All content in this website is sourced legitimately

Archives


All the news items since the launch of our web site are preserved in the archive section. The archive entries are freely accessible to all the users.


Jun 2025

For reference purposes the website carries here the following tenders:
8Providing services for carrying out operation & maintenance activities at Irimpanam installation Details
8Tender for providing services for degassing and desludging operations Details
8Tender for modernization of DCU-CDSP old freight elevator including ARD installation Details
8Tender for operation of heating, ventilation, and air conditioning system Details
8Engagement of consultant for market study, valuation, transaction advisory & post-transaction support Details
8Tender for electrical maintenance contract Details
8Supply of twin aviation light fitting Details
8Tender for composite works of unit and balance offsite for Biturox project Details
8Expression of interest for setting up of plastic processing industries Details
8Procurement and installation of Sophos firewall license with 3-year subscription for all locations and stations Details
8Supply of automatic backwash type filter Details
8Rate contract for LAN cabling and other related miscellaneous works Details
8Annual rate contract for the supply & commissioning of 30 KVA, 3/3 phase stabilizer to petroleum retail outlets Details
8Tender for broadband seismic survey in ultra-deep offshore blocks (corrigendum-1) Details
8Two-year comprehensive annual maintenance contract for installed biometric access control system Details
8Supply of MV power and control cables for Delayed Coker Unit revamp project Details
8Supply of high-speed integrally geared centrifugal pump Details
8Purchase of spares for FS-Elliott air compressor Details
8Supply of 220 kV gas insulated substation package for PDH-PP plant with ethane and propane storage and handling facilities Details
8Supply of aqueous film forming foam Details
8Annual maintenance contract for electrical works Details
8Annual maintenance contract of 2 nos. Atlas Copco compressors on proprietary basis Details
8Tender for development of new A-site retail outlet Details
8Tender for hiring of 20MT hydraulic crane services on callout basis Details
8Procurement of work assistance in miscellaneous mechanical maintenance jobs Details
8Supply of CS fittings, flanges, valves, insulating joints & other misc. items Details
8Supply of two-legged aluminum extension ladder Details
8Supply of portable gantry crane Details
8Tender for supply of vertical profile projector Details
8Supply of power quality analyzer Details
8Procurement of RFID and FASTag boom barrier system Details
8Tender for transportation of mass flow meters under IPS Nasirabad for a period of 2 years Details
8Procurement of RGD-resistant door seals for scraper traps or pig barrels Details
8Tender for repair, maintenance, and installation of plant systems and equipment Details
8Tender for replacement of hot outlet collectors and reformer catalyst tubes of hydrogen reformer in Plant 205 Details
8Comprehensive maintenance contract for fire detection, fire alarm, fire hydrant, and sprinkler system Details
8Tender for hiring of security & loss prevention services Details
8Tender for repair of insulation and GRP cladding of steam line Details
8Tender for support services of testing engineers for assistance in electrical testing and RTF jobs during shutdown Details
8Tender for overhauling of ABB-make HT motors Details
8Supply of fire pump house and allied electrical maintenance Details
8Supply of metallic bearings Details
8Procurement of trailer mounted diesel engine driven fire pump of minimum 6200 LPM Details
8Statutory testing, inspection & certification for periodic examination of 3 nos. × 150 MT bullets Details
8Supply and installation of 75-inch interactive intelligent panel with inbuilt personnel computer Details
8Supply of HD LED TVs, refrigerators, deep fridge and front load washing machine Details
8Bottling assistance for LPG cylinders by private bottler Details
8Supply of Tego-Prene sulfur agent for Sulfur Recovery Unit Details
8Supply of hydrocarbon gas detector Details
8Supply of tube bundle Details
8Supply of oil filter cartridges Details
8Supply and installation of 3” plug valves-CS Details
8Supply of heat exchanger tubes Details
8Supply of pilot valve Details
8Supply of magnetic inserts for NHT feed filter Details
8Procurement of HYDAC 53B accumulator spares Details
8Supply of heat exchanger tubes Details
8Supply of steel tubes Details
8Supply of filter cartridge Details
8Procurement of combo valve with integrated actuator for Hippo cylinders Details
8Procurement of stationery items Details
8Supply of carbon steel pressure vessels up to 25 mm thickness Details
8Supply of radiator assembly for Kirloskar pneumatic equipment Details
8Procurement of spares for CDU4 MRS GIS Details

You can also click on Tenders for more
For reference purposes the website carries here the following Newsclips (These are public domain newsclips and the website is not responsible for their content):
8CNOOC starts production at Weizhou 5-3 offshore oilfield in South China Sea Details
8Kenya plans to launch crude oil exports in 2026 Details
8Ulhasnagar launches first biogas plant on World Environment Day Details
8ADNOC Gas strengthens partnership with JERA Global Markets Details
8LNG/hydrogen-powered Ultramax bulker design earns RINA’s approval Details
8PIL adds second 8,200 TEU containership to LNG dual-fuel fleet Details
8Petrol’s popularity runs out of gas in FY25 as CNG's market share more than triples in 5 years Details
8IEA tracker highlights wave of LNG export growth Details
8Top exporting nations fueling the global liquefied natural gas market Details
8Mumbai's 125 billion-mile gas gamble — Mahanagar Gas set to ride CNG demand boom, says Morgan Stanley Details
8Gas stations are adding EV chargers and reasons to wait around Details
8Oil prices hold gains ahead of US-China trade talks Details
8Green hydrogen push: 13 R&D/demo plants in progress; PSU refineries to float 128 more tenders Details
8Indian oil & gas sector to witness strong growth despite global volatility Details
8Blue Energy Motors delivers 8 LNG-powered trucks to Inland World Logistics Details
8DTC revises rates to hire its electric buses Details
8LPG delivered to over 33 Cr consumers within hours Details
8Visakh Refinery's processing capacity increases to 15 million Details
8IOC finalises India’s largest green hydrogen plant at Panipat IndianOil by 2027 Details
8India targets 1,000 hydrogen-powered buses and trucks by 2030 Details
8Public employees in Iraq's Kurdish region caught in the middle of Baghdad-Irbil oil dispute Details
8Iraq’s oil exports to Greece valued at over $5 billion in 2024 Details
8India’s oil & gas sector poised for steady growth through FY26-27 despite market volatility: Research Details
8OPEC oil output in May rises less than planned, Reuters survey finds Details
8Refinery expansions set to drive India’s oil imports in second half of 2025, says Vortexa Details
8India set to attract Rs. 8,000+ crore investments for energy storage, EV, and green hydrogen at IESW 2025 Details
8Hygenco breaks ground on green ammonia plant in Odisha Details
8Afcons bags LoA for RIL’s vinyl projects at Dahej Details
8Coal India to soon open 32 stressed mines to meet energy demands Details
8Keel laid for Indian Navy's latest offshore patrol vessel at GSL Details
You can also click on Newsclips formore
Details
8Additional session in auction market [IGX] Details
 
8Unified tariff and zonal apportionment details for national gas grid system for FY 2025–26 (01.06.2025 to 30.06.2025) [PNGRB] Details
 
8India's natural gas demand projection for 2030–2040 [PNGRB] Details
 
8Corrigendum to financial result for the quarter and year ended on 31st March, 2025 [Confidence] Details
 
8Revised auditors' report (consolidated) for the year ended March 31, 2025 [MIL] Details
 
8First LNG vessel successfully discharged during monsoon season [GAIL] Details
 
8Investor presentation June 2025 [MGL] Details
Details
Kharsang’s 40-well clearance signals long-term oil uplift
8While only two wells are producing, HOEC has clearance for 40 development and 3 exploration wells in Arunachal—setting up a multi-year drilling campaign with potential reservoir upside.
B-15 could be HOEC’s dark horse in offshore gas
8Newly acquired and 100% owned, B-15 comes with two ONGC discoveries and complete seismic data. Shallow waters mean lower capex, and a production start is targeted within 30 months.
PY-1 gas gets a 2x price bump as HOEC signs new term sheet
8The old US dollar 3.66 per mmbtu price is gone. A fresh term sheet with GAIL offers US dollar 6.75 on gross calorific value—pending a green light from PetroVietnam by June-end.
390,000 barrels in storage, and HOEC isn’t in a hurry to sell
8With crude prices underwhelming, HOEC is holding back nearly 400,000 barrels from B-80—waiting for the US dollar 75 mark. With capacity to store 900,000 barrels, the clock isn’t ticking yet.
Dirok’s forest pipeline nears finish line—gas grid could flip the field
8The 15-km stretch through forest terrain is done. Once the North-East Gas Grid links up in FY26, Dirok’s latent capacity—up to 55 mmscfd—can finally find buyers across India.
B-80 workovers to halt production for a month, but more oil may follow
8HOEC is planning tubing replacements and zone shifts in B-80’s two offshore wells. A 30-day pause is expected, but the target is higher, more stable flow post-restart.
HOEC rewrites B-80 revenue model to ensure survival
8The company has scrapped day-rate infra charges in favor of per-barrel pricing—keeping its FPSO, MOPU, and SPM alive during low production. It’s about sustaining the ecosystem, not padding topline.
HOEC quietly imposes debt ceiling tied to market cap
8Even as drilling and infra work picks up, HOEC says it won’t borrow more than 10% of its market value. That caps future debt around Rs 200–250 crore, adding a fiscal discipline layer.
HOEC holds 21% in PY-3 but gets nothing—arbitration may change that
8ONGC resumed production from PY-3, but HOEC, despite its 21% stake, isn’t getting returns. A legal battle is underway—and a favorable ruling could bring retroactive payouts.
One-time gains cushion Q4 profit as volumes stay weak
8Rs 46 crore in unpaid interest from AEPL and Rs 76 crore in other income bolstered HOEC’s bottom line this quarter. But it’s not from operations—production remains subdued.
 Click on Reports for more
Details
For reference purposes the website carries here the following tenders:
8Supply of pump spares Details
8Supply of fuse fittings Details
8Procurement of critical spares for 3 number HTPC make carousels Details
8Supply of hanging hardware for MPDs Details
8Procurement of gearbox spares for wash water injection pump Details
8Providing electrical system maintenance work Details
8Procurement of bolts, nuts, and washers for tank wagon Details
8Supply of gear box Details
8Procurement of pump spares Details
8Procurement of spares for KHDS BCR pump Details
8Tender for requirement of CPP MHS flap gate assembly Details
8Supply of grid coupling Details
8Procurement of spares for Schneider make switchgears Details
8Supply of fasteners Details
8Supply of V belt Details
8Supply of hollow glass sphere Details
8Supply of LPG plant spares Details
8Supply of heavy alkyl benzene Details   
8Appointment of consultant for Third Party Due Diligence (TPDD) on vendors, Customers and Franchisees for 3 Years period Details
8Supply of new scraper PIGs and spares for RRKPL pipeline Details
8Supply of SS pipes, bends, and materials Details
8Supply of ball valve Details  
8Appointment of an Agency to conduct onsite training for Retail Outlets staff Details
8Procurement of electro fusion machine along with MDPE tools and fittings Details
8Supply of inspection of N2 compressor rotor Details 
8Tender for Insulation Works at Multiple Locations in Refinery Area for TA26 Details
8Annual rate contract for fabrication of pipelines and structural works for process modification Details
8Annual maintenance contract for Metrohm and Elga instruments Details
8Procurement of tubes for furnace Details
8Procurement of complete vessel Details
8Appointment of PNGRB approved TPIA for ERDMP, IMS audits Details
8Appointment of agency for providing watch and ward services on a rate contract basis Details
8Rate contract for the period of 2 (two) years for appointment of agency for providing watch and ward services Details  
8Tender for Shifting/Rerouting of 66KV Sikka-Shapar GETCO transmission line Details
8Supply of equipment for CPP and substation monitoring Details
8Supply of handheld metal detector Details
8Appointment of “OEM business promoters” for liaisoning of OEM direct business Details
8ARC for expert supervisory services for Siemens turbine troubleshooting and overhauling Details
8Procurement of 50 MT polymer processing additive Details
8Procurement of detachable conveyor chain for LPG cylinders Details
8Annual rate contract for maintenance of Neptune Industries Ltd packages at CMU plant Details
8Procurement of mechanical seal spares Details
8Supply of network equipment for additional fixed speed cameras Details
8Compressed air and cryogenic nitrogen plant package for PDH-PP plant with ethane and propane storage and handling facilities Details
8Rate contract for tank maintenance and inspection services agency Details
8Tender for support services of testing engineers for electrical testing and RTF assistance during shutdown Details
8Supply of column trays, internals & nozzles for MF column and PF column Details
8Tender for supply, installation, testing, commissioning, and integration of master control station with existing TAS Details
8Tender for collection and monitoring of exhaust gas emissions from mainline engines Details
8Tender for spot billing services for domestic customers Details
8Tender for agency engagement to perform L3 isolator repair works Details
8Procurement of automated on-line crude blending system for CDU-2 and CDU-3 Details
8Procurement of operational spares of Neelam MOL Details
8Appointment of investment advisor (IA) in compliance with SEBI Details
8Tender for operation requirement of 33kV gas insulated switchboard for Bina Petchem & refinery expansion projects Details
8Annual subscription of international code and standards Details
8Tender for supply, installation, testing, and commissioning of automatic access control system Details
8Tender for composite works: structural, piping, mechanical, electrical & instrumentation jobs Details
8Transportation of Indane LPG cylinders in vertical position on unit rate basis Details
8Supply of spent caustic regeneration catalyst Details
8EOI for providing AI-ML based solutions for two process problems Details
8Tender for operation and maintenance of fire fighting units Details
8Tender for inspection, segregation, handling, and shifting of various scrap materials to designated location Details
8Tender for supply, installation, testing, and commissioning of 63 MOV actuators Details
8Tender for painting works at equipment house building Details
8Procurement of 200 nos fire hoses Details
8Annual maintenance contract for repair, servicing, and calibration of BW Honeywell portable personal gas monitors Details
8Tender for annual rate contract hiring for operation department Details
8Supply of high-speed diesel Details
8Annual operations and maintenance contract for HVAC system Details
8Tender for integration of existing tank farm management system Details
8Supply and installation of 1 MT capacity, 20-meter high tower hoist Details
8Tender for integrated security surveillance system services Details
8Tender for integrated facility management services including mechanized operations Details
8Supply of FRP storage tank Details
8Procurement of operational spares of Neelam MOL Details
8Supply of CO2 fire extinguishers Details
8Supply of molded case circuit breakers Details
8Tender for hot repair, painting, testing & transportation of used LPG cylinders Details
8Procurement of HFHSD for DS-MBA Basin, Kolkata through rate contract for a period of 02 years Details
8Tender for engagement of an agency / service provider for COCO/OSTS coordinator Details
8Empanelment of vendors for onshore 2D and 3D seismic surveys based on vibroseis vibrators as energy source Details
8Tender for execution of PDA incinerator shutdown jobs (Aug–Sep 2025) Details
8Tender for hiring of TPI for premium tubing Details
8Supply of 25 kg DCP type fire extinguishers Details
8Tender for repair and maintenance of carpet road under NK GGS 3 Balol GGS 2 and Balol GGS 1 of Mehsana Asset Details
8Tender for assistance in quality & quantity checks and control for LPG cylinder receipt & dispatch at LPG plant Details
8Annual rate contract for HDPE and CPVC piping works Details
8Procurement of conveyor screw take-up pillow blocks for CPP unit Details
8Supply of MS pipes and MS structural materials on door delivery basis Details
8Tender for providing manpower assistance for rake loading and unloading operation Details
8Tender for operation of in-house statutory testing and painting facility Details
8Annual maintenance contract for SAP applications Details
8Procurement of CCTV surveillance systems Details
8Supply of hydrogen analyser Details
8Tender for servicing and maintenance of Honeywell Notifier make fire detection and alarm FDA system Details
8Tender for expert services for maintenance of slide valves Details
8Supply of piping and structural hot jobs during M&I shutdown Details
8Supply of metallic seals Details
8Supply of fittings and flanges Details
8Supply of compressor spares Details
8Supply of carbon steel cast valves and stainless steel cast valves Details

You can also click on Tenders for more
For reference purposes the website carries here the following Newsclips (These are public domain newsclips and the website is not responsible for their content):
8Bp secures long-term LNG deal with India's Torrent Power Details
8Canada confirms work has begun on 559-mile Prince Rupert gas pipeline Details
8U.S. jobs report spurs oil rally, fuels economic recovery hopes Details
8Taiwan official visits new LNG site in Alaska Details
8U.S. pipeline expansion to add 99 Bcf/d, mostly for LNG export, report finds Details
8PIL celebrates naming of LNG dual-fuel container vessel in Singapore in conjunction with SG60 Details
8PMC to set up biogas plant at city’s Bazar Samiti Details
8Assam to team up with Oil India to turn trash into biofuel in five cities Details
8India can increase imports of shale gas, LNG, crude from US: Official Details
8Asian LNG spot prices fall on weak demand and high inventories Details
8GAIL’s Dabhol LNG terminal soars to new heights with all-weather port triumph Details
8Alaska LNG promises gas cheaper to Asia and Europe than on the American stock exchange Details
8Guru Dakshina: Mukesh Ambani pledges Rs. 151 crore to ICT Mumbai Details
8Auto LPG could cut 40 percent of vehicle pollution in India, details inside Details
8India delivers LPG to over 33 crore consumers after booking within hours: Hardeep Puri Details
8Ratnagiri: LPG tanker accident on Mumbai-Goa highway causes major fire; several injured Details
8NRL to set up 200 KTPA sustainable aviation fuel plant in Odisha Details
8International consortium rolls out major EV battery swapping initiative in Tokyo Details
8EIL Leads Dabhol Breakwater Project, Boosts GAIL LNG Terminal Operations Details
8Oil prices hold gains ahead of US-China trade talks Details
8Green hydrogen push: 13 R&D/demo plants in progress; PSU refineries to float 128 more tenders Details
8GAIL receives first vessel post-breakwater at Dabhol, aims to handle 100 LNG cargoes annually Details
8Refiners Reliance and Nayara tap India's drivers as export markets tighten Details
8Russia to drive India crude imports in H2 2025, but intensity may wane Details
8Hydrocarbon presence confirmed in Brahmaputra’s North Bank at Kobochapori: Oil India Details
8Saudi, Russia, Iraq, UAE boost oil supply to India, capture 78% market share Details
8Global energy investment set to rise to $3.3 trillion in 2025: IEA Details
8OPEC+ giants ramp up additional oil to India; market share nears 78%; supplied 375,000 bpd to India in May Details
8Oil prices hold gains ahead of US-China trade talks Details
You can also click on Newsclips formore
Details
The world may talk transition, but the money is circling back to fossil fuels.
8This Indian EPC consultant is now seeing a reversal—clients walking away from green capex and returning to hydrocarbons.
8This isn't just a trend.
8It's a global undercurrent.
Click on Details for more Details
Fifth deadline push in BPCL Bina ETP bid raises planning red flags
8With four successive bid extensions and unresolved technical ambiguities, the ETP tender under BPCL’s Bina expansion now signals planning instability, raising execution and sizing risks for bidders.
8TSS now floated at 200 mg/L, then diluted with vague ‘finalize later’ language. EPC bidders face design and costing limbo.
8Bidders flag irrelevance of Thyristor and NIFPS AMC, but EIL refuses deletions — risk pushed downstream.
8No Zone 0/1/2 mapping provided. EIL hands off classification — increasing compliance exposure.
8Bidders asked for clarity on motor efficiency class, but EIL response redirects to tender note with no explicit resolution.
8EIL insists on <20 mg/L COD without addressing recalcitrant load concerns in refinery effluent — risky assumption.
8Vendors cannot price undefined AMC scope for NIFPS or Thyristor panels. Bidding integrity suffers.
8Despite a 6000+ page tender, basics like inlet quality and motor specs are left ambiguous.
8With four prior extensions, confidence in project readiness and bid evaluation stability is now under question.
EIL’s steam package tender for BPCL triggers critical design shifts
8Key electrical and mechanical specifications in BPCL’s steam generation package tender were quietly overhauled via pre-bid replies and commercial amendments.
8With deadlines now extended, bidders face an uphill task recalibrating costs and scope.
8The exclusion of motor-driven pump reduces redundancy in steam startup strategy. Is BPCL betting on gas grid stability?
8With pre-bid clarifications adding significant scope, the third bid deadline extension offers scant room for recalibrated costing.
BPCL’s polypropylene bagging plant tender sees repeated deadline extensions: Bidders cautious?
8With bid due dates now extended to 13 June 2025, industry players are eyeing the Rs100 crore tender with hesitation.
8The tender demands turnkey automation of multiple packaging lines – from 25 kg bags to 715 kg jumbo formats – testing bidders’ integration capabilities.
8Is the complexity of automation or EMD-heavy terms slowing down submissions?
Oil mist, trip logic and pressure margins: MRPL compressor bid stirs a debate
8The MRPL’s recycle gas compressor tender expose key engineering contentions — from API compliance deviations to logic overrides and pressure-drop accountability.
8EIL responds with a firm but selectively accommodative stance.
Click on Details for more
Details
Six elite OEMs line up for Dahej PDH pump package as EIL enforces zero-deviation bid call
8Top-tier pump vendors compete under a rigid no-deviation framework for Petronet’s ethane–propane complex.
8Find out who they are
8No EMD required, but cash flow-linked milestones may strain vendors.
Digital command center tender at BPCL Kochi draws top IT contenders amid intricate safety and integration demands
8Five heavyweights are in the fray for BPCL Kochi’s CDE Control Tower project.
8This isn't a regular IT tender — it's a refinery-grade digital infrastructure mandate demanding hardcoded safety, full-spectrum system integration, and post-go-live operational stability.
8The tender sees a rare mix of EPC-oriented and pure IT consultants.
HPCL’s subsea pipeline wrapping job: All three bidders clear technical scrutiny
8HPCL’s subsea pipeline wrapping job sees technical qualification of 3X Engineering, Coastal Marine, and Underwater Services, signaling a technically sound and competitive bid round.
Top-tier valve players lock horns for Usar PDH package
8With heavyweights like Velan, Leader, and Oswal in the fray, GAIL's limited tender for critical LT and cryogenic valves sees fierce competition among EIL-approved vendors.
8Long-time industry leaders now face off with agile mid-sized firms in this tightly contested procurement.
Top consultancies falter in BPCL greenbelt tender
8Big names like PwC, CII, and TUV SUD were disqualified in the technical stage
8This reveals how the tender demanded field-level biodiversity credentials, not corporate clout. 10 out of 12 bidders failed to qualify, highlighting a shift towards ecological rigor and statutory depth in public sector tenders linked to refinery operations.
8The tender’s scope included tracking endangered species, IUCN-linked risk, and carbon sequestration—a multidimensional ask that most firms couldn’t meet.
HDD race intensifies: 4 players in fray for river crossing drill
8Four bidders vie to clinch the Atherbanki River HDD contract under the NRL expansion pipeline, setting the stage for a critical stretch in India’s crude logistics corridor.
Andhra Refinery Margin game: Indomer’s bid undercuts rival
8EIL’s award for the Ramayapatnam refinery study went to Indomer, whose quote was 12–37% below others
Click on Details for more
Details
The world may talk transition, but the money is circling back to fossil fuels.
8This Indian EPC consultant is now seeing a reversal—clients walking away from green capex and returning to hydrocarbons.
8This isn't just a trend.
8It's a global undercurrent.
Click on Details for more Details
No Price Bid Yet—Empanelment-only Tender to Pre-Qualify Vibroseis Contractors
8ONGC will invite price bids only from those empaneled through this process. With no EMD or commercial offer required upfront, this is a low-barrier, high-stakes gateway for seismic players.
8The BEC mandates credible seismic work history using vibrator fleets. For multi-sector bids, the bar is even higher: 250 LKM or 50 SKM. Proof of delivery is non-negotiable.
8ONGC allows bids based on parent/sister companies' experience—but demands an extra 50% performance bank guarantee from the supporting firm. So group synergy now comes with a price
Cyclic Steam Stimulation Returns to Spotlight in ONGC’s Enhanced Recovery Drive
8ONGC pushes CSS operations using portable steam generators—pointing to renewed urgency in boosting recovery from tight, viscous reservoirs in Gujarat’s declining fields.
8Only vendors with proven high-pressure, high-temperature (HPHT) steam systems and real-world CSS experience stand a chance.
From Flare to Fuel? ONGC Looks to Repurpose Vent Gases in Ahmedabad Asset
8ONGC is scouting for solutions to store or reuse flare gas—possibly for power generation or reinjection.
8From emissions recovery to vapour reutilization, this EOI is an early building block for carbon-smart oilfield operations in India’s oldest producing basin. A sign that sustainability is moving from policy to plant floor.
GSPC Clarifies Viton FPM Requirement for Seals—No Substitutes Allowed
8The pre-bid note firmly states only Viton FPM rubber will be accepted for Chiksan loop sealing—closing the door on cheaper alternatives. Vendors must align their BOM now.
8The company demands SS 304 or SS 316 for ball races in the Chiksan swivel joints. Mild steel or carbon steel alternatives won’t pass technical evaluation.
8Despite vendor murmurs, GSPC did not dilute the API 5L Grade X65 spec for the discharge line pipe. Bidders must factor premium steel cost into their quotes.
GSPC Confirms Sale of Emulsified Crude on “As-Is” Basis—No Quality Claims Allowed
8Pre-bid clarifications confirm that buyers must lift crude in its emulsified state, with no guarantees on BS&W levels. Quality control will rest solely on the buyer.
8GSPC stops short of calling it ‘refinery-grade’. This confirms that emulsified crude will need dehydration and heating—potentially costly for small players.
Click on Details for more
Details
Consultancy contracts may get you in the door. And earn you your high margins
8Turnkey projects may build your topline.
8But it’s the change orders—midstream scope alterations priced at a premium—where the real money is made.
8Engineers India Ltd just let that truth slip, and it’s worth unpacking.
Click on Details for more Details
This revolutionary 2G ethanol technology may soon be a unique proposal, not just for India but for the world.
8There is Rs 4000 crore running on it
8And if it succeeds, it will be a unique moment indeed
But will it be so? Details
It is easy to get month-old import data but it is difficult to solicit forthcoming shipment information in India. We go through a laborious process of data collection to get you full import information, including company-wise, quantity-wise, port-wise, vessel-wise cargoes which are coming into India in the next 15-to30 days.
Get the daily updates for :
8LNG
8Crude
8Chemicals
8Fertilizers
8Coal and Coke
8LPG
8Ammonia
8All tankers
8Bulk and Dry cargo
Click on Reports for more. Details
Vendors must deliver a 2040 forecast with 20-year price history, SWOT, and custom insights for IPA, Propylene, R290 and White Oil
8Where will the bidders get the price history?
8None of them have the data readily available as it will need them to collect price laboriously from the market over a long period of time, so they will subscribe to our sister site IndianPetroChem.Com and get them
8If they do not, then what HPCL should do is to insist on data purity, where was the data collected from?
8For there is nowhere else that this local data can otherwise be collected Details
8Here's what's happening today in the E&P, midstream-downstream, and CGD section
Click on Reports for more Details Details
CPCL’s multi-stage clarifications reveal deep rifts in BOO responsibility, risk sharing, and infrastructure coordination.
8Multiple bidders question the logic of certain clauses while CPCL stands firm — raising concerns over project bankability, technical clarity, and future dispute risks.
8No water, no power, no effluent link — bidders must manage end-to-end setup, raising project CAPEX sharply.
8Hydrogen delivery risk shifts entirely to BOO, unsettling financiers banking on fixed offtake.
8NR-only pricing narrows financing routes, pushes LCOH up by 25–30% — banks wary.
8Purity levels unlikely to justify pigging, yet the clause remains — bidders baffled.
Click on Details for more   Details
From manpower firms to mud pumpers, everyone wanted a piece of the rig game
8Because they saw existing rig owners prosper
8But ruthless qualification filters, tightened during the qualification process, keep them all away
Click on Details for more Details
These firms will soon qualify for an extremely elite energy club that will do deals worth thousands of crores in one go
Never before have the selection criteria been more selective
8Deloitte India
8PwC India
8Ernst & Young (EY) India
8KPMG India
8Alvarez & Marsal India
8SMC Capitals Ltd.
Find out more Details
8ToR tinkering takes centerstage, and EAC is flooded with amendment pleas.
8More than half the oil & gas cases in the June EAC meet revolve around tweaks, not fresh clearances.
8Is it mere compliance fatigue or strategic shortcut?
We believe these are short cuts
8Whether it's Nayara, OIL, or Ganges — key data on hydrological load, cumulative emissions, or ESZ proximity often remains unfiled.
Click on Details for more
Details
8Both sugar-based ethanol and refinery-linked biofuel proposals now ride on B2/green labels
8These raises questions on true sectoral impacts.
8And the regulators have no idea
Click on Details for more
Details
8From workovers to new facilities, Oilmax’s Gujarat block proposal underscores the need for modular approvals in mature fields.
Click on Details for more
Details
8Full development plan for Gulf of Khambhat block lands at EAC with no mention of spill mitigation, high tide zoning, or marine life impact.
Click on Details for more
Details
8EC revisions have become routine among smaller E&P firms — but lack of coordinates, risk maps raise audit questions
Click on Details for more
Details
NPK-TSP-GSSP Greenfield Project
8Cost: Rs. 100Cr.
8Project Event: Procurement activities remain delayed due to continued financial stability challenges. However, progress has been made with the issuance of the Request for Quotation (RFQ) for the technology license and LSTK contractor in May 2025. Considering the ongoing financial constraints, the finalization of the technology licensor and LSTK contractor has been extended to August 2025, allowing sufficient time for evaluation and economic arrangements.
SSP/GSSP/PSSP Greenfield Project
8Cost: Rs. 100Cr.
8Project Event:The release of the RFQ for the LSTK contractor has been further extended to July 2025, as internal alignment on the scope of work and final technical specifications is still ongoing. Although the project has already received environmental clearance. Details
Petronet’s PDH-PP pipe RFQ tightens eligibility: This weed out intermediaries and short-cap players.
8Only bidders with firm MoUs or in-house facilities get through; casual stockists need not apply as EIL screens for genuine technical alignment.
8Bidders can submit separate jobs for pipe supply and coating, but each parameter must be fully documented, discouraging fragmented or opaque participation.
8Even minor documentation lapses will lead to outright rejection, marking a shift toward unforgiving compliance enforcement.
8Bidders cannot supplement their PTR after bid submission unless explicitly listed—tightening historical accountability standards.
Bagging & Palletizing Tender for PDH-PP Specs hit ceiling: Challenge even for global vendors
8The spec sheet for the FFS lines pushes OEMs to deliver both speed and surgical precision — a challenge even for top-tier global vendors.
8OSHA-aligned safety fences with emergency gate interlocks, malfunction lighting, and anti-dump software create one of the most risk-averse specs in recent packaging tenders.
8Ferrous particle detection must be as low as 1.6 mm at shop conditions — vendors must prove lab-level sensitivity in factory-floor environments.
8Stretch hooding machines must handle 5- or 6-sided wrap modes, with dual-reel shafts and auto-change — even pallet size handling is expected to vary on-the-fly.
100+ item HPCL ROU scope sends bidders into a tizzy: Why is the refinery trying to do so much micro management?
8A 100+ item scope and high documentation standards suggest tighter scrutiny and end-to-end service accountability.
8This reflects a desire to micro-manage compliance Nearly 50 line-item categories rolled into a single tender
8The contractor is expected to serve as digital mapper, village-level registrar, and state liaison — all rolled into one.
8With all components bundled, the number of eligible bidders is likely to shrink — risking price discovery dilution.
Click on Details for more
Details
Rotary gear pump tender draws just one bid: Technical overreach or market fixing?
8The EIL-issued limited tender for PDH-PP service gear pumps closed with only Maag Italy Srl bidding.
8This raises concerns about excessive qualification constraints or brand-specific design.
8With reverse auction and part-award mechanisms ruled out, the tender structure itself signals an all-or-nothing approach that magnifies single-vendor risk.
L1 bidder secures spring support package with 25% price gap in NRL DCU revamp
8Pipe Supports Co outbid four contenders by a wide margin in the spring assemblies tender for NRL’s coker unit revamp.
8The 25–60% price spread signals aggressive undercutting and raises questions on cost realism for future bidders.
Stancor clinches GAIL pipe tender with 80% margin gap over L3
8With an aggressive quote of Rs. 15.2 lakh, Stancor beat L2 by 19% and L3 by over 260%.
8The wide bid dispersion hints at cost pressure at the bottom and disinterest or risk buffering at the top.
8L3 to L11 bids appear significantly buffered, possibly indicating margin stacking or caution on material specs.
Duplex SS heat exchanger bid sees clustering below Rs. 8.1 crore: Was there some underhand play?
8Three out of seven bidders stayed below this mark
8Does this signal industry familiarity with Petronet’s benchmarked expectations?
Click on Details for more
Details
Eleventh-hour delays cloud IOCL Paradip PMC bid: Sack the tender committee
8With 11 bid deadline extensions and shifting scopes between PMC and LSTK contractors, IOCL's ambitious Paradip PP Line upgrade project is testing industry patience and readiness. Consultant scope rationalization and tight client controls signal a project structured to mitigate IOCL risk—but not bidder workload.
8This is happening far too often, and someone needs to take the hit for this, the tender committee should be sacked.
Bid deadline deferred thrice as EIL tightens specs on BPCL Bina nitrogen plant
8Stringent relay logic, advanced temperature monitoring, and updated short-circuit ratings push vendors to recalibrate bids.
8With the submission date now extended to June 20, pressure mounts amid rising compliance costs.
8EIL mandates intelligent relays with communication, predictive diagnostics, and real-time trip cause identification. A shift to 3C3 conformal coatings adds cost and complexity for bidders.
8OTMS is now mandatory for all air circuit breaker panels, demanding wireless sensors, SCADA integration, and remote protocol compatibility—a notable jump in digital oversight.
8Level-2 minimum LPS and standardized strip sizes now explicitly mandated, adding new design compliance points based on geographic vulnerability mapping
8Despite pushback from vendors citing approval and inspection time, EIL refused extension of project timeline—timeline risk remains with EPC contractor.
EIL bends 10-year rule for PLL’s PDH pump tender: Corporate lobbying at play?
8In a rare move, EIL allows pump models supplied up to 15 years ago to qualify as field-proven, addressing OEM concerns over deployment scarcity in complex PDH service.
8With Sulzer flagging PTR gaps for its specialty vertical pumps, EIL alters eligibility terms
8Even with expanded eligibility, all instrumentation must be PESO-certified, potentially blocking even IECEx-compliant foreign OEMs from seamless qualification.
8From limited bidding to high-tech specs and field-proven clauses, this tender could see very few technically compliant bidders—unless more amendments follow.
ATF survey bid extended: IOCL’s 33 km pipeline faces routing scrutiny and environmental mapping hurdles
8Submission date for IOCL’s ATF pipeline survey has been extended, underscoring the complexity of clearances and route mapping through sensitive zones.
8Surveyors must navigate strict conditions on forest proximity, mining activity, and GIS compliance within tight timelines.
8Three alternate pipeline alignments—each crossing sensitive zones—require layered surveys including PDI, hydrological data, and CRZ-clearance-ready mapping.
8Final alignment depends heavily on GIS-layered justification.
8Despite being a "survey" tender, bidders must do groundwork for CRZ, Forest, Wildlife, and Mining clearance frameworks—without liability shields or advance payments.
Click on Details for more
Details
8Mega drilling and infra project in Assam submitted as mere EC amendment.
8Wildlife clearance and water drawdown issues remain vague.
8Some one needs to point that out but does the environment ministry or the EAC do their part?
Click on Details for more
Details
8Yet another Form-3 from ONGC signals a pattern of shifting baselines in NELP block planning
8This raises concerns over pre-bid clarity.
Click on Details for more
Details
Time Relief, Not Scope Relief: G&G Consultancy Tender Gets Breathing Room
8Though the deadline now reads 20-June-2025, the core scope — 2D/3D seismic interpretation and prospect ranking for 2 blocks — remains technically dense and commercially front-loaded.
Cementing Tender Clock Ticks On, With Tight Turnaround
8With the bid now due on 09-June-2025, contractors must act fast.
8OIL’s demand for immediate call-out response and 6000 psi-rated equipment leaves no room for makeshift solutions.
Rig Health Tender Gets Breathing Room, But Scope Remains Tight
8Though ONGC has extended the deadline, the scope — covering functional, electrical, and structural rig inspection — demands high readiness from bidders.
8Contractors must perform high-spec non-destructive testing, electrical insulation checks, and pressure testing — raising both skill and equipment bar.
Click on Details for more
Details
8A 6x refinery expansion typically warrants full EIA, but Nayara seeks a shortcut via amendment. Cumulative impact, CPA zone risks still unclarified.
8This is a huge refinery, and short cuts have to be avoided.
8The refinery is Russian owned but then the environment is ours
Click on Details for more
Details
Single-Trip Whipstock Tender Tightens Risk, Delivers No Comfort for New Entrants
8ONGC's latest 13-3/8” whipstock & window milling tender resets contractor risk to a new high. With zero tolerance for failure, the bid rewards experience, but leaves minimal room for contingencies.
8The Delhi session may become a flashpoint for NTPC outstanding payments and PPA compliance, as states like WBSEDCL and JBVNL struggle with liquidity and underdrawal.
8Even standby charges and redressals folded into lumpsum — contractors bear the price of readiness.
 PESO Compliance Shifted Entirely to Contractor in OIL’s Explosive Tender
8 All licenses, permits, security duties and transport to be managed by the contractor—raising entry barriers for smaller bidders.
8From land leasing to armed escort provision, contractors shoulder the full compliance burden. Margins may suffer.
Shah Bhogilal Undercuts Rivals to Win ONGC Assam Fire Safety Gear Bid
8In ONGC Assam’s procurement of 20 mobile foam trolleys, Shah Bhogilal Jethalal & Bros. emerged as L1 by a decisive margin, signaling aggressive price play in safety gear segment.
8Tough Specs, Slim Turnout: 353+ MH valves now await a new plan
Why ONGC’s Mumbai High valve repair job found few takers despite urgency and had to be cancelled?
8High-pressure rating, TPI scrutiny, and API workshop clause may have filtered out several potential service providers.
8From serial stamping to dual-stage TPI-inspected repairs, ONGC’s tender mandated a rigor that may have been misaligned with current domestic service capacities. A reissue may soften technical prerequisites.
8What is more, the tender pegs 353 SSVs for overhaul but puts an invisible ceiling on repair extent, especially for valves beyond salvage. The commercial ambiguity could be why the tender didn’t move forward.
8Any delay now carries safety implications as well as cost and timeline ripple effects.
Click on Details for more Details
8A rare EOI invites both existing and aspiring iso-octane producers, signaling IOCL's intent to localize supply chains for niche petrochemicals, even for small volumes as small as 78 MT annually.
8With no financial threshold or past performance required, the entry barrier drops — but will that attract fly-by-night firms or unlock latent capacity?
8Or was it forced to initiate it under pressure?
Click on Details for more
Details
For reference purposes the website carries here the following tenders:
8Supply of portable ground monitors Details
8Supply of non-refrigerated centrifuge for general purpose and research (Q3) Details
8Supply of asbestos cement sheets, length: 2500 mm Details
8Supply, installation, testing, commissioning of floor mounted tower type split AC of 4.0 ton capacity Details
8Supply of butterfly valve Details
8Supply of hose assembly Details
8Hiring the services of storage, transportation and management of explosives Details
8Supply of 37.37 KL tanks for crude oil storage Details
8Hiring of consultancy services for quantitative petrophysical evaluation of existing wells Details
8Supply of antioxidant PEPQ Details
8Supply of gasket Details
8Supply of soft soap Details
8Supply of steel tubes Details
8Procurement of CS plates, angles, beams and channels Details
8Hiring of security services for Bolani plant Details
8Supply of manually operated high volume long range foam cum water monitor with foam induction mechanism Details
8Supply of bearing isolators Details
8Procurement of pneumatic spares Details
8Annual rate contract for repair, maintenance, and testing of gas distribution systems Details
8Supply of Maspero make lift spares Details
8Procurement of PSVs spares Details
8Procurement of rope and gland packing Details
8Supply of plug valves Details
8Procurement of Rheonik make mass flow meter Details
8Tender for repair of pipeline anomalies under 12 inch HBPL Details
8Supply of hydrogen analyzer for Butamer unit Details
8Supply of pipes and fittings Details
8Procurement of OEM Milton Roy make pump spares Details
8Providing services for installation of pits and associated electrical works for extension of existing system Details
8Supply, installation, and commissioning of analyzer FLP HVAC units Details
8Procurement of moisture analyser controller for MS block Details
8Procurement of spare volume boosters of Flowserve make for HGU PSA Details
8Supply of manual globe valves Details
8Supply of API 6D ball valves Details
8Supply of HVLRM spares Details
8Supply of wagon unloading hoses with 4-inch nominal diameter and 6 meters length Details
8Supply of pump spare casings Details
8Supply of compressor spares Details
8Supply of CS gate valve Details
8Three-year rate contract for operation of ACTP API diesel pumps Details
8Supply of hydrocarbon gas detector Details
8Supply of smoke and heat detector test kit Details
8Supply of multifunction calibrator Details
8Supply of pressure safety valve Details
8Annual rate contract for hydro testing and refilling of Aragonite (IG-55), IG-100, Inergen (IG-541), Novec 1230 gas and associated cylinders Details
8Supply of digital pressure transmitter Details
8Supply of handheld multi-gas detector Details
8Annual maintenance contract for fire extinguishers Details
8Supply of LPG plant spares Details
8ARC for installation of sign board, vinyl stickering, painting and lettering Details
8Design, supply, installation, commissioning and maintenance of grid connected roof top solar power plant service Details
8Supply of balancing of N2 compressor rotor Details
8Supply of bunk house (Q3) Details
8Hiring of expert services for maintenance of dredgers Details
8Expert supervisory services for M/s Fati General Equipments Pvt Ltd make electrical heater Details
8Tender for refractory re-lining by vibro-cast method & dry out of TLE gas inlet chamber and channel boxes Details
8Supply, installation, and commissioning of optical fiber cable network for electrical substations Details
8Tender for process scale-up of in-house developed polymer additive Details
8Annual contract for maintenance of pressure gauges Details
8Tender for inspection of orifice plates used for flow metering Details
8Annual rate contract for event management services Details
8Supply, installation, testing, and commissioning of audio-visual and video conferencing works Details
8Annual rate contract for civil maintenance works at drill sites for facilitating work-over rig and CTU Details
8Tender for vehicle hiring services Details
8Tender for development of new KSK A site retail outlet Details
8Supply of CN melt Details
8Supply of sampling system for CDW and PP units Details
8Tender for enabling works for retail outlets Details
8Supply of deluge system equipment for PFCC unit Details
8Tender for construction of reinforced cement concrete pavement and miscellaneous works Details
8Tender for renovation and retrofitting of electrical substation Details
8Tender for civil works for development of existing cluster well Details
8Hiring of services for repair and maintenance of submersible pumps Details
8Supply, erection, testing and commissioning of new ALDS Details

You can also click on Tenders for more
For reference purposes the website carries here the following Newsclips (These are public domain newsclips and the website is not responsible for their content):
8What makes India a hotspot for sustainable aviation fuel production? Details
8Biofuel units to be set up in Assam to process plastic waste: Sarma Details
8Ponda underpass work resumes after gas pipeline shift Details
8Five held for illegal LPG siphoning at Seraulim Details
8Power-hungry AI firms spur return of dirtier gas turbines Details
8TotalEnergies on trial in landmark greenwashing case in France Details
8India gas price index jumps 19% in May Details
8Maritime PowerUp: India and Norway join forces to strengthen green maritime future with electric ferries Details
8Delhi-NCR to bar new petrol, diesel vehicles for commercial fleets from January 2026 Details
8Cabinet nod to 4 Badri projects; tax rebate for CNG, EV vehicles Details
8CGD to drive India's gas demand, set to become biggest consumer Details
8India increases appetite for West African crude Details
8Indian oil marketing companies to raise ethanol procurement order to 1,050 crore litres Details
8India needs 6,900 acres land, $9 bn EV infra investment by 2030: report Details
8US sanctions on Russian oil expose India’s energy risks Details
8Auto LPG could cut 40 percent of vehicle pollution in India, details inside Details
8Assam to team up with Oil India to turn trash into biofuel in five cities Details
8Only CNG, EV three-wheelers, LCVs to be inducted by aggregators and delivery firms in NCR from Jan 2026 Details
8PNGRB urges shift to electric motor-driven compressors across 25,429-km gas pipeline network Details
8CMD Vartika Shukla leads EIL senior leadership in strategic discussion on performance & future vision Details
8ONGC claims about losing money due to low production cost in Assam Details
8Essar Future Energy proposes 1 MMTPA greenfield biofuel complex in Gujarat Details
8Paraguay to build $150 million biofuel plant with India’s Praj Industries Details
8Delhi goes green: only clean-fuel fleets allowed from 2026! Details
8Businessman loses Rs 21 lakh in petrol pump dealership fraud; 2 booked Details
8ADNOC drilling delivers record 2024 results Details
8IEA sees 2025 energy investment hitting $3.3 trillion Details
8Russia keeps oil production below OPEC+ quota Details
8Sustainable aviation fuel faces uphill battle to become mainstream Details
8Cairn Oil & Gas expands green cover to 4,000 acres, cuts emissions by 312,000 tonnes Details
8India may buy more shale gas, LNG, crude oil from US: official Details
8Oil India’s subsidiary to build major aviation fuel plant in Odisha under expansion push Details
You can also click on Newsclips formore Details
8Here's what's happening today in the E&P, midstream-downstream, and CGD section
Click on Reports for more Details Details
It is easy to get month-old import data but it is difficult to solicit forthcoming shipment information in India. We go through a laborious process of data collection to get you full import information, including company-wise, quantity-wise, port-wise, vessel-wise cargoes which are coming into India in the next 15-to30 days.
Get the daily updates for :
8LNG
8Crude
8Chemicals
8Fertilizers
8Coal and Coke
8LPG
8Ammonia
8All tankers
8Bulk and Dry cargo
Click on Reports for more. Details
8Project Name: Burdwan District City Gas Distribution
8Project Cost: Rs 350 crore Click here for more details Details
8Project Name: Dharwad District City Gas Distribution
8Project Cost: Rs 350 crore Click here for more details Details
No price variation clause flagged in ONGC civil contract: Are bidders flying blind on escalation?
8In a three-year contract horizon, lack of escalation triggers may strain margins amid rising construction inputs.
Contractors may face working capital mismatches if material cost spikes are not covered in special conditions or future corrigenda.
ONGC pushes digital frontier with mandatory HOCU telemetry and app-based logging
8Real-time monitoring isn’t just encouraged—it’s mandatory.
8ONGC’s latest Hot Oil Coil tender compels cloud-based control systems with app access, setting a new precedent in service-level billing compliance.
8Even tankers face a two-year vintage cap. This aggressive clause shrinks eligible inventory, forcing many contractors to reinvest or lease afresh.
8Burner shutoffs, flow sensors, and flame detection systems are now mandatory. But absence of failure penalties could dilute the enforcement incentive.
10-day response window opens for Mangala shutdown EOI — but with no job calendar in sight
8Contractors are expected to mobilize credentials fast, but the absence of dates, durations, or volumes clouds risk estimation and partner onboarding.
8High-volume equipment specs are laid down, but contractors have no clarity on number of vessels or phases, making costing a blindfold act.
8The high bar for pre-qualification fits Vedanta’s recent drive to centralize vendor benchmarking and reduce post-award change orders.
Halliburton runs away with Rs 816 cr E&P tender: Raises eyebrows
8Switch to full-scope evaluation and standby obligations favored Halliburton’s bundled strategy.
8With award price over Rs 816 crore vs EMD-derived budget of Rs 1.79 crore, either scope creep or budget underassessment needs probing.
Price gap hits 487% in ONGC oil analysis tender
8This ONGC’s transformer oil analysis contract with a sharply optimized bid, has left higher quotes trailing by up to 6x
8This hints at bid calibration issues or margin overestimation by rivals.
Two bidders knocked out in ONGC’s ETP tender as eligibility tightens, O&M risks shift fully to vendor
8Despite service-centric tendering for Assam ETP units, two bidders failed to make the cut due to strict compliance and PQ norms. O&M cost and readiness risks lie squarely on the contractor, with no leeway granted on deployment flexibility.
OIL’s rig charter tender sees 6 extensions amid bidder clarifications
8Oil India’s 6-year tender for brand-new 2000 HP rigs has been extended repeatedly—from March to late June 2025—as vendors awaited final technical clarifications and aligned logistics for deep drilling assets.
8The delay hints at high capex sensitivity, possible vendor capacity gaps, or misalignment in scope and execution risk.
8Vendors are struggling with new build rig timelines, import dependencies, and back-to-back contracts. The six-year term may not be enough to hedge risk 
Click on Details for more
Details
Despite authorizations touching 34,233 km, only 25,429 km of gas pipelines are operational. Regulatory data shows delays and ground-level deviations slowing India’s gas grid rollout.
8While common carrier lines form the bulk of India’s network, over 780 km are now dedicated lines, quietly catering to captive and commercial users through tailored gas delivery.
8Projects like the Mehsana–Bathinda (GIGL) and Mallavaram–Bhopal–Vijaipur (GITL) pipelines remain incomplete 14 years after authorization. A deeper crisis of execution may be at play
8With 565 km operational and 550 km under construction, sub-transmission networks remain a weak link—especially in northern and eastern India, where CGD support infrastructure is still minimal.
8At least five under-construction tie-ins are now dedicated to LNG evacuation from emerging terminals like Swan, Karaikal, and Petronet expansion zones—indicating a private LNG-led build-out push.
8The flagship GAIL-led Kochi-Koottanad-Bangalore-Mangalore and Dabhol-Bangalore trunk pipelines continue to miss targets, with large under-construction stretches remaining in Kerala and Karnataka.
Operational and dedicated gas pipeline listings show surprising new entrants—Torrent Gas, DFPCL, and even Maharaj Soaps—pushing private gas logistics at select industrial sites
Click on Details for more Details
A private homegrown chemical company is on a Rs 3500 crore investment foray
8Surely oil & gas PMCs and EPCs will be interested?
Click on Details for more Details
This private E&P company raises Rs 500 crore
8This is for a a multi-field, multi-basin ramp-up backed by development plans, PMLs, ECs, and strategic infrastructure.  Details
8Density range tightening may force bidders to revisit bulk handling systems.
8Downstream equipment like prilling towers and silos may now face load recalculations.
8Another change imposes E3D/PDMS usage with strict geometry classification. Lack of model validation protocol, however, could still leave room for interpretation.
8New declaration forms issued for domestic steel use may trigger sourcing realignment for bidders using imported alloys.
8With tiered 3D accuracy mandates and software specifications, PDIL seems to be steering LSTK-4 into post-construction digital integration era.
8Four technical/commercial updates in under 10 days point to a deliberate mid-cycle reset—possibly due to internal design revalidation.
Click on Details for more
Details
8New design philosophy clauses mandate AVEVA E3D or PDMS with 3D model-driven GA drawings and clash checks.
8Plot rearrangement swaps cooling tower and ETP pond locations, changes RWTP size, and color codes LSTK-specific road scopes. Yet tie-in points remain unfrozen — leaving layout fluidity unresolved .
8Despite repeated bidder queries on whether flare systems will be shared or standalone, PMC’s response remains ambiguous. A vital integration decision is still deferred .
8New bidder declaration formats for domestic value addition shifts risk of compliance verification to contractor.
8New scope also raises precision and workload expectations for engineering teams.
Click on Details for more
Details
8Aggressive undercutting had dragged rates down to an abysmal $35,000/day
8But the company says this was an anomaly and expects recovery in upcoming ONGC tenders
Find out what kind of rates the company expects Details
Shell does not want to be left behind when it comes to a deal with ONGC
8What kind of prices can we expect?
8It is angling for a similar deal as BP
Find out more Details
Jackup rig tender just around the corner
8What kind of prices can we expect?
Click on Details for more Details
The interviews are still to take place
8But Ranjit Rath seems all ready to step into Arun Kumar Singh's shoes
Click on Details for more  Details
8Find out how that price was arrived at
Click on Details for more Details
Multi-location bio-CBG feasibility tender signals BPCL’s aggressive MSW–biomass hybrid push
8BPCL’s latest feasibility tender pegs a 2-month deadline per site and bars scope splitting — a tight timeline for dual-feedstock analysis.
8MSEs get qualification relaxations, but non-divisibility raises entry barriers.
8The simultaneous focus on agri-residue and partially segregated MSW hints at integration readiness with India’s twin bio-CNG and waste management missions.
Methane Margin Relaxed, PTR Deadline Deferred: BPCL Loosens CBG Tender Specs Amid Bidder Pushback
8BPCL has diluted methane purity enforcement and extended PTR submissions post-award for its Bina CBG plant tender.
8A string of efficiency caps and tech flexibilities signal pressure to attract broader participation, but also flag execution-stage risks.
8Several tech relaxations traceable to Praj Systems’ queries — a rare instance of vendor-led reshaping of a refinery-zone EPCOM.
Click on Details for more
Details
Compressor Package Put Under Lens Ahead Of BPREP Tender Launch
8Early scrutiny of decoking air compressor specs signals BPCL’s risk-mitigation push as timeline pressure mounts on Bina petrochemicals expansion.
8By fixing high-end API compliance upfront, EIL is signaling zero compromise on compressor integrity for the cracking unit’s most volatile duty.
8Breaking out the air compressor as a dedicated package — ahead of larger rotating equipment — reflects the project’s interdependency on clean decoke cycles.
8Detaching the air compressor from broader decoke system or cracking package may complicate interface coordination — unless addressed in the full bid.
Six deadline extensions and scope clarifications expose bidder unease in Kochi Refinery’s digital tower tender
8Despite a well-structured SaaS mandate for BPCL Kochi’s Control Tower and Common Data Environment, the bid has seen six extensions and key scope rollbacks.
8Despite being a digital-first tender, the commercial criteria seem rooted in legacy EPC-style thresholds — a mismatch for tech disruptors.
8The mandate to host on MeitY-approved platforms may eliminate capable vendors without government cloud tie-ins, shrinking the competitive field.
8A closer look reveals structural complexity, restrictive BQC clauses, and unexpected reversals on cyber-integration requirements
Ethylene tank package: Revised DWST specs signal tighter safety, smarter design for Bina cracker
8A flood of technical amendments, including updated trip logic and SMED additions, reshapes the ethylene tank package for BPCL’s BPREP project
8But bidders face compressed timelines to realign compliance.
8While the preferred vendor list remains intact, newly issued compliance templates for local panels, alarm circuits, and trip interlocks raise the bar for qualification.
8While the deadline moves to June 9, a barrage of document changes behind the scenes reflects last-minute finalization of key project assumptions.
BIO-ATF pump: Repeated bid due date extensions suggest that spec finalization post pre-bid delayed bidder readiness
8Bidders flagged multiple cases where mechanical datasheets contradicted process values—a sign of rushed pre-bid documentation.
8While material flexibility was granted, repeated vendor requests for downstream pressure leniency were flatly denied
8Utility requirements—vital for integration—were absent initially and only added in TA-02, raising questions about coordination with system designers.
Licensor rush for methyl amines hits pause: NRL extends EOI deadline twice
8The EOI timeline for NRL’s methyl amine unit has now been extended twice—suggesting either tepid global interest or compliance hurdles for technology licensors.
8The move hints at NRL/EIL’s willingness to accommodate but also exposes India’s digital procurement friction points.
8Also, high specialization of methyl amine technology may be limiting bidder pool despite project scale.
IOCL cancels high-profile HDD tender amid speculated bidder pushback and project reprioritization
8The cancellation of IOCL’s 36” OD pipeline HDD tender under the New Mundra-Panipat Pipeline project raises questions around bidder readiness, qualification hurdles, and possible internal realignment—hinting at deeper shifts in IOCL’s execution strategy.
8There is speculation that the two-rig deployment rule may have narrowed bidder base, prompting withdrawal.
8With large-diameter trenchless scope across rail and highways, IOCL’s move hints at timeline re-sequencing or bid re-scoping
Click on Details for more
Details
‹ First  < 4 5 6 7 8 > 

Showing 251–300 of 354 items