war, demand concerns haunts market Details 8As petrol prices rise, more Egyptians convert to duel-fuel vehicles Details You can also click on Newsclips for moreDetails
Chinese contractor Wuhuan has subcontracted a technology licensor for its ammonia synthesis in the Talcher ammonia-urea unit set up through the coal gasification route. 8The licensor will provide License and Basic Engineering Design (LBED), catalyst, and proprietary process equipment for the plant Click on Reports for more Details
Damage was inflicted on the all-important Dahej LNG terminal of Petronet LNG Ltd after an LNG tanker collided into into its south jetty 8How long will repairs take? 8And how much of the terminal's capacity has been damaged? Click on Details for more
Details
EIL's tenders for 1.5 MMTPA refinery in Mongolia to be financed by India through a $1 billion credit line is expected to receive a good response 8One caveat in the loan is that a majority of orders will have to be placed on Indian companies. 8Find out which technology licensors are likely to bid for as many as eight packages that EIL had tendered out Click on Details for more
Details
Sulphuric Acid Expansion Project 8Cost - Rs 100 crore 8Project Event: The project is in the initial phase of commissioning. 95% of installation work has been completed. The commissioning has been delayed by 3 month but now expected by end of December 2019 instead of November as was stated in our last update. Click here for more details Ammonia and Captive Power Unit Greenfield Project 8Cost - Rs 1920 crore 8Project Event:The project has elicited the terms of references but project activities has been on hold and are likely to start in January 2020. A pre-feasibility study is ongoing, And the proposal for environmental clearance will be submitted in February 2020. after that plans will be drawn up to hire a contractor and related services. Click here for more details (Available only through www.indianfertilizer.com)Details
8Project Name: Disaijan Oil Field Development 8Project Cost: Rs 100 crore 8Project Description: Invenire Energy Pvt. Ltd's DSF 2 block, AA/ONDSF/DISAIJAN/2018, is still in the planning stage and as of now, no definite contracting schedule has been prepared. Although after a conversation with a representative of the company, it is now known that further developments are expected by Q2 2020. Click here for more detailsDetails
Get the latest status here on the NRL-promoted Golaghat Greenfield 2G bio refinery 8The project is in the middle of contracting 8Some RFQs are still left to come out Click here for more detailsDetails
8ONGC's Platform Supply Vessel tender, in which the vessel needs to have the capacity to make pure water while also be equipped with fire fighting capacity has run into a bit of a problem, it seems Find out more
Details
It is an LPG bottling plant 8Cost is Rs 195 crore 8Land acquisition is a problem area but is currently ongoing 8When can an EPCM contractor be expected, get key contacts here Click here for more detailsDetails