Get the latest on OIL's exploration drilling in Andamans
8When is the rig going to be deployed
8When is drilling going to start?
8A lot of services will are to accompany this activity
Click on Details for more Details
For reference purposes the website carries here the following tenders:
8Tender for upgradation work for PLC based tank farm management system TFMS Details
8Supply of hydrant/landing valve for CDW and PP units Details
8Tender for road transportation of bulk petroleum products by bottom loading tank Details
8Tender for servicing and overhauling of ABB make air circuit breakers Details
8Procurement of control valve and actuators Details
8Tender for combined station works of mechanical, civil, electrical and instrumentation works and other facilities,mainline line works Details
8Procurement of eagleburgmann make expansion joint spares Details
8Supply installation erection testing commissioning of high mast tower pole lights cabling and allied works Details
8Procurement of rotex make product classifier/ separator spares Details
8Annual rate contract for upkeep and maintenance of fire fighting facilities Details
8Procurement of nicolini make spares Details
8Tender for optimization of booster pump facilities Details
8Tender for support services for UT girth weld inspection of CBRTPL Details
8Design, Detailed Engineering, Erection, Installation and Commissioning of vapour extraction system Details
8Tender for civil and electrical work Details
8Appointment of legal advisor for new CBG plant Details
8Rate contract for the period of two years for renewal of software license (Barracuda) for advance threat protection (ATP) for emails. Details
8Tender for procurement of QRC (Couple and Stem) SS fittings for CNG and CGD Network Details
8ARC for procurement of proprietary spares of DRS and MRS Details
8Hiring of consultants milestone/deliverable based Details
8Design, Supply, Installation, Testing & commissioning of solar photovoltaic power plant 15 KWP Details
8Hiring of agency for ISO certification service information security management system Details
8Supply of ball valves Details
8Supply of nickel cadmium battery bank, SMF VRLA battery bank Details
8Procurement and installation of PA GA system Details
8Supply of electrical testing equipment Details
8Tender for facility management service Details
8Hiring of agency for safety services along with manpower Details
8Supply of bactericide non aldehyde non amine type Details
8Tender for refilling and supply of 2.5% (50% LEL) methane balance air calibration gas mixture Details
8Supply, installation, commissioning and replacement of NI-CD battery banks for TG-1 and BC-1B battery banks Details
8Hiring of TPI agency for job of painting works Details
8Design, Engineering, Supply of DLA storage & handling system in HCU Details
8Hiring of Manpower for Integrated Tank Farm management and Mechanical Maintenance and Periodic Maintenance Work Details
8Procurement of Rotameter Details
8Procurement of Breath Alcohol Analyzers (Q3) Details
8Tender for filter element Details
8Tender for HAZOP study Details
8Procurement of DCLF spares Details
8Comprehensive Annual Maintenance Contract CAMC for AUMA make Motor Operated Valves MOVs Details
8Supply of kishor pump spares Details
8Tender for Electrical Works for TFMS Details
8Supply, Installation, Testing & Commissioning of 6.6 KV GIS Details
8Tender for WZ AKOLA ID OLTD and winding repair Details
8Hiring of design & engineering consultant (DEC) for the LSTK works Details
8SITC OF 6.6 KV GIS Details
8Tender for empanelment of advertising agencies Details
8Supply of fire hose accessories for CDW and PP units Details
8Supply of mass flow meter (Coriolis) Details
8EOI for transportation of Indane LPG cylinders in vertical position on unit rate basis Details
8Tender for Replacement of 1 MW solar capacity modules along with necessary cabling and connectors and integration with the existing system Details
8Tender for engaging DGR sponsored security agency for providing security and allied services Details
You can also click on Tenders for more
For reference purposes the website carries here the following Newsclips (These are public domain newsclips and the website is not responsible for their content):
8Oil inches up after surprise drop in US crude stockpiles Details
8Crude oil prices stay near 2-week low on weak demand growth forecast Details
8High-Quality Development: From oil to hydrogen: How a Beijing refinery pioneers green energy Details
8Saudi Aramco shifts focus: Cancels Gulf coast petrochemical project, eyes Asia for growth Details
8India Establishes Secretariat for Global Biofuels Alliance Details
8Biogas Start-Up Sistema.Bio Raises USD 15 Mn For Global Expansion Details
8Punjab Aims to Meet 20% Fuel Demand Through BioFuels by 2035: Aman Arora Details
8Ethanol blending in petrol reaches 15.90 per cent in September Details
8Shift toward EVs, particularly in China, could disrupt global oil market, energy report says Details
8Panel Discussion on Global Energy Dynamics and Strategies for India’s Energy Independence by 2047 Details
8Coal India Goes Digital with Online Fuel Supply Pacts Details
8Green hydrogen, scrap steel key to decarbonizing India’s steel sector: Neha Verma, Director, Ministry of Steel Details
8EEX, IGX partner to boost hydrogen trading in India Details
8Oil steadies after fall as Middle East uncertainty persists Details
8India studying Rs.2 billion incentive plan for greener boats Details
8Global energy system faces rising risks amid geopolitical strains: IEA Details
8GAIL India's 1st CBG Plant in Jharkhand; All you need to know Details
8GRAP in force, but only 10% Faridabad units adopt clean fuels Details 
8India's HPCL in advanced talks to sign first long-term LNG deal Details
8Rapido, TotalEnergies Partner For Auto LPG In Hyderabad Details
8CPCL’s new desalination plant to boost refinery in Tamil Nadu Details
8US approval for OVL lead operatorship request in Venezuelan oil projects expected after Nov election: Sources Details
8India seeks Petrobras partnership for offshore oil exploration Details
8UAE oil exports to India rise, squeezing out GCC neighbours Details
8India's Russian oil imports rise 11.7% in September, data shows Details
8Servotech inks distribution agreement with UK-based Ensmart Power to expand EV charger business in UK and beyond Details
8Geopolitical tensions are laying bare fragilities in the global energy system: IEA Details
8PIL names its first two 14,000 TEU LNG dual-fuel container vessels Details
8Temperatures rise in Indian Gas Sector Details
8
Mozambique’s Presidential Elections and Implications for India’s Energy Security Details
You can also click on Newsclips for more Details
Who is going to be the boss at IOCL?
8Is the jury still out?
Click on Details for more Details
LNG prices will be very tight, it seems, in the months ahead
8Before they start to ease
Get a comprehensive details here   Details
A $1 billion carbon credit deal in India has raised eyebrows
8And this is a deal struck by a small entrepreneur
8This website believes that intrepid entrepreneurs can get in quickly into these deals
Click on Details for more  Details
Here is a first mover
8And it will establish a monopoly it seems Details
New Page 1 8Naresh Nayyar back at the board level [Essar] Details
8EEX, IGX and GIZ to jointly develop hydrogen trading market in India [IGX] Details
8Commencement of Operations of Rig [Jindal Drilling] Details
8Praj Leads the Way in Bioplastics with Polylactic Acid (PLA): Unveils India’s First Demonstration Facility for Biopolymers in Pune [Praj] Details
8Board Meeting Intimation for Approval of Q2 and H1 FY2024 Financial Results and Post-Results Investor Call [ATGL] Details
8Notice of Board meeting to consider Unaudited Financial Results [BPCL] Details
8Board Meeting Intimation for to consider and approve the financial results of the company [CPCL] Details
8Schedule of Analystsl Institutional Investors Meet/Conference [HPCL] Details
Details
Must give credit where it goes
8This research facility has been churning one product after another
Here is bio-polymers now   Details
This company's green energy plans have to be taken very seriously indeed
For it wants to build big plants in
8Green ammonia.
8Green urea.
8Green methanol
Raising funds does not seem to be a problem at all.
Find out more Details
Adani is quietly working on its 2 MMTPA PVC plant at Mundra
8The cost of the first phase of 1 MMTPA of PVC and associated products, is pegged at a whopping Rs 26,401.31 crore
8Rs 10,327.77 crores for the main plant (including calcium carbide and lime, caustic soda, acetylene unit, vinyl chloride monomer unit, and the PVC unit).
8Rs 2,933.98 crores for off-site facilities, including a desalination plant.
8Rs 4,574.70 crores for civil structuring and buildings, among other costs.
8Get further cost breakdown here, as also the cost-economics of it all
8When is the first phase to be completed?
Click on Details for more Details
India is a big CO2 emitter
8And regulation on Carbon Capture and Storage is still in its infancy
8What is being done so far on the regulation front?
8And what are the possible business models that India can adopt?
Click on Details for more Details
8An effective day rate of of USD 86,327 is going to boost this rig company's bottom line
Click on Reports for more Details
It is easy to get month-old import data but it is difficult to solicit forthcoming shipment information in India. We go through a laborious process of data collection to get you full import information, including company-wise, quantity-wise, port-wise, vessel-wise cargoes which are coming into India in the next 15-to30 days.
Get the daily updates for :
8LNG
8Crude
8Chemicals
8Fertilizers
8Coal and Coke
8LPG
8Ammonia
8All tankers
8Bulk and Dry cargo
8Port Update
Click on Reports for more. Details
There are dozens of start-ups that are involved in clean-tech
8These startups use a variety of cutting-edge technologies such as AI, IoT, biomethanation, and clean tech innovations to address key sustainability challenges.
8Many of these startups have secured significant investments from well-known global players like Goldman Sachs, Sequoia, Warburg Pincus, and Tata Cleantech Capital, showing confidence in India’s cleantech ecosystem.
Get a whole lot of data on them here Details
Kandla-Gorakhpur LPG Pipeline (KGPL) spans a total length of 2,800 kilometers, making it one of the longest LPG pipelines in the country.
8It is designed to carry liquefied petroleum gas (LPG) from the Kandla Port in Gujarat to several bottling plants and terminals in the northern regions of India, particularly in Uttar Pradesh.
8When is the pipeline going to be completed? Details
There are as many as 39 different units in this complex refinery
8For those in the downstream sector, it is important to keep track of these units
8In terms of technology supplier, capacity, and what can be ahead with them in terms of maintenance and operations.
Click on Details for more Details
Bio-diesel plants are usually small investment projects
8But this refiner is planning a big one, it seems.
8There will be a PMC and an LSTK contractor
Click on Details  Details
8Project Name: Udhamsingh Nagar District City Gas Distribution
8Project Cost: Rs 300 crore Click here for more details Details
8Project Name: Sheikhpur, Jamui and Deoghar District City Gas Distribution
8Project Cost: Rs 350 crore Click here for more details Details
Sulphuric Acid Greenfield Project
8Cost: Rs. 200 Cr.
8Project Event: The construction is ongoing, and all long-lead items have arrived at the site. The project is expected to be commissioned by the end of 2025.
DAP Expansion Project
8Cost: Rs. 649 Cr.
8Project Event: The project is likely to receive environmental clearance in January 2025, and the RFQ for the LSTK contractor is expected to be released by the end of Q1 2025. Details
8Is it political compulsion that has taken ONGC all the way to a distant place, 375 km inland from Mumbai?
Click on Details for more Details
ONGC's procurement revamp, the brainchild of its CEO, Arun Kumar Singh, seems to be earning it cudos
8A similar applause has not come in yet from vendors yet
Click on Details for more  Details
8Here's what's happening today in the E&P, midstream-downstream, and CGD section
Click on Reports for more Details
Details
New Page 1 8Additional Session in Continuous & Auction Market [IGX]] Details
8Launch of Intraday Contracts [IGX]] Details
8EPGL celebrates double victory at the 2nd National Power-Gen Leadership Awards 2024 [Essar] Details 
8Shri Amit Kumar Selected as Chairman & Managing Director of AI Assets Holding Limited by PESB Details
8Order: In the matter of Unauthorized laying of spur pipeline of MBPL from Rohtak to Panipat by GIGL without seeking requisite permissions from the Board [PNGRB] Details
8PNGRB invites applications for engagement of Individual Consultant Engineering (Level-III) on contract basis [PNGRB] Details
8Audio / video recording and transcript of the presentation [RIL] Details
8Notice of Offer for Sale of Shares by Promoter & Floor Price [CSL] Details
8Change in Board of Directors of the Company [EIL] Details
8Sealmatic India Limited Partners With Saudi Thalate General Manufacturing Industrial Co Ltd (STG) In Saudi Arabia [SIL] Details
8Investment in ONGC Petro additions Limited (OPaL)[ONGC] Details
Details
8Fined for disobedience, this oil & gas entity was told to fall in line
Click on Details for more Details
The gas market is getting smoother
8In daily transactions, the trader offers to book capacity
8And deliver the gas
Click on Details for more Details
RIL's oil to chemical segment seems facing headwinds, with low margins
8And the future does not seem very bright either from how the company has projected
8But RIL has massive advantage in oil to chemicals over its domeestic rivals
8If RIL is having a challenging time, wonder how other Indian petrohemical plants would survive
8Get to know what RIL has which others do not
Click on Details for more Details
What is the latest on the coal gasification plans of the JV between GAIL and CIL?
8Is it making any headway?
Click on Details for more. Details
3D modeling of oil & gas production facilities does not seem enough for ONGC.
8This is because the models are not updated when additional facilities are built or structures are modified
8Now they are looking at something more
8But will that suffice? Details
8Project Name: Khagaria, Saharsa and Madhepura District City Gas Distribution
8Project Cost: Rs 350 crore Click here for more details Details
ONGC's EOI for small-scale modular LNG terminals for stranded gas is only a first take
8A lot of iteration is likely before a tender comes out
8A motley group of companies have shown interest and most of them are not keen on the one business model that ONGC seems to be interested in.
The main players do not seem to be in the picture for now Details
8Project Name: Lakhisarai, Munger and Bhagalpur District City Gas Distribution
8Project Cost: Rs 300 crore Click here for more details Details
It is easy to get month-old import data but it is difficult to solicit forthcoming shipment information in India. We go through a laborious process of data collection to get you full import information, including company-wise, quantity-wise, port-wise, vessel-wise cargoes which are coming into India in the next 15-to30 days.
Get the daily updates for :
8LNG
8Crude
8Chemicals
8Fertilizers
8Coal and Coke
8LPG
8Ammonia
8All tankers
8Bulk and Dry cargo
8Port Update
Click on Reports for more. Details
For reference purposes the website carries here the following tenders:
8Supply of white oil Details
8Tender for permanent cathodic protection works for U/G steel pipeline network Details
8Tender for PDH PP plant with ethane and propane handling facilities Details
8Supply of spring support assemblies Details
8Supply of fire alarm system (FAS) Details
8Supply and installation of 07 Nos. lockout relays Details
8Procurement of work assistance in mechanical maintenance jobs Details
8Supply, Installation and commissioning of chemical injection skids Details
8Rate contract for procurement of alcohol resistant aqueous film forming foam (AR-AFFF) Details
8Procurement of valve spares Details
8Supply, Installation, Testing and commissioning of CCTV cameras Details
8Tender for refurbishment of die plate of extruder Details
8ARC for laying of 3LPE coated carbon 4inch steel pipeline in gas under Patna cluster and other associated work Details
8Supply of kay make oxygen enrich gas blower spares Details
8Supply of fasteners Details
8Procurement and line-up of non-comprehensive annual maintenance contract for M/S schneider electric System India Pvt Ltd make PLC Details
8Supply, Installation, testing and commissioning of videowall and process data archival software Details
8Procurement of nikkiso make metering pump spares Details
8Procurement of flowserve sanmar make mechanical seal spares Details
8Annual Maintenance Contract for operation and maintenance of electrical system Details
8Supply, laying and termination of control cable for filling shed DU motor and page phone cable Details
8Supply of valve check cast Details
8Tender for steam condensate process lines insulation survey Details
8Tender for transportation of white oil ex elathur Details
8AMC for servicing and calibration of UTM instrument Details
8Supply of power line filter Details
8Supply installation and commissioning of equipment along with accessories Details
8Supply of perchloroethylene, catalyst grade Details
8Supply of heat exchanger tubes seamless Details
8Contact angle goniometer Details
8Supply of rheometer Details
8Supply of needle valve Details
8Hiring of service for carrying out thickness measurement survey of overground process piping Details
8Supply installation testing commissioning of battery nickel cadmium 60AH 12V Details
8Supply of 65 inch professional display along with standing Kit Details
8Supply installation and commissioning of 2X80 KVA Details
8Supply of complete Mechanical Seal Details
8Tender for hydraulic operated valve jobs for the vessel RM0807 Details
8Supply of Water Multichecker Details
8Supply of 110 KV Aluminium cable Details
8Design, Supply & Installation of Mechanical seal at Main line pumps Details
8Procurement of sleeve bearing and lybrianth seal for mainline motors Details
8Supply of AFFF (3 % Concentration) for onshore installations ( 8000 pieces ) Details
8Tender for Installation Commissioning and Testing of VFD Panel for Air Fin Cooler motor Details
8Supply of triveni gearbox spares Details
8Providing liaisening services for obtaining CTE for the twd pipelines from pollution control board Details
8Tender for transportation of bulk POL products MS HSD and branded fuels Details
8Hiring of SAP support services for business applications Details
You can also click on Tenders for more
For reference purposes the website carries here the following Newsclips (These are public domain newsclips and the website is not responsible for their content):
8ONGC Hikes Stake In Petchem Subsidiary OPaL To 94.04% For Rs 5,594.80 Crore Details
8Neither hydrogen nor gasoline, this engine of the future changes everything – it has an unprecedented mechanism that uses no fuel Details
8FPSO produces first oil at Petrobras' offshore Jubarte field Details
8Bunker One launches physical LNG bunker supply Details
8Diamondback Energy Warns of Lower Q3 Oil and Gas Prices Details
8Venture Global Delays LNG Deliveries to Italy's Edison Until 2025 Details
8What the Middle East conflict means for oil, LNG and the global economy Details
8Woodside Energy Acquires Tellurian, Renames Driftwood LNG Project Details
8South Korea dramatically increased LNG purchases Details
8LNG Producer-Consumer Conference 2024 calls for roadmap to decarbonise LNG value chain Details
8Proweps expands BioCNG facility in Sweden, enhances waste processing Details
8Playing of old announcement of gas leakage in tanker thru Details
885 million EVs expected on roads globally by 2025, India to see 5 lakh EVs Details
8Total Energies expects lower Q3 results amid outages, shrinking refining margins Details
8India and Russia discuss new initiatives for Northern Sea Route Details
8EU Energy Commissioner says EU ready to live without Russian Details
8Free LPG Gas Cylinder: Check How To Avail Benefits Under UP Ujjwala Yojana This Diwali Details
8Chevron boosts oil and gas production in New Mexico’s Permian Basin Details
8Nepal Oil Corporation hikes petrol, diesel and kerosene prices Details
8Robotics adoption increasing in oil and gas to ease HS&E concerns Details
8HPCL, BPCL, IOC soar up to 5% in trade as oil prices slip to 2- week low Details
8Russia eyes India’s coal and oil market amid Europe’s shift to renewable energy Details
8Oil prices plunge on demand worries Details
8Don’t expect sharply higher crude prices any time soon: Geoff Dennis Details
8Iran Gas Institute to hold a conference on new technologies in oil industry next week Details
8India clears 1 million sq km cleared for oil exploration in ‘no-go’ area Details
8Department of Shipping Urges Stakeholders to Comply with Sanctioned Ship and Cargo Regulations Details
8Surprise inspection of Barauni-Kanpur pipeline Details
8Indian Bond Market dilemma with inflation and oil price shift Details
8China’s Peak Oil Demand Looms: Challenges and Perspectives Details
8India Diversifies Its Crude Oil Imports with Brazil Details
You can also click on Newsclips for more
Details
Sulphuric Acid/DAP/NPK/Ammonium Sulphate Expansion Project
8Cost: Rs. 550 Cr.
8Project Event: The internal discussion is ongoing, and the RFQ for the LSTK contractor is likely to be released in April 2025, The project has already elicited environmental clearance.
New NPK Train Greenfield Project
8Cost: Rs. 56 Cr.
8Project Event: The project is currently in its early stages, with plans to hire a feasibility consultant by Q1 2025. Details
Signals emanating from the Ambani Group hide something deep and dark with far reaching implications
8The companies that are going to be hurt most are GAIL, PLL, IOCL and NRL
Click on Details for more. Details
8Apave Tiv India Pvt Ltd
8Omci Rig Technical & Support Services Pvt Ltd
8VCS Quality Services Pvt Ltd
One of them made the grade
Click on Details for more Details
GAIL is now a hydrocarbon producer in this block
8Working as an operator
Click on Details for more  Details
Why are 2G ethanol project piggybacking on supplementary projects?
8Here is an update
Click on Details for more Details
A desi technology has been optimized for CO2 capture
8Usually, such advances fail to catch popular imagination
8Will it be different this time around?
Click on Details for more Details
Why is China now a cause of headache for the Indian oil & gas industry?
8And it is going to the domestic industry hard.
8And there seems to be no immediate solution to this
Click on Details Details
8Project Name: Bhubaneswar-Khordha District City Gas Distribution
8Project Cost: Rs 350 crore Click here for more details Details
This E&P block has got a huge uplift after it was acquired
8Those in the E&P business can now look for business opportunities here
Click on Details for more  Details
8Project Name: Ranchi District City Gas Distribution
8Project Cost: Rs 350 crore Click here for more details Details
Why is the relationship between BP and RIL always been in favour of the latter
8Even now, the relationship is one sided, with RIL laughing all the way to the bank
Click on Details for more Details
For reference purposes the website carries here the following tenders:
8Tender for solar plant restoration jobs Details
8Tender for electrical m and r works Details
8Tender for transportation of bulk POL products MS HSD and branded fuels Details
8Tender for electrical installation and allied works Details 
8ARC for Operation and Maintenance of Pet Coke Handling System Details
8ARC for insulation jobs Details
8Supply of molten phenol in tankers Details 
8RFP-Technical-Resilient Data center Services (Containerized DC ) Details
8Design, detailed engineering, procurement, inspection, transportation, supply, fabrication, assembly, installation, testing and commissioning of electrical, instrumentation and automation system Details
8Provision of cabling work for commissioning of TAS equipment for Bio diesel tanks Details
8Procurement of KSB pumps Details
8Tender for security and allied services Details
8Procurement of baumann emerson make valve spares Details
8Development of new A site RO Details
8Procurement of spare kit for shutdown valve Details
8Procurement of kirloskar pneumatic spares Details 
8Supply/Services requirement of SOURCING OF “DR on Cloud” – Including SAP and Non- Environment Details
8SITC of master control station and retrofitted MOV actuators Details
8AMC for radar gauges Details
8Design, Engineering, Supply, Installation, testing and commissioning of equipment for automated statutory testing and painting facility of LPG cylinders Details
8Expression of Interest for setting up small-scale LNG plants Details
8Procurement and installation of racks of long span shelving for storing spares, tools and tackles for safe storage of items Details
8Hiring services for the overhauling of 6.6KV motors Details
8Supply of line pipes Details
8Hiring of gully sucker for removal cleaning of oil oily muck sludge Details
8Tender for repair of feeder pillars Details
8Procurement of work assistance in mechanical maintenance jobs Details
8Procurement of critical spares for compressor of NUOVO pignone make Details
8Procurement of electrical measuring and testing equipments Details
8Annual maintenance contract for diesel Details
8Procurement of spares for installed IL make control valve Details
8Procurement and installation of racks of long span shelving for storing spares Details
8Supply of HRSG bottom duct WPH economiser evaporator super heater water Details
8Supply of current to pneumatic converter Details
8Tender for testing and analysis of transformer oil Details
8Supply of liquid chlorine gas in baby cylinder Details
8Supply installation testing commissioning of battery nickel cadmium 60AH 12V KFL Details
8Supply of EHT summation meter Details
8Implementation of Laboratory Information Management System LIMS Details
8Procurement of 128 nos 2” EFCV for Unloading Liquid & vapour LPG Line Details
8Repair maintenance of mechanical job in zone NR8 tank farm Details
8Supply of LED Display System (Q2) Details
8Tender for fitness for service and remaining life assessment study Details
8Tender for reconditioning of WGC2 compressor rotor Details
8E- Tender for procurement of multi Gas detector Details
8Third Party Inspection for PEB works of Process Block Shed and associated facilities Details
8Supply of air filter regulator Details
8Supply of TFMS gauges Details
8Tender for Job of survey of pipeline transfers of lube oil Details
8Supply of Breath Alcohol Analyzers Details
8Providing Manpower to carry out Day to Day work Details
8Procurement of frame V gas turbine spares Details
You can also click on Tenders for more
For reference purposes the website carries here the following Newsclips (These are public domain newsclips and the website is not responsible for their content):
8The clean hydrogen struggle: Can it dethrone gray H2 price Details
8MRPL Board announces extension period of M.S Kamath as Director (Finance) Details
8Delhi's air quality turns 'poor' after Dussehra, likely to improve Details
8Average airfares around Diwali drop 20- 25 pc on many routes Details
8Gujarat's minor ports driving local industry and efficiency Details
8LNG Producer-Consumer Conference 2024 calls for roadmap to decarbonise LNG value chain Details
8India well poised to achieve 20 per cent ethanol blending target before deadline: Hardeep Puri Details
8PPP to boost India’s green hydrogen plan Details
8India Saves Rs 1.06 Lakh Cr on Biofuel Blending: Puri Details
8Fraudsters Dupe Ujjwala Beneficiaries In Odisha’s Balasore Details
8Can TAPI Pipeline Help Afghanistan Boost Private Sector And Attract Investment price – OpEd Details
8Will explore electric vehicle export opportunities: Hyundai Motor India Details
8Santos Secures Rs.800M Loan for Darwin LNG Life Extension Ops Details
8'Yatra Fuels' helps KSRTC save Rs 215 crore in two years Details
8Oil tanker catches fire in Thane city; none injured Details
8India cuts oil supplies from Russia Details
8India's Reliance Profits Drop On Weak Oil-to-chemicals Arm Details
8India Achieves Rs 1.06 Lakh Crore Foreign Exchange Savings Through Enhanced Biofuel Blending Details
8Chennai Petroleum to raise Rs.3.3bn for new oil refinery in India Details
8Indian Oil to form JV with EverEnviro Resource Management Details
8India saved Rs 1.06 lakh crore in foreign exchange from biofuel blending: Puri Details
8Agiba Petroleum Company Investments Reach Rs.417 M in FY 2023/24 Details
8OPEC cuts global oil demand growth forecasts for 3rd consecutive month Details
8Norway court rejects environmental injunction against oil and gas fields Details
8KBR Awarded Engineering and Procurement Services Contract for Manatee Project Details
8PPL begins oil & gas production from Punjab Details
8Hiroshima Gas builds two LPG tanks for lean LNG Details
You can also click on Newsclips for more
Details
8Here's what's happening today in the E&P, midstream-downstream, and CGD section
Click on Reports for more Details
Details
It is easy to get month-old import data but it is difficult to solicit forthcoming shipment information in India. We go through a laborious process of data collection to get you full import information, including company-wise, quantity-wise, port-wise, vessel-wise cargoes which are coming into India in the next 15-to30 days.
Get the daily updates for :
8LNG
8Crude
8Chemicals
8Fertilizers
8Coal and Coke
8LPG
8Ammonia
8All tankers
8Bulk and Dry cargo
8Port Update
Click on Reports for more. Details
Coal to Ammonium Nitrate Greenfield Project
8Cost: Rs. 11782 Cr.
8Project Event: Due to a lack of suitable bidders, the bid due date for the RFQ for the LSTK contractor for the Syngas Purification Plant has been extended from October 24 to December 20, 2024.
Nano Urea Greenfield Project
8Cost: Rs. 220 Cr.
8Project Event: S3M Design Consultants LLP has been finalized for the Project Management Consultant with a price bid of INR 4 Crore. The company has already signed a license agreement with Ray Nano Science & Research Centre LLP to produce Nano Urea. Details
8A quick look at today's developments in E&P and midstream-downstream, and CGD section
Click on Reports for more
Details