All content in this website is sourced legitimately

Archives


All the news items since the launch of our web site are preserved in the archive section. The archive entries are freely accessible to all the users.


Oct 2018

8SJVN has expressed grave concern over lack of payment for outstanding payments from UPCCL.
8The bill amount is mounting and is currently pegged at Rs 335 crore
Click on Reports for more.
Details
A joint petroleum ministry-DGH team is traveling all over the world soliciting global E&P companies to invest in India. There was an expectation that the new OALP parameters will serve as a bait to attract FDI into the Indian E&P sector.
8Find out more on how the government will have to do much more work than make presentations on the salient features of the new exploration policy to attract investments.
8What is needed is not the fine-tuning of its exploration policies, as that has been done already, but an overhaul of the manner in which it outreaches potential investors.
8The standard road show model has not yielded results a new one will have to take its place
Click on Details for more Details
The current City Gas Distribution (CGD) model is dangerously flawed  despite the success of the latest CGD Round
8The risk of default or contract renegotiations looms ahead on account of faulty modeling.
8While the immediate outlook continues to stay bright, the hefty profit margins of CGD companies are likely to be drastically trimmed going ahead.
8The risks are multi-pronged.
8The possibility of a dramatic change in circumstances is more real than before.
Click on Reports  to know more   Details
The fact that high crude prices will shrink demand for petroleum products can be evidenced from no other country than India.
8Despite a strongly growing economy and a rise in passenger vehicles, demand has been adversely impacted, both in the transportation and industrial segments.
Click on Reports  and Details for more
   Details
Latest data compiled by Air India shows that India pays the highest ATF prices compared to other major airports in the world.
8And yet ATF demand in India continues to surge
Click on Details and Reports for more
   Details
Two of the world's largest privately owned refineries in India are trying to push private sector POL sales in the country.
8And yet, their market share, of between 22 to 24%, over the last one-and-half years has not changed much.
8Will the reintroduction of subsidies on petrol and diesel change this paradigm.
8Yes, but not by much.
Click on Reports  and Details for more Details
Get a full listing of Indian vessels under the following categories, along with tonnage
8Crude carriers
8Product carriers
8Offshore supply vessels
8Specialized vessels for offshore services
8LPG carriers
Click on Reports  for more Details
A Rs 800 crore private sector E&P investment is coming up in a new block.
8The development plan is being drawn up
Click on Details & Report  for more Details
2013-14 and 2014-15 have seen the highest deepwater drilling activity in India
8The number of drilling rigs deployed is witnessing a fall but the number of wells drilled is showing an increase.
8As of recently, a total of 47 offshore drilling units are under deployment in India
Click on Reports  and Details for more Details
For reference purposes the website carries here the following tenders:
8
Corrigendum: Hiring of Technical Consultant for G&G and other studies Details
8Corrigendum: Procurement of USM Based Dual Stream Metering System Details
8Procurement of Pressure and Temperature Gauge for Uran Plant Details
8Procurement of Linear Alkyl Benzene Sulphonic Acid Details
8Hydro Testing of various size Line Pipes at various O&M Bases Details
8Supply of Sample Bomb Skids to refinery Details
8Project Management Consultancy Services for Polyols Petrochemicals Project Details
8Supply, Installation and Commissioning of High Mast Towers Details
8Flare Mitigation Study of Existing and Proposed Process Units Details
8Appointment of GST Auditor Details
8Corrigendum: Procurement of CS Pipe Line Locator for City Gas Distribution Project Details
8Supply, Installation, Commissioning & Training of Solid Oxide Fuel Cell Research Details
You can also click on Tenders for more

For reference purposes the website carries here the following Newsclips:
8Rising air pollution will impact rainfall patterns in India: UN report Details
8Iran says US sanctions will have 'severe consequences' for world order Details
8SC pet coke verdict may hit aluminium sector investment: Report Details
8Turkish ship to drill for oil and gas in Mediterranean: Minister Details
8Philippines short-lists three company groups for LNG terminal project Details
8All private cars in Delhi will be stopped from Nov 1 if pollution worsens: Official Details
8Kuwait's emir says economic reforms needed despite higher oil prices Details
8PetroChina quarterly results rise to highest in four years Details
8ABB India Q3 net profit up 30% to Rs 108.34 crore Details
8Bitcoin can push global warming above 2 degrees celsius by 2033: Study Details
8Energy firm BP profits soar to five-year high Details
8BPCL to shut crude unit at Kochi refinery for 3 weeks from December 1 Details
8Bengaluru: Gas leaks as metro corridor work damages Gail pipeline Details
8Delhi's air on brink of turning severe, worst pollution of season recorded on Tuesday Details
8Air quality in Delhi NCR to worsen in two days Details
8IL&FS crisis: Normalcy to return to system in couple of weeks, says SBI Chief Details
8US govt official says country to become key source of global energy supplies Details
8Indonesia does not need to import gas until 2027 at current demand growth rate, says official Details
8Libyan state oil firm demands pay increases for oil workers Details
8Trafigura's Puma Energy appoints new CEO Details
8India stages roadshow in UK to attract investors for oil, gas sector Details
8Oil prices rise for first time in three days, but trade war fears drag Details
8COLUMN-Oil prices fall as economic outlook deteriorates: Kemp Details
8Indoor pollution in India contributes up to 52 pc air pollution: UNEP Details
You can also click on Newsclips for more  
Details
Project Name: Thermal Power Station - FGD Addition
8Project Cost: 700 crores
8Project Description: Owner along with consultant have submitted a feasibility report for implementation of a sea-water based flue gas desulphurization system in the 2x600 MW units thermal power plant. Discussions regarding project schedule for FGDs is in process. Tenders for the same is expected soon.
8Project Event: RFQ of an EPC package for supply, installation, construction, and commissioning of the sea water based FGDs is expected by December 2018.
8Expenditure Approval: Q1:2019
8RFQ Date: Dec/2018
8Release Date: Dec/2018
8Start Date: 2020
8Completion Date: 2022
Click here for more details
8Project Name: Thermal Power Station - Installation of FGD
8Project Cost: 500 crores
8Project Description: Promoter is looking out for financial institutions for funding of WFGDs at its 1000 MW thermal power station. The project report has been prepared by Development Consultant Private Limited and submitted to the state government. The project is getting delayed at the state electricity regulatory authority as of now. Further bids are expected soon.
8Project Event: RFQ for design, supply, installation, erection, and commissioning of WFGDs is expected by December 2018, instead of Sept 2018.
8Expenditure Approval: Q3:2018
8RFQ Date: Dec/2018
8Release Date: Dec/2018
8Start Date: 2020
8Completion Date: 2022
Click here for more details
(You will be able to access the links here, only if you have a password to our sister site, www.energylineindia.com) Details
Coal based Ammonia-Urea & Captive Power Plant Greenfield Project 
8Cost - Rs 6500 Crore
8Project Event: The project is in initial phase, The proposal for the environmental clearance is likely to be submitted in February 2019, and RFQ for the EPC contractor is likely to be released in March 2019.
Click here for more details
Ammonium Nitrate and Nitric Acid Greenfield Project

8Cost - Rs 1375 Crore
8Project Description: A Fertilizer company is planning to set up a new unit of ammonium nitrate and Nitric acid with a capacity of 1100 MTPD and 1000 MTPD in India.
8Project Event: RFQ for EPC contractor is likely to be released in January 2019 though it was anticipated to come out earlier
Click here for more details
SSP Fertilizer Greenfield Project

8Cost - Rs 90 Crore
8Project Event: RFQ for LSTK contractor has been re-released due to technical reason and finalization is under process, it is likely to take around three months for the selection process to be over.
Click here for more details (These links are only accessible to those who have a password to our sister site, www.indianfertilizer.com)
Details
A Rs 500 crore private sector oil field development is looking at picking up workover rigs
8The development drilling project is concentrated on three fields
8When is the RFQ expected?
8Who are the key contacts?
Click here for more details
Details
The hiring of a drilling unit to begin the development of 90 wells has been delayed due to environmental clearance issues.
8The projected investment is Rs 3500 crore
8It also involves hiring of contractors for infield pipelines and production installations
8RFQs are now expected in Q1, 2019.
Click here for more details, including key contacts
Details
The eligibility norm will allow for deployment of older vessels
8Find out why ONGC was forced to bring about the change
Click on Details for more Details
A greenfield bottling plant is coming up in the North East of India
8The PFR consultant has been hired
8RFQ for an EPC contractor is expected in February 2019.
Click here for more details  Details
A two-year maintenance contract for a delayed coker unit is coming up
8Know more about who it is
Click on Details for key contacts
Details
The owner has floated a bid for an EPC package in an 800 MW super-critical thermal expansion project.
8Major EPC companies have shown their interest in the pre-bid meeting.
8The project was on hold for 3 years due to corporate insolvency and a bankruptcy case filed with the old EPC contractor.
8The new EPC contractor may choose to go with the existing sub-contractors as substantial engineering progress has been achieved.
8PMC contractor has been awarded the work for evaluation of bids.
8Further bids are expected soon.
8Project Cost: 7000 crores
8Project Event: RFQ for the price bid is expected by the end of November 2018.
8Expenditure Approval: 2014
8RFQ Date: 28/Nov/2018
8Release Date: 30/Nov/2018
8Start Date: Jul/2014
8Completion Date: 2021
Click here for more details

8Project Name: Greenfield Thermal Power Project
8Project Cost: 1970 crores
8Project Description: Promoter is getting delayed in coming out of an EPC package bids for a 400 MW coal-based thermal power plant due to the pending approval for supply of imported Indonesian coal. EC has been granted. Further bids are expected soon.
8Project Event: RFQ for an EPC package is expected by December 2018, instead of Sept 2018.
8Expenditure Approval: Q4:2017
8RFQ Date: Dec/2018
8Release Date: Dec/2018
8Start Date: 2020
8Completion Date: 2024
Click here for more details
(You will be able to access the links here, only if you have a password to our sister site, www.energylineindia.com) Details
Coal Gasification Unit Greenfield Project  
8Cost - Rs 4750 Crore
8Project Event: The tender for LSTK contractor has been released and L&T, Tata Project, Wuhuan Engineering and Chinese company are in the race for the LSTK contractor. the price bid are not open yet, but the deal is likely to be finalized in January 2019.
Click here for more details
Ammonia-Urea Energy Saving Project
8Cost - Rs 262 Crore
8Project Event: The purchase of long lead item is ongoing and so is detail engineering. Ccommissioning is likely by November 2019
Click here for more details (Access to these links are not available unless you are a subscriber to our sister site, www.indianfertilizer.com)
Details
If you are a large engineering and EPC contractor, what kind of an executive training programme should you have?
8Clearly, if there are hundreds of executives, the programme has to be substantive.
8Multiple programmes will have to be run simultaneously.
Find out more click on Reports . Details
LNG carrier rates have begun moving north. The first signs of a tightening of the market is already there. The market seems already sold out.
8What is more, a majority of new builds have already been contracted out. Availability of spot vessels are at their lowest levels now.
8The market turns deficit next year, and this will push up carrier rates.
8A deficit of about 40 vessels is expected given start-up of about 96.5M MMTPA of new LNG in the period 2018-2022.
Click on Reports  to get all the accompanying data. Details
If you are looking for a one-stop shop for water and waste treatment-related solutions, there are many providers
8But which is the one-stop shop that you should go to for the best solutions?
8Here is an offer for a single window for best globally available technologies across entire water treatment spectrum
Click on Reports  for more Details
Essar Oil and Gas Exploration and Production Ltd has changed the development model for one of its CBM fields.
8Essar is now planning to carry out a 450 well development drilling programme instead of 150 wells envisaged earlier.
8And that will mean a change of gear. The capex is pegged at Rs 3000 crore
8RFQs for the hiring of rigs are expected in Q01, 2019.
8Opportunities will also come up for Hydro Fracturing services, CBM Well completions, Artificial Lift, Cementing Services and Mud Engineering Services.
Click here for more details for key contacts and other project related information.
Details
Militants had pushed Oil India Ltd and ONGC out of oil-rich Nagaland exploration blocks but these companies are now looking at coming back in.
8Nagaland is the big imponderable among Indian oil & gas basins. There are some who harbour the hope that the state, adjacent to Myanmar, may hold large reserves of oil & gas. If there is the possibility of finding an onland super basin, it will have to be in Nagaland they think.
8One of the two oil companies is now planning a  Rs 500 crore programme, starting with the conducting of a seismic survey for the development of the Schuppen Belt and nearby oil field awarded to the company under NELP VI in Nagaland.
8Project Event: RFQ for hiring services for the 3D seismic survey is expected by December 2018.
8Expenditure Approval: Q2/2018
8RFQ Date: Dec/2019
8Release Date: Jan/2019
8Start Date: Q2/2019
8Completion Date: Q4/2020
Click here for more details and key contacts.
Details
The contract was awarded for Rs 34 crore
8The contract involves 2D seismic data acquisition, processing and interpretation for the un-appraised on land areas of Ganga-Punjab region
Click on Details for more
   Details
8Project Name: Cauvery Basin Refinery Greenfield BS-VI Project
8Project Cost: Rs 1858 crore
8Project Event: RFQ for the Mechanical work is expected by January 2019.
8Expenditure Approval: Q4:2016
8RFQ Date: Jan/2019
8Release Date: Feb/2019
8Start Date: Q1:2017
8Completion Date: Q4:2019
Click here for more details 

8Project Name: Cauvery Basin Refinery Greenfield RLNG Project
8Project Cost: Rs 421 crore
8Project Description: Chennai Petroleum Corporation Limited has hired Engineers India Limited as the PMC contractor for the revamping of the Hydrogen Generation Unit (HGU) as well as modification in Gas Turbine and Boilers, which will lead to replacing the use of naphtha and fuel oil with RLNG, to be supplied by IOCL, in the Cauvery Basin refinery at Nagapattinam, Tamilnadu. A lot of work has already been completed.
8Project Event: RFQ for the ISBL (Inside Battery Limits) network work for HGU is expected by December 2018.
RFQ for Boiler 4 is expected by January 2019.
8Expenditure Approval: Q2:2017
8RFQ Date: Dec/2018
8Release Date: Jan/2019
8Start Date: Q1:2018
8Completion Date: Q3:2020
Click here for more details 

8Bharat Petroleum Corporation Limited is planning to float a short-term contract for insulation work for pipes, vessels, tanks, exchangers and other types of equipment in its existing Mumbai refinery at the time of shutdown. The contract period will be for two years. Get the key contact here. Details
Testing of High Pressure High Temperature deepwater wells is always a challenging proposition.
8The current solution is to use Cesium Formate Brine but this is an expensive proposition and it is also corrosive and carcinogenic
8ONGC has now hit on an alternative solution and is trying out on a nomination basis.
8And if the testing is successful, there will be a lot of business will come in for the seller
Click on Details for more Details
For reference purposes the website carries here the following tenders:
8
Supply of HSD on Annual Rate Contract Basis Details
8Lease of Markfed Sites for 20 years for Oil Companies to setup Petrol Pumps Details
8Hiring of Mobile Offshore Production Unit at Well Platform of Western Offshore Details
8EOI for hiring of Catering and Housekeeping Services for a period of three years Details
8Corrigendum: Procurement of Tank Bottom Flush Valves for refinery Details
8Supply of Exchanger Tube Bundles Details
8Transportation of Bulk POL products MS HSD and Branded fuels by Road ex Tinsukia Details
8Transportation of Bulk POL products MS HSD and Branded fuels by Road ex Dimapur Details
8Procurement of Pipes, Isolation, Valves, Flanges, Elbows, Strainer and Stud Bolts Details
8Hiring of services for WAO process cooler tube sheet grove cutting and channel head flange surface machining for ethylene cracker unit Details
8Material Handling for Pipeline Project Details
8Statutory Inspection, Hydrostatic Testing and Recertification of Horton Spheres installed at C2C3 Plant Details
8Procurement of Insulating Joints for Pipeline Project Details
8Corrigendum: Supply of 180,000 Kg of OSD for regular use Details
8Corrigendum: Procurement of Flow Tees for Pipeline Project Details
8Corrigendum: Procurement of Pipe Wrenches Details
You can also click on Tenders for more

For reference purposes the website carries here the following Newsclips:
8S Africa coal belt among world's pollution hotspots: Greenpeace Details
8Europe's air pollution still exceeds limits, must improve Details
8China's BYD expects 2018 profit to fall by a third as competition rises Details
8Scottish Power to replace gas, hydro projects with UK offshore wind Details
8SC prohibits plying of 15-yr-old petrol, 10-yr-old diesel vehicles in NCR Details
8Deadline looming: India, China resist Washington's call to end Iran oil purchases Details
8At least six companies willing to partner India in second phase of strategic oil reserves Details
8Petrol, diesel prices cut for 12th straight day Details
8India Inc investment in overseas ventures drop 47% to $ 1.54 billion in Sept Details
8After years of global success, Reliance Industries faces oil shock at home Details
8OPINION: Trump plays a part as Asia's diesel profits surge, gasoline plummets Details
8UAE's RAK Gas signs production sharing agreement with Zanzibar Details
8Vedanta wins 10-year extension for Rajasthan oil block Details
8EPCA agrees to CPCB recommendations made for first 10 days of November Details
8India's BPCL Q2 profit almost halved by refinery fire, misses estimates Details
8India home to 3 of the largest NO2 emission hotspots: Greenpeace Details
8As Delhi's air quality deteriorates, global reports express concern Details
8High oil prices hurting consumers, could have adverse implications for producers-IEA Birol Details
8Fuel prices witness downward trend on Tuesday Details
8Trafigura denied licence to operate fuel pumps in India Details
You can also click on Newsclips for more  
Details
The east coast of India is expected to see one more LNG terminal coming up
8It is going to be an FSRU, with a processing capacity of 3.4 MMTPA . The cost is pegged at Rs 1300 crore
8A 20-25 year old vessel of 138,000 m3 will be converted to an FSRU.
8The idea seems to be to feed neighbouring industrial sites. A virtual pipeline network will also be built
8The integrated privately promoted facility will also have a capacity to process 1 MMTPA of LPG and 2 MMTPA of other petroleum liquids.
8If the capacity goes up beyond 2.4 MMTPA, the FSRU will give way to an onland regasification complex
Click on Reports for more Details
While the drop in wind power tariff to Rs 2.64 per unit, at an auction conducted by Solar Energy Corp. of India Ltd earlier this month may have been heralded as a big step forward, critics are pointing out that the true cost of renewable energy has not been transparently tabulated in India as yet.
8Calculating the true cost of hidden subsidies and the variability elements in renewable power can give competing energy suppliers, such as combined cycle gas based power plants significant leverage to push forward their point of view.
Click on Reports for more Details
Oil & gas aggregate service and supply companies are increasing cornering orders for equipment and services.
8Single product suppliers are giving way to aggressive aggregators, capable of providing multiple choices from different companies for a single oil & gas equipment.
8Aggregating logistics from multiple storage points is used as a differentiator
8There are two companies, global in scale, making big inroads into India
Click on Reports for more Details
About 55% of the India’s timber requirement is catered through Kandla Port.
8Gandhidham, located in proximity of the the port, has around 400 saw mills which process 25 lakh cubic meters of wood per annum
8These mills generate around 1000 tonnes of wood wastes
8An innovative company is now converting these wastes into wood pellets which are then used in combustion chambers of industrial boilers
8The manufacturer has an in-house team that helps users collect Carbon Emission Reduction certificates and comply with pollution reducing regulations
Click on Reports for more Details
A foreign company is now providing "track and trace" technology for biofuels.
8As a spate of biofuel plants come up in India, it will perhaps become mandatory at some point in time to be able to "track and source" biomass needed to manufacture biofuels
8There is one company capable of providing solutions for tracking and tracing every tonne of bio raw material that goes into the manufacture of biofuels
Click on Reports for more Details
The bio-gas production drive by oil marketing companies is expected to hit a feedstock availability bottleneck
8Eventually the drive can boomerang as green house emissions may go up instead of down because of increasing production of biogas
8There are many who believe that the there is no way to organic carbon from bioenergy without harming the environment, with direct or indirect impact on food security.
8On the other hand, the bio-energy drive can trigger a chain reaction in agriculture by encouraging technology that is capable of integrating biogas production, sequential cropping and precision farming to produce GHG neutral or even GHG negative BioEnergy while Capturing and Sequestering Carbon (BECCS)
8And it an be the bio-gas industry, along with the public sector oil companies, which can act catalysts for this change to occur
Click on Reports for more Details
The Rs 100 crore pipeline is for a distance of 45 km
8Environment clearance delays have meant the postponement of the RFQ for a contractor
Click here for more details  Details
8Project Name: Kochi-Mangalore gas pipeline project
8Project Cost: Rs 3400 crore
8Project Event: RFQ for the pipeline laying work for a 435 Km section is expected by January 2019.
8Land acquisition is on hold in Tamil Nadu.
8Unprecedented floods have further impacted progress, with construction equipment submerged
8Commissioning date is Q4,2020
Click here for more details for a full update on this project in our software Details
Pilot wells are to be drilled initially.
8RFQs for the Drilling rigs, Wireline logging, Hydrofracturing Unit, Cementing Unit, Well Stimulation, Casing Pipes are expected
8Start date at the site is Q-4, 2019
Click here for more details, including key contacts
Details
An 8-well offshore development drilling is envisaged
8These wells are to be connected to an existing unmanned platform using a subsea pipeline and then onwards to an Onshore Gas Processing Plant.
Click here for more details
Details
Two bidders had to be disqualified
8Three were qualified, and Offshore Marinetech eventually emerged as the winner for the Rs 28 crore job
Click on Details for more Details
The JV is looking for a technology supplier for catalysts
8Caveat is that catalyst supplier should not be in partnership with diesel hydrotreating process licensor.
Click on Details for more
Details
Project Name: Greenfield Hydroelectric Project
8Project Cost: 1925.25 crores
8Project Description: Owneris undertaking additional S&I activities along with social impact assessment activities in a 270 MW greenfield hydel project on BOOT basis. Extension for the validity of TOR was granted. The EIA consultant is writing out the final EIA report. The public hearing is expected to conduct by the next 3 to 5 months. The project is getting delayed due to awaiting forest and wildlife clearance. Further bids are expected soon.
8Project Event: RFQ for the drilling and drifting works is expected by the Q2 2019.
 RFQ for the civil and H&M works is expected by the Q3 2019.
8Expenditure Approval: Q3:2019
8RFQ Date: Q2:2019
8Release Date: Q2:2019
8Start Date: 2020
8Completion Date: 2025
Click here for more details

8Project Name:  Thermal Power Station Maintenance Project
8Project Cost: 5 crores
8Project Description: Promoter has planned a 35-day scheduled annual overhaul in the 2000 MW Thermal Power Plant. The last annual overhaul in the unit-3 was successfully done as per schedule. The major scope of work includes inspection and round the clock maintenance of low-pressure turbine, high-pressure turbine and balance of plant area. A bid is expected soon.
8Project Event: RFQ for required maintenance activities is expected by mid-November 2018.
Click here for more details (Access is available to those will a password to our sister site, www,energylineindia.com)
Details
Energy Saving-cum- Ammonia-Urea Expansion Project   
8Cost - Rs 540 Crore
8Project Event: Tender for critical equipment is already released in February 2018. Technical evaluation has been completed for the long lead item,. These items take a minimum four to six months to deliver. Construction work is likely to be started in Q1 2019.
Click here for more details
Phosphoric Acid Greenfield Project

8Cost - Rs 10 Crore
8Project Event: The proposal for the environmental clearance was submitted in June 2018, Public hearing has been completed and proposal for the environmental clearance is likely to be elicited in September 2018. The hiring process is ongoing for an EPC contractor.
Click here for more details
Single/Triple Super Phosphate Greenfield Project
8Cost - Rs 30 Crore
8Project Event: The proposal for environmental clearance was submitted in June 2018, and proposal accepted by SEAC, selection process of EPC contractor is ongoing.
Click here for more details (Access to these links are available only to those who have a password to our sister site, www.indianfertilizer.com)
Details
For reference purposes the website carries here the following tenders:
8Corrigendum: Market Survey and Natural Gas Demand Assessment Details
8RProcurement of Liquefied Petroleum Gas Details
8Provision of Land Rig, Various Drilling and Completion Services, Tangibles and Logistics Services Details
8Supply of High Speed Diesel Details
8Carrying out Topographical Survey for 2G Ethanol Project Details
8Design and Supply of Extruder Package to Project Site Details
8Supply of Plate type Air Pre-Heaters for Reformers Details
8Diesel Hydro-Treating Catalyst including Metal Guard and Graded Beds for EURO-VI HSD Production Details
8Supply of Perchloroethylene, Catalyst Grade for Isomerization and CCR Unit Details
8Supply of Steel Drums required for Catalyst Loading of CHT and DHDT shutdown Details
8Procurement of Multi Gas Detectors with buy back of Existing Detectors along with AMC Details
8Supply of Tubings with attachments Details
8Transportation of Bulk POL products MS HSD and Branded fuels by Road ex Siliguri Malda Details
8Transportation of Bulk POL products MS HSD and Branded fuels by Road ex Bakania RIL Details
8Carrying out Civil Works at Gandhinagar LPG Plant Details
8Transportation of Bulk POL products MS HSD and Branded fuels by Road ex Siliguri Details
8Hiring Services for Microseismic Hydraulic fracture Mapping in 12 Wells of Western Onshore Area Details
You can also click on Tenders for more 
For reference purposes the website carries here the following Newsclips:
8EPCA heeds CPCB’s word, says more restrictions from November 1 to 10 Details
8India’s natural gas production fell 1.43% in September Details
8Petrol and diesel prices continue to tumble for 11th straight day Details
8Saudi's SABIC Q3 net profit up 5.4 per cent on higher selling price Details
8Italy's Eni sees profits triple on higher oil prices Details
8Trump says all US sanctions against Iran will be back in full force on Nov 5 Details
8India expects to double gas production by 2022: Officials Details
8Petrol, diesel prices likely to ease further Details
8Fuel prices witness further downward trend Details
8GST relief for oil companies on outsourced work Details
8Mukesh Ambani richer than all the richest Gujaratis Details
8Russian energy minister Novak: No need to freeze or cut oil output levels Details
8ADNOC to fill up Mangalore oil reserves in Nov: Indian officials Details
8INFOGRAPHIC: Brent climbing, but will global oil majors boost spending? Details
8Scientists develop reusable wood sponge that can clean up oil spills Details
8Why Reliance Industries needs to be viewed as a tech and consumer player Details
8Indo-Pacific will dominate Narendra Modi-Shinzo Abe dialogue today Details
8Pollution advisory: Keep windows shut, minimise use of pvt vehicles Details
8Oil stable on small market bounce, but investors eye trade outlook Details
8Soaring fuel prices pull down Mumbai’s car registrations by 20% Details
8Oil regulator approves sale of Mukesh Ambani's pipeline to Brookfield Details
8UIDAI asks banks to use Aadhaar eKYC for DBT users; offline Aadhaar for others Details
8Iran sells oil on exchange in bid to counter sanctions Details
8Petrol falls below Rs 80 in Delhi after 12 days of price cut Details
Y
ou can also click on Newsclips for more Details
Project Name: Greenfield Super Thermal Power Project
8Project Cost: 13200 crores
8Project Description: Owner along with BTG and ESP contractor is carrying out the mechanical completion activities in the 1320 MW greenfield super-critical thermal power plant. The project is getting affected due to slow progress works of the civil contractor, Bridge & Roof Company Limited. Meanwhile, ISGEC Heavy Engineering Ltd has been selected as an EPC contractor for FGD. Further bids are expected soon.
8Project Event: RFQ for the piling and pedestal works for the FGD system is expected by November 2018.
8Expenditure Approval: Q1:2013
8RFQ Date: Nov/2018
8Release Date: Nov/2018
8Start Date: Q3:2013
8Completion Date: Q3:2019
Click here for more details

8Project Name: Thermal Power Plant - FGD Addition
8Project Cost: 500 crores
8Project Description: A subsidiary power company is expected to extend the submission date for qualification documents for installation of a wet scrubber based (Limestone/Ammonia) FGD System in the 1320 MW Super Thermal Power complex in order to comply with the new environmental norms. Further bids are expected soon.
8Project Event: RFQ for re-opening for EPC package of FGD system is expected to start by November 2018.
RFQ for the information of the shortlisted applicants is expected by the end of November 2018.
RFQ for the request for proposal bid is expected by December 2018.
8Expenditure Approval: Q2:2017
8RFQ Date: Nov/2018
8Release Date: Nov/2018
8Start Date: Q2:2019
8Completion Date: Q4:2021
Click here for more details
(You will be able to access the links here, only if you have a password to our sister site, www.energylineindia.com) Details
Owner plans to come with an electrical maintenance contract for the CHP in a 500 MW thermal unit.
8Click on details for key contacts Details
For reference purposes the website carries here the following tenders:
8Job Contract for Environment Management Services at CWS & SMP Details
8Rate contract for procurement of LNB & BUC of C-Band of Nomadic Rigs and Fixed installations Details
8Hiring of consultant for Vetting of Cost Estimation Methodology for Offshore Projects Details
8Providing Engineering and Project Management Consultancy Services Details
8Procurement of pressure transmitters and temperature transmitters Details
8Part automation at Cochin AFS and TLF automation Details
8Rate Contract for Insulation Jobs in Refinery Area Details
8Construction of Mounded Storage Vessels at Rayagada LPG Plant Details
8Mechanical Piping Works and Equipment Erection at LPG Plant Details
8Phased array ultrasonic testing of quench nozzles of hydrocracker reactor Details
8Hiring of O&M services to ensure emergency preparedness on round the Clock Basis at Off-Shore Platform Details
8Corrigendum: Engaging Technical Consultants With Engineering Services Agreement Details
You can also click on Tenders for more 
For reference purposes the website carries here the following Newsclips:
8India’s crude oil production declines 4.19%, pushes import dependence to 83.7% in Sept Details
8Odisha govt clears Hindalco's Rs 5,000 crore investment proposal Details
8Deals signed at Saudi conference worth $56 billion - Energy Minister Details
8Canadian Husky Energy reports bigger third-quarter profit Details
8Bharat Stage VI norms: Know how they will impact you Details
8Rosneft's Sechin comfortable with oil price, says no one wants a spike Details
8Explained: Changing from Bharat Stage (BS)-IV to BS-VI Details
8ReNew Power and CII partner to jointly address stubble burning issue in Punjab Details
8Vietnam's VinFast in deal with PV Oil for electric car charging stations Details
8BP expects to start exploration in Libya with Eni in Q1 Details
8Fiscal deficit widens in first half of FY19 to 95.3 per cent Details
8Petrol prices drop in Mumbai by Rs 1.70, diesel by nearly a rupee in a week Details
8Oil prices fall as focus switches to oversupply Details
8Oregon governor joins other states in offshore drilling ban Details
8Government to rank oil and gas fields to boost output, promote Competition Details
8From Nov 1, Delhi air to get worse as impact of stubble burning kicks in Details
8Long way to go for India to fulfil renewable energy targets: Expert Details

Y
ou can also click on Newsclips for more Details
DAP/NPK- Phosphoric Acid & Sulphuric Acid Greenfield Project   
8Cost - Rs 2000 Crore
8Project Event: The project is in the initial phase and RFQ for the EPC contractor is likely to be released in February 2019.
Click here for more details
Ammonia-Urea Energy Saving Project
8Cost - Rs 481 Crore
8Project Event: The basic engineering is ongoing, the purchase of a long lead item is ongoing. The project is waiting for the environmental clearance and it is likely to be elicited in January 2019.
Click here for more details (You can access these links only if you have a password for our site, www.indianfertilizer.com)
Details
Mercator Petroleum limited (PML) has commenced oil production and dispatch from its 1st well, Jyoti-1 for the development of its oil and gas field in Cambay Basin in CB-ONN-2005/9 block.
8The production from the Jyoti -2 well is expected to start by November 2018.
Click here for more details  (This link is going to carry you to our project monitoring software where more details are available. After you login using your password, allow for some time for the page to load. Once inside the software, please go to our dashboard section, where we have mapped all oil & gas projects either planned or ongoing in the country. You will find a treasure house of information and key contacts inside, assembled in a manner never done before by anyone)  Details
8Well placed ONGC sources said that LOI for the FPSO for the KG-DWN-98/e turret moored FPSO is not likely to be issued this year
Click here for more details  (This link is going to carry you to our project monitoring software where more details are available. After you login using your password, allow for some time for the page to load. Once inside the software, please go to our dashboard section, where we have mapped all oil & gas projects either planned or ongoing in the country. You will find a treasure house of information and key contacts inside, assembled in a manner never done before by anyone)  Details
Oil and Natural Gas Corporation Limited's Third Party inspection services tender for the Central Processing Platform, Onshore MEG Plant and the Topside of Floating Production 8Storage and Offloading unit of the KG-DWN-98/2 Cluster 2 Project has attracted one more bidder, besides the already shortlisted 5 contenders.
8When will a tender be issued?
Click on Details for more Details
 1 2 3 >  Last ›

Showing 1–50 of 316 items