All content in this website is sourced legitimately

Archives


All the news items since the launch of our web site are preserved in the archive section. The archive entries are freely accessible to all the users.


Sep 2022

We have updates on the following mid-stream projects:
8Asanur Greenfield POL Terminal Project
8Grassroot POL Terminal Vallur (IOCL)
8Koyali-Ahmednagar-Solapur Product Pipeline Expansion Project
Click on Details for more
Details
8Project Name: Surat-Bharuch-Ankleshwar Districts City Gas Distribution
8Project Cost: Rs 300 crore.
Click here for more details.
Details
8Project Name: Navsari  District City Gas Distribution
8Project Cost: Rs 350 crore.
Click here for more details.
Details
Nano Urea Green field Project
8Cost: 257 Cr.
8Project Event:  The viability of the project is being assessed by preparing a Techno-economic feasibility report (TEFR) through a consultant. It requires environmental clearance from MoEF & CC and the company is in the process of getting the same. In parallel, project Management Consultant is also being lined up
NP (20:20:0:13) Fertilizer Expansion Project
8Cost: 220 Cr.
8Project Event: 30% of the construction has been completed. The erection work for long lead item is still ongoing. Installation is likely to be started in November 2022. The project is likely to be commissioned in December 2023. The company has hired Nuberg for the supply of Design Detailed Engg, Procurement, Supply, Erection, and Commissioning Details
EIL CMD Vartika Shukla did manage to push down the price of the EPC-02 project for the proposed Mongolia refinery
8Find out what the prices were for those who put in their bids
Click on Details for more Details
Rs 310 crore Construction of 400 kV DC T/L: S/S works package in October 2022
8Private land acquisition has been completed for the erection of the tower.
8The application for forest clearance stage-2 is pending at the regional office.
8PMC has been selected.
8Erection and installation works are about to start for P/S works.
8RFQ for the 132/33 kV S/S works package is likely to be floated in October 2022.
Rs 720 crore greenfield hydroelectric power project: EM works package in November 2022
8FC stage 1 and stage 2 have been approved by MoEF.
8Civ Mobilization of equipment is about to start by the civil works contractors.
8Major civil works contractors have shown interest in pre-bid meetings for HM works. Technical bids are yet to be started.
8RFQ for the EM works package is likely to be floated in November 2022.
Rs 18700 crore greenfield thermal power project : Unit transformer package in Q4 2022
8New sub-contractor has been selected for the ACC works.
8AHP contract has been terminated by the EPC and re-tendering is in progress.
8EPC has been selected for the power evacuation system.
8Sub-contractor has been selected for the Stacker reclaimer works.
8RFQ for the Unit transformer package is likely to be floated in Q4 2022.
Get in touch with us for more on these projects
Details
Get the daily updates for
8LNG
8Chemicals
8Fertilizers
8Coal-Coke
8LPG
8Ammonia
8All tankers
8Bulk and Dry cargo
8Port Update
Click on Reports for more Details
8Details of Loss of Certificate / Duplicate Certificate [MRPL] Details
8Order: In the Matter of Central U.P. Gas Limited Vs. Hindustan Petroleum Corporation Limited [PNGRB] Details
8Order: In the Matter of Review Petetion No/19/2022 of M/s GAIL (India) Limited [PNGRB] Details
8Order: In the Matter of Gujarat State Petronet Limited Vs. Essar Steel (India) Limited (Now Arcelormittal Nippon Steel India Limited) & Anr. [PNGRB] Details
8Order: In the Matter of CL India Limited Vs. Gujarat State Petronet Limited [PNGRB] Details
8Order: In the Matter of Essar Power Limited Vs. Gujarat State Petronet Limited [PNGRB] Details
8Order: In the Matter of Reliance Infrastructure Limited Vs. GAIL (India) Limited [PNGRB] Details
8Order: In the Matter of Tata Power Delhi Distribution Liimited Vs. GAIL (India) Limited [PNGRB] Details
8Order: In the Matter of GVK Industries Power Limited Vs. GAIL (India) Limited [PNGRB] Details
8Order: In the Matter of GVK Gautami Power Limited Vs. GAIL (India) Limited [PNGRB] Details
8Order: In the Matter of Konaseema Gas Limited Vs. GAIL (India) Limited [PNGRB] Details
8Order: In the Matter of Lanco Kondapali Power Limited Vs. GAIL (India) Limited [PNGRB] Details
8Order: In the Matter of GMR Energy Ltd. Vs. GAIL (India) Limited [PNGRB] Details
8Order: In the Matter of GMR Veemagiri Power Generation Limited Vs. GAIL (India) Limited [PNGRB] Details
8Prior intimation to the beginning of the quarter [WELSPUNIND] Details
8Shareholder Meeting / Postal Ballot-Scrutinizer''s Report [ALPHAGEO] Details
8Shareholder Meeting / Postal Ballot-Outcome of AGM [ALPHAGEO] Details
8Shareholder Meeting / Postal Ballot-Scrutinizer''s Report [JD] Details
8Confidence Petropleum Annual Report [CP] Details
8Shareholder Meeting / Postal Ballot-Scrutinizer''s Report [SGL] Details
8Shareholder Meeting / Postal Ballot-Scrutinizer''s Report [RGL] Details
8Credit Rating for Bank Facilities of the Company by ICRA Limited [MGL] Details
8Details of Loss of Certificate / Duplicate Certificate [RIL] Details
8Reliance New Energy Limited to invest in Caelux Corporation [RIL] Details
8Announcement under Regulation 30 (LODR)-Acquisition [RIL] Details
8Oil lndia Records Highest Ever Profitin Fy-2021-22 [OIL] Details
8Shareholder Meeting / Postal Ballot-Outcome of AGM [OIL] Details
8Oil India (USA) Inc. (Wholly Owned Subsidiary Of The Company) [OIL] Details
8Details of Loss of Certificate / Duplicate Certificate [BPCL] Details
8Announcement under Regulation 30 (LODR)-Change in Directorate [ONGC] Details
You can also click on Details for more
Details
In what was described as "really crazy", a domestic bidding frenzy saw the price of gas go up to, as a bidder said, "something I have never witnessed before".
8Find out more on what really happened, and how far did prices soar?
Click on Details for more Details
8Petronet LNG has been accused of "stealing LNG" and making super normal profits from it
 Find out more Details
8ONGC's contracts in the KG-DWN-98/2 seem to smell of messy contracting
8And the company is paying a price of it
Click on Details for more Details
8There is a non-ONGC tender for a jack-up rig coming up
Click on Details for more Details
This company, which hire drilling rigs and lends them forward, while also providing rig services, is not really in great shape
8It has faced a downgrade?
Why is that so, when the markets are looking up?
Click on Reports. Details
8Project Name: Giridih-Dhanbad Districts City Gas Distribution
8Project Cost: Rs 350 crore.
Click here for more details
Details
8Project Name: Sundargarh and Jharsuguda Districts City Gas Distribution
8Project Cost: Rs 250 crore.
Click here for more details.
Details
Get updates on what is up with these projects:
8Kharagpur Greenfield LPG Bottling Plant Project (IOCL)
8Grassroot POL Terminal Vallur (IOCL)
Click on Details for more Details
By how much is ammonia cost of production meant to come down over a period of time using hydrogen?
8How quickly can existing pipelines be used to ferry hydrogen? How much cost savings will be possible by repurposing exisitng pipelines?
8What is really interesting is that existing LNG terminal can also be repurposed for hydrogen traffic.
8And what can governments do to encourage hydrogen production?
 Click on Details for more Details
Energy Saving-cum- Ammonia-Urea Expansion Project
8Cost: 540 Cr.
8Project Event: Majority of civil work has been completed, pre-fabrication, mechanical & piping works have been completed, pre- commissioning is ongoing, The project is likely to be commissioned in October 2022.
SSP Expansion Project
8Cost: 21 Cr.
8Project Event: The project is under environmental clearance, public hearing is likely to be started in October 2022, Talking with local contractor is ongoing for the equipment and services Details
For reference purposes the website carries here the following tenders:
8Procurement of Pump Spares Details
8Tender for Level Transmitter Details
8Procurement of Reagent for Coranalyaer Machine Details
8Tender for Overhauling of Bhel make Machines Details
8Tender for Supply, Installation, testing and Commissioning of VRF/VRV System Air Conditioner Details
8Supply of Castrol Hyspin AWS 15 Details
8Tender for Fabrication Supply & Installation of 47.5 KG AND 35 KG Cylinders Chain Conveyor System Details
8Procurement of Chloride Guard Catalyst and Zinc Oxide Catalyst for Hydrogen Plant Details
8Tender for Topographical Survey Works Details
8Tender for Supply, Installation, Testing and Commissioning for Rerouting of PNG Pipeline Details
8Supply of Pour Point Depressant for Subsea Umbilical Operations for KG-DWN 98/2 Project Details
8Supply of Re Refined Base Oil Details
8Tender for kobe make Lube Oil for PSA Feed Gas Compressor Details
8Tender for OFC and Telecom Services in Pipeline Network Details
8Supply of Servo valve and SRV Power Cylinder Details
8Supply, Testing & Commissioning of LPG Loading/Unloading arms Details
8Tender for Operation and Greasing of all types of Valves and Associated Works Details
8Tender for Design, Manufacture, Supply , Installation and Commissioning of Cylinder de-Shaping Unit Details
8Tender for Remosa make RFCCU Slide Valves Spares Details
8Tender for Elliott Ebara make Old WGC Turbine and Compressor Spares Details
8Tender for Stack Gas Analyser Systems Details
8Tender for AMC for Advanced Systek Batch Controller System Details
8Tender for Carrying out Piping Works Details
8Tender for Engineering-Bitumen Export Line Details
8Supply, Erection and Commissioning of Chain Conveyor system and Equipments Details
8Tender for Transportation of Packed Lube Oils Details
8Rate Contract for Carrying out Route Survey for Laying Flow Lines Details

You can also click on Tenders for more
For reference purposes the website carries here the following Newsclips:
8LPG Price: This time bring LPG cylinder home for less than Rs 300 in festivals Details
8Russia Crude Oil: Russia became India's third largest oil supplier, not even ten countries before the war started Details
8India set to skip buying Russia's ESPO crude in September as freight costs jump Details
8Indian Oil plans Panipat refinery maintenance, to revamp naphtha cracker - sources Details
8HPCL and Hero Motocorp will jointly install electric vehicle charging stations across the country Details
8Ola Electric to foray into international markets starting with Nepal Details
8Diesel theft: Three held for attacking youths Details
8Sheetal Cool Products signs MoU with BPCL Details
8NRL to complete construction of IBFPL by end of year Details
8India plans to set up strategic gas reserve amid global energy crisis Details
8India considers laying more petro pipelines for Nepal Details
8The war in Ukraine has reshaped the world’s fuel markets Details
8Karnataka poised to lead the electric vehicle revolution: CII Details
8Domestic auction: Prices when "crazy" Details
8For smart cities, India needs smart EV charging infrastructure Details
8India working to transform its energy landscape: Minister Jitendra Singh Details
8India’s clean cooking transition: Why development financial institutions play major role Details
8Air India, Air Asia India, Vistara sign MoU for sustainable aviation fuel Details
8India and European Union discuss Free Trade Agreement, price cap on Russian oil Details
8Sanjay Choudhuri to be the next Director-Finance of NRL Details
8India to get first car that can run on 100% ethanol and electric Details
8Oil prices slip after US interest rate hike on fears for demand Details 
8Haryana: Shift to cleaner fuels by September end or face closure, 107 factories told Details 
8IGGL achieves 42.94 per cent physical progress, Rs 1556.46 crore capital expenditure Details 
8Oil rises as supply fears overtake recession worries Details 
 You can also click on Newsclips for more   Details
Rs 312 crore construction of 132 kV D/C Transmission Line: P/S works package in December 2022
8The identification of private land has been completed and the acquisition of private land is in progress.
8Forest clearance stage-1 was pending at the DFO.
8Approval from PTCC, civil aviation, and defense is in the process.
8Sev Engineering works are in progress for the 132 kV GIS S/S.
8RFQ for the P/S is likely to be floated in December 2022.
Rs 4035 crore greenfield hydroelectric project: SIA consultant in Q4 2022
8TOR has been granted by the MoEF.
8Forest clearance stage -1 is pending at the regional office and wildlife clearance is pending at the wildlife warden.
8R.S Envirolink has been selected as an EIA consultant.
8Drilling works at the site are in progress and drifting works are yet to be started.
8RFQ for the SIA consultant is likely to be floated in Q4 2022.
Rs 4700 crore greenfield hydroelectric power project: Civil works package(lot-2) in October 2022
8New agreement has been signed with the ADB for financial assistance.
8Forest clearance stage 1 and stage 2 have been approved by the DFO.
8The hydro-meteorological investigations (Discharge And Rainfall Measurement) report has been approved by CWC.
8The approach road construction was completed by the state PWD department.
8Civil works(lot-1) contractors have started the mobilization of equipment at the site.
8RFQ for the Civil works package(lot-2) is likely to be floated in October 2022.
Rs 11000 crore greenfield thermal power expansion project : Separator system package in November 2022
8Erection and installation of pressure parts of SG have been completed.
8Erection and installation of TG work are in the advanced stage for completion.
8Land acquisitions have been completed for transmission line works and fabrication works are about to start.
8RFQ for the cyclone separator system package is likely to be floated in November 2022.
Get in touch with us for more on these projects
Details
Get the daily updates for
8LNG
8Chemicals
8LPG
8Ammonia
8All tankers
8Bulk and Dry cargo
8Port Update
Click on Reports for more Details
The largest gas tender in the country -- for a massive 18 cargoes of LNG -- saw one bidder going about aggressively mopping up volumes
8Usually it is GAIL but not this time around
Click on Details for more  Details
8Details of Loss of Certificate / Duplicate Certificate [Aegis] Details
8Summary Of Proceedings Of 58Th Annual General Meeting Of The Company Held On Thursday, 22Nd September, 2022 [SGL] Details
8Announcement under Regulation 30 (LODR)-Credit Rating [GGL] Details
8Shareholder Meeting / Postal Ballot-Scrutinizer''s Report [Petronet] Details
8Shareholder Meeting / Postal Ballot-Outcome of AGM [Petronet] Details
8Details of Loss of Certificate / Duplicate Certificate [RIL] Details
8Announcement under Regulation 30 (LODR)-Analyst / Investor Meet - Intimation [Vedanta] Details
8Details of Loss of Certificate / Duplicate Certificate [Vedanta] Details
8Details of Loss of Certificate / Duplicate Certificate [HPCL] Details
8Announcement under Regulation 30 (LODR)-Analyst / Investor Meet - Outcome [HPCL] Details
8Compliance-57 (4) : Prior intimation to the beginning of the quarter [IOCL] Details
8Expansion Course: Policy changes drive growth in the sector [Essar] Details
8Monthly Production Report August 2022 [MOPNG] Details
8Addendum-6 to RFP for Tendering of Mumbai Region Crude Oil of ONGC [ONGC] Details
8Submission of agenda briefs for consideration of EPC [ONGC] Details
You can also click on Details for more
Details
8After gas sales from KG-DWN-98/2 was cancelled, ONGC is embarking on another sale of gas
Click on Reports for more Details
8This Rs 15,000 crore petrochemical project will come up through the EPCM route
Click on Details for more Details
8This LNG terminal is going to be functional this year
Find out when
   Details
Gas price changes in India are always problematic as the Kirit Parekh Committee is finding out
8What are the dynamics at work before the committee?
Click on Details for more Details
8Project Name: Ganjam, Nayagarh and Puri Districts City Gas Distribution
8Project Cost: Rs 250 crore.
Click here for more details
Details
8Project Name: West Singhbhum District City Gas Distribution
8Project Cost: Rs 200 crore.
Click here for more details.
Details
8This is an international LNG deal that could have fetched India LNG at the lowest possible prices
8But the deal fell through and while India is keen again, the other side may not be
Click on Details for more Details
Rs 325 crore Construction of 400 kV DC T/L: ACSR moose conductor works package in October 2022
8NOC from the Inland Waterway Authority of India has been granted.
8Forest clearance stage -1 and stage 2 have been granted by the DFO.
8Engineering works are in progress for the S/S works.
8Approval from civil aviation, defense, and PTCC have been granted.
8Fabrication, erection and installation works for P/S is yet to be started.
8RFQ for the ACSR moose conductor works package is likely to be floated in October 2022.
Rs 2300 crore greenfield hydroelectric power project: HM works package in November 2022
8Hydrology report has been approved by CWC.
8PPA has been signed with State Government.
8Biddings under progress for the Civil works package. Major civil works contractors have qualified for technical bids.
8RFQ for the HM works package is likely to be floated in November 2022.
Rs 11000 crore greenfield thermal power project : Limestone and gypsum handling plant package in Q4 2022
8Mechanical completion is in progress for BTG.
8Erection and installation of ESP have been completed and the PG test is about to conduct.
8Sub-contractor has been selected for the chlorine dosing system.
8Civil and structural works have been completed for the ball mill and absorber system.
8RFQ for the limestone and gypsum handling plant package is likely to be floated in Q4 2022.
Get in touch with us for more on these projects.
Details
Get the daily updates for
8LNG
8Crude
8CPP
8LPG
8All tankers
8Bulk and Dry cargo
8Port Update
Click on Reports for more Details
NPK Fertilizer Expansion Project
8Cost: 190 Cr.
8Project Event: RFQ for the LSTK contractor is likely to be released in October 2022 due to a delay in the internal discussion. The term loans from the State Bank of India and Export-Import Bank of India have been availed for financing the NPK project. The project has elicited environmental clearance in September 2019,
Ammonia-Urea Energy Saving Project
8Cost: 250 Cr.
8Project Event: The feasibility study is still ongoing, RFQ for the LSTK contractor is likely to be released in at the end of October 2022, due to delay in the internal discussion. Details
8There are some important LNG tenders going on
8Also, what is the latest update on the gas and LNG sector in India in terms of what is going on and what is ahead
8Find out more, click on Reports for more Details
8Here is a petrochemical company whose director is getting imported from some other company.
Click on Reports for more Details
8This company is setting up LNG stations in the country
8Find out how many stations are to be set up Details
The government hits back at the media like never before.
8A story is often contradicted but for this one, motive is ascribed too by the petroleum ministry.
Click on Details for more Details
The offshore vessel market may be seen increased demand but companies continue to struggle.
8Here is one desi company still trying to find its feet as losses continue to mount
Click on Reports for more Details
Carbon-neutral LNG was the flavour of the season before Russia invaded Ukraine and all hell broke loose.
8Even so, here is a full list of carbon-neutral LNG shipped so far
8Also, once the crisis settles, climate change will be back on the agenda.
8So here the various methodologies that can be used to verify carbon neutrality. Also, what are the next steps on this frontier.
Click on Reports for more. Details
8There has been evidence of LSTK contracts signed without the requisite technical documents
8The anomaly is being rectified
Click on Reports for more
Details
8Onland rig hiring is on again
Click on Reports for more Details
For reference purposes the website carries here the following tenders:
8Procurement of MSQ NHDT 801-R-01 Catalyst Details
8Design, Supply, Installation and Commissioning of Robotic Telescopic Conveyer for Loading of LPG Cylinders Details
8Tender for Carrying out T4S Audit for Petroleum Installations Details
8Tender for Contract for Conversion of HSD Nozzles to VRS Enabled Nozzles Details
8Supply of Compressor and Hydraulic unit Spares Details
8Procurement of MATZ Pump Spares Details
8Procurement of Relief Valves Details
8Tender for Machining Jobs for IREP TA Rotary Turbomachinery or Other Equipment Details
8Tender for CLO Filtration Package FCCU-2 Details
8Tender for Electrical Works for Supply, Installation and Commissioning of Cable & Cable Tray Details
8Design, Engg, Procurement, Construction and Commissioning of one (01) NEW 30,000 M3 Floating Roof Storage Tank Details
8Tender for Double Studded Adapter Flange Details
8Tender for Geotechnical Investigation Works Details
8Tender for Carrying out Electrical Works Details
8Rate Contract for Consultancy Services for Miscellaneous Process Safety Jobs Details
8Supply of Carbon Raschig Rings for Scruber Column of Isomerisation Unit of Motor Spirit Plant Details
8Tender for ARC for Insitu Machining of Flanges and Surface Finishing of Gasket Seat Faces Details
8Tender for Shipping Agency Contract Details
8Tender for Special Temperature Elements Details
8Supply of Line Casing Pipe 20INCH AND Cross Over Details
8Tender for Integrated Electrosurgical Unit and Vessel Sealer Details
8Tender for Hiring of Contract Services for Operations of LNG Dispensing Details
8Tender for QRA & HAZOP & OISD Gap Analysis & ERDMP Updation Details
8Tender for Bottling Services for LPG Cylinders Details
8Tender for Providing Facility Management Services Details
8Supply of Venturi Flow Elements for CDW Unit Details
8Supply of Hydraulic System Details

You can also click on Tenders for more
For reference purposes the website carries here the following Newsclips:
8Household LPG access in India: An Update Details
8Reframe policy for promotion of green fuels Details
8Brazil keen on working with India on flexible fuel vehicles, says envoy Details
8Adani earned Rs 1,612 crore per day in 2021: Hurun India Details
8RIL CFO to transfer 3.5L shares in ’23 Details
8GAIL, ED (BD- Green Energy & Hydrogen) participates in National Meet on RTI act Details
8After crude, Centre now expedites plan to set up strategic gas reserve Details
8Adani Group enters into a no-poaching pact with Mukesh Ambani ledReliance Industries Details
8Indian oil imports to begin soon Details
8Oil and Natural Gas Corporation Limited - ONGC signs MoU with Chevron Corporation to assess exploration potential in India Details
8Maharashtra: Oil spill covers 8 km 2 off Sindhudurg coast Details
8BPCL bags 17 awards at National Awards for Excellence 2022 Details
8India'sLNGtenderactivity jumpsonpriceweakness, fertilizerdemand Details
8Nagaland: NPF leader asks for resumption of oil exploration in state Details
8Oil Exploration Begin In Puri Details
8Oil prices slip after U.S. interest rate hike on fears for demand Details
8Number Theory: Is there a China angle to India’s trade deficit? Details
8U.S. Oil Inventories Rose by 1.1 Million Barrels: EIA Details
8‘Too Little, Too Late,’ Says Aramco CEO of Global Oil, Natural Gas Investment Details
8Russian Oil Price Controls: How They Would Work and What They Might Do Details
8Deepening collaboration between Russia and India sustains a multipolar world Details
8Tata Motors launches all-new 5W30 synthetic engine oil for commercial vehicles Details
8Assembly panel raps Gujarat State Petroleum Corporation over Rs 500 cr loss in KG Basin block project Details
8Consultations On Windfall Tax An Ongoing Process: Oil Ministry Details 
8Airbus says India has all the substances to become a big market for sustainable aviation fuel (SAF) Details 
8RIL's leverage to remain at close to 1x despite large capex: Fitch Ratings Details 
8High CNG prices: Mumbai taxi drivers, auto drivers demand fare hike to survive Details 
8CNG pumps in Pune will remain closed on October 1 Details 
8India's LNG tender activity jumps on price weakness, fertilizer demand Details  
You 
can also click on Newsclips for more  
Details
Get an update on:
8Baitalpur POL depot
8Bokaro-Angul greenfield gas pipeline project
Click on Details for more Details
8Shelf drilling, ltd. announces application for listing of shelf drilling [SD] Details
8Summary of the Proceedings of the 38th Annual General Meeting of the Company [JD] Details
8Details of Loss of Certificate / Duplicate Certificate [ALPHAGEO] Details
8Details of Loss of Certificate / Duplicate Certificate [RIL] Details
8Notification of Trading Plan under Regulation 5 of the SEBI [RIL] Details
8Announcement under Regulation 30 (LODR)-Analyst / Investor Meet - Intimation [IEX] Details
8Selection for the post of Director (Finance), Numaligarh Refinery Ltd [PESB] Details
8Cambay India & UK CCS Update [Synergia] Details
You can also click on Details for more
Details
8Who really is trading in the IGX these days, whose volumes have spurted?
8Is there abnormal profits made?
Click on Details for more Details
8Project Name: Dehradun District City Gas Distribution
8Project Cost: Rs 250 crore
Click here for more details.
Details
8Project Name: Raisen, Shajapur and Sehore Districts  City Gas Distribution
8Project Cost: Rs 300 crore
Click here for more details
Details
There is an LNG contract for a power project
8And public sector companies are competing for it
Click on Details for more Details
Rs 820 crore construction of 765 kV D/C Transmission Line: EPC package for T/L in October 2022
8The detailed survey and investigation have been completed for the T/L.
8Approval from PTCC, civil aviation, and defense is in the process.
8Several meetings have been conducted with the landowner for land acquisitions.
8RFQ for the EPC package for transmission line works is likely to be floated in October 2022.
Rs 830 crore greenfield hydroelectric project: PMC works package in November 2022
8Hydrology report has been approved by CWC.
8Forest clearance stage -1 is pending at the regional office.
8Drilling works at the site are in progress and drifting works are yet to be started.
8RFQ for the PMC works package is likely to be floated in November 2022.
Rs 550 crore greenfield hydroelectric power project: HM works package in Q4 2022
8Forest clearance stage -1 has been accorded by the DFO but stage -2 is pending at the nodal office.
8EC for the same has been granted by the MoEF.
8Pre-bid meetings for the same are yet to be conducted for the civil works package.
8RFQ for the HM works package is likely to be floated in Q4 2022.
Rs 9800 crore super-critical thermal power expansion project :  Absorber system package in October 2022
8Civil and structural works of SG are in the advanced stage for completion.
8Slow progress of civil works by the sub-contractor.
8EPC has de-scoped certain works from the sub-contractor.
8NDCT contract has been terminated and its work is at a standstill condition.
8Detailed design of FGD works has been approved.
8RFQ for the Absorber system package is likely to be floated in October 2022.
Get in touch with us for more on these projects
Details
Get the daily updates for
8Weekly Fertilizers
8All tankers
8Bulk and Dry cargo
8Port Update
Click on Reports for more Details
 < 1 2 3 4 >  Last ›

Showing 51–100 of 272 items