All content in this website is sourced legitimately

Archives


All the news items since the launch of our web site are preserved in the archive section. The archive entries are freely accessible to all the users.


May 2022

8Demand has been found for around 100000 cubic metres per day of stranded gas
Click on Details for more Details
Last time around, Vijay Tanks was the L-2 bidder for a sum of a little over Rs 100 crore
8But the bid was rejected as being much above the reserve price.
8What has happened in the interim is that prices of steel have gone up, and the L-1 price quoted by Vijay Tanks will not hold now, and the price will be much higher.
8From what we gathered from the industry, it does not look like this time around they will find a bidder at all.
Click on Details for more Details
For reference purposes the website carries here the following tenders:
8
Services Required for Inhouse Fabrication of Cryovessels Details
8Supply of Spares of Stepless System Details
8Design, engineering, manufacturing, packaging, testing, supply and supervision of erection, commissioning & field trial run testing of the following Electric Motor driven Centrifugal Horizontal Multi-Stage Pum Package Details
8Supply of Pump Spares Details
8Supply of Mechanical Seal Spares Details
8Supply, Installation and Commissioning of Inkjet Printers Details
8Supply of Modified Burner and Igniter Assembly for CDU Heater 01-C-01A Details
8Procurement of TPS Boiler Spares Details
8AMC of Tankages PO-FR Details
8Development for PE PNG Project Works Details
8Supply of Commercial Regulators for CGD Project Details
8Consultant for Detailed Project Feasibilty Report (DPR) Details
8Supply of Scraper Traps & Pig Signallers Details
8Providing Consultancy Services for Architectural, Interior and Similar Allied Works Details
8Replacement of Reformer Catalyst Tubes of Hydrogen Details
8EOI for Service of Consultancy from Reputed Consultant for Conversion of Overground Pipeline Crossings Details
8Soft Soap Barrels for Lubrication Of Conveyor Chain Details
8EOI for Catering, Housekeeping, and Multiple Facility Management Services Details
8Supply of Hydrogen Gas Cylinders Details
8Supply of Scallop Assemble for Reactors Details
8Supply Installation of ARV PCV Butterfly Valve MOV Details
8Transportation of Packed Lube Oil Greasesdditives DEF Details

You can also click on Tenders for more
For reference purposes the website carries here the following reports:
8Monthly Production Report April, 2022 Details
8Order: In the matter of AGP CGD India Private Limited Vs. Torrent Gas Chennai Private Limited [PNGRB] Details
8Order: In the matter of Gujarat Gas Limited Vs Saint Gobain India Pvt. Ltd. [PNGRB] Details
8Order: In the matter of M/s AGP CGD India Private Ltd. Ors. (Review Petition) [PNGRB] Details
8Order: In the matter of Bhagyanagar Gas Limited Vs. Oil and Natural Gas Corporation Limited & Ors. [PNGRB] Details
8ONGC, India’s Largest Producer Becomes First to Trade Domestic Gas on IGX [IGX] Details
8Disclosure Of Related Party Transactions Pursuant To Regulation 23(9)[MGL] Details
8Details of Loss of Certificate / Duplicate Certificate [RIL] Details
8Announcement under Regulation 30 (LODR)-Analyst / Investor Meet [GAIL] Details
8Announcement under Regulation 30 (LODR)-Newspaper Publication [IOCL] Details
You can also click on Reports for more
For reference purposes the website carries here the following Newsclips:
8
More industrial clusters join WEF's net-zero transition initiative Details
8Germany sees Russian oil embargo agreement in a 'few days' Details
8Russian gas flows through Ukraine rise Details
8Rising fuel costs, expensive EVs making CNG a welcome relief, alternate fuel for mobility: Report Details
8Nayara fuel dealers to meet Mgmt today Details
8EU, United States pushing for global fuel production increase: Scholz Details
8Crisis-hit Sri Lanka planning to study on oil exploration in Mannar Basin: Minister Details
8The National Monetisation Pipeline - Roadmap for India’s Growth Details
812 Indian firms at higher risk of downgrade amid rising inflation: Fitch Details
8US Treasury official heads to India to discuss Russian oil purchases Details
8The Natural Gas Sector in India: Cost of price controls Details
8Oil at $110 a barrel not sustainable, says Hardeep Puri at WEF Davos Details
8India's crude oil production falls 1% in April Details
8Two projects in India to feature polymer flooding EOR Details
8India's crude oil production drops 0.95% to 2469.67TMT in April Details
8Indian Oil appoints new executive director for TN, Puducherry Details
8Indian April crude processing rises as cheap Russia oil boosts returns Details
8Woodside expects LNG prices to remain high for next few years Details
8Argentina to ease exchange control for oil and gas companies Details
8Digital technologies can reduce emissions by up to 20 pc: WEF study Details
8Oil, gas firms use Ukraine war to resist climate efforts Details
 You can also click on Newsclips for more   Details
After sharp increases in gas prices linked to LNG prices, gas prices are likely to fall in the Morbi industrial cluster
8But there are other problems that this ceramic cluster seem to face
Click on Details for more Details
8Project Name: Jagtial, Peddapalle, Karimnagar & Rajanna Sircilla Districts City Gas Distribution
8Project Cost: Rs 300 crore
Click here for more details. Details
8Project Name: Ashoknagar District City Gas Distribution
8Project Cost: Rs 350 crore.
Click here for more details. Details
 Ammonia-Urea Brownfield Project
8
Cost: 6000 Cr.
8Project EventThe RFQ for the Cooling Tower as well as Cooling Water Treatment Package has been out and bid due date is 6 June 2022. The bid due date has been extended from 17 May to 30 May 2022 for the Supply, Installation & Testing of the Flare System. The Tender for Instrument Air & Plant Air System has been canceled due to higher price quoted by the L1 bidder than the estimated cost, The L1 bidder was Linde. BTL EPC, Macawber Beekay & Tata Project are in the race for the supply of Urea handling & baggage packages on an LSTK basis, The technical bid opening is in progress.
Ammonia-Urea Brownfield Project
8Cost: 6500 Cr.
8Project Event: RFQ for the sheeting cladding in wagon loading platform has been out and bid due date is 3 June 2022. 96 % of construction work has been completed, and the equipment installation is ongoing. Procurement of machinery orders are already completed, procurement of other services is ongoing, also pre-commissioning is ongoing, Commercial production is likely to be started from September in place of June 2022, due to delay in the construction. Details
People have started talking about renewable ammonia seriously now
8What are the cost curves for renewable ammonia?
8How far away is it from being viable in countries like India?
Click on Reports for more Details
BHEL had tried to make a splash in the downstream EPC business.
8So what is the status now?
Click on Details for more Details
Get the daily updates for
8LNG
8
Crude

8Chemicals
8LPG
8Ammonia
8All tankers
8Bulk and Dry cargo
8Port Update
Click on Reports for more Details
8Drilling contractor fails to deliver on time to ONGC.
8Is the government more than the supplier to blame?
Click on Details for more Details
This third-generation technology driven bio-refinery project saw a cost escalation to a mind boggling Rs 3000 crore
8Cost-economics has gone for a complete six. No one is talking about IRR anymore, it seems
8Will this be the last such new-tech bio-refineries to be built?
Click on Details for more Details
8There are two projects in the world that claim to produce hydrogen production with CCS. They both produce hydrogen with fossil gas
8Both projects emit significantly more emissions than it sequesters
8Clearly this is the end of the road for clean hydrogen from fossil fuels
Click on Report for more Details
span style="font-style: normal; font-weight: 400; letter-spacing: normal; text-align: start; text-indent: 0px; text-transform: none; white-space: normal; word-spacing: 0px; color: #ff0000; font-family: Webdings; font-size: small;">8Project Name: Rewa District City Gas Distribution
8Project Cost: Rs 300 crore.
Click here for more details. Details
8Project Name: Salem District City Gas Distribution
8Project Cost: Rs 300 crore.
Click here for more details. Details
Get the daily updates for
8LNG
8
Crude

8Chemicals
8Fertilizers
8Weekly Fertilizers
8LPG
8Ammonia
8All tankers
8Bulk and Dry cargo
8Port Update
Click on Reports for more Details
Ammonia-Urea Brownfield Project
8Cost: 6500 Cr.
8Project Event96 % of construction work has been completed, and the equipment installation is ongoing. procurement Machinery orders are already completed, procurement of other services is ongoing, also pre-commissioning is ongoing, Commercial production is likely to be started from September in place of June 2022, due to delay in the construction. (But our in-house research team disagrees with this commissioning date set by our  analyst, who elicited the company version)
Phosphoric Acid Expansion Project
8Cost1100 Cr.
8Project Event: 97% of construction work has been completed. The construction has been started in February 2020. The Company has been selected Jacob as the EPCM contractor, The commission is likely to be completed in June 2022 in place of March 2022.
Click on Details for more.
Details
This is a 12,000 crore greenfield thermal power plant
8Many contractors were involved, it is nearing commissioning
8But some RFQs are still left
Rs 3000 crore greenfield hydroelectric project
8RFQ for the drilling and drifting works is likely to float in July 2022.
8Get key contacts here
Rs 4000 crore greenfield Pump Storage Project
8Tender package preparation work is ongoing
8RFQ for the PMC package is likely to be floated in Q3 2022.
220 kV D/C  Transmission Line
8RFQ for the 220 kV P/S package is likely to be floated in June 2022.
Get in touch with us for more
Details
For reference purposes the website carries here the following tenders:
8Construction of Library Building Details
8Replacement of Turnstiles and FRP in Honeywell Make Access Control System Details
8Recertification of Emergency Response and Disaster Management Plan (ERDMP) Details
8Supply of Installation, Commissioning and Comprehensive AMC of Fire Alarm/ Smoke Detector System Details
8Procurement of Spares for Sulzer Make Pumps Details
8Supply of Butterfly Control & On-Off Valves Details
8Contract for Weeds Control, Jungle Cutting and Other Area Cleaning Jobs Details
8Hiring Services to Carry out Geotechnical Investigation Details
8Empanelment of Vendors for Liquid Nitrog Details
8ARC for Procurement of Welding Blanket Details
8Hiring of Services for IDAS with AMC MH Details
8Supply of Coated Seamless and Welded Pipes Details
8Supply of Valves Gate ,Globe, Check Cast and Forged Details
8Spares of Ensival Moret Pumps Details
8Supply of Electronics Part of 24 inch IPIG Along with Complete Assembling of IPIG Details
8Supply of Mechanical Part of 24 inch IPIG Details
8Supply of Dry Type Lighting Transformers Details
8Supply of Feed Filter Bank Details
8Pump-Centrifugal Horizontal / Vertical (Molten Sulphur) Details
8Tender of Being Floated for the Purpose of Carrying out Electrical Operation and Maintenance Services Details
8Laying Construction of Steel Pipeline Details
8Tender for Lube Warehouse Details

You can also click on Tenders for more
For reference purposes the website carries here the following reports:
8Order: In the matter of Mahanagar Gas Ltd. Vs. GAIL & Ors. (Remanded back from APTEL in appeal no. 110 of 2021)[PNGRB] Details
8Announcement under Regulation 30 (LODR)-Analyst / Investor Meet - Outcome [IEX] Details
8Submission Of The Offer Opening Advertisement Pertaining To The Buy-Back [GAIL] Details
8Announcement under Regulation 30 (LODR)-Analyst / Investor Meet - Intimation [GAIL] Details
8Announcement under Regulation 30 (LODR)-Press Release [GAIL] Details
8Annual Secretarial Compliance Reports [Selan] Details
8Board Meeting Intimation for Consideration Of The Audited Standalone And Consolidated Financial Results [HOEC] Details
8Details of Loss of Certificate / Duplicate Certificate [HPCL] Details
8Shareholder Meeting / Postal Ballot-Notice of Postal Ballot [IOCL] Details
8Details of Loss of Certificate / Duplicate Certificate [IOCL] Details
You can also click on Reports for more
For reference purposes the website carries here the following Newsclips:
8
Argentina oil and gas watch Details
8Poland Says Norway Should Share Its “Gigantic” Oil & Gas Profits Details
8Mumbai: Fuel prices go down, but hopes up for a further fall Details
8Aramco CEO warns of global oil crunch due to lack of investment Details
8Amidst excise duty cut, reduction in state tax on petrol, oil cos hiked its base price: Kerala Finance Minister Details
8How to calculate the price of LPG cylinder in India Details
8Oil extends four weeks of gains amid tight supply Details
8Oil prices at $110/bbl pose 'bigger threats' than inflation: Hardeep Singh Puri Details
8IOC, HPCL and BPCL free to set their own fuel prices, says India's oil minister Details
8Billionaires Adani, Ambani at a turning point in their rivalry in India Details
8ONGC becomes 1st gas producer to trade on IGX Details
8ONGC starts trading on Indian Gas Exchange Details
8Russia wants to set up joint oil and gas refineries with BRICS countries Details
8Govt needs to clarify whether it wants oil price control or exports Details
8Petrol under-recovery at Rs 13, diesel Rs 24; Reliance-BP says operations unsustainable Details
8Oil and Gas shares slide Details
8Why are oil stocks ONGC, HPCL, Reliance, GAIL BPCL under pressure today? Details
8Hunt for a private sector captain to run ONGC begins Details
 You can also click on Newsclips for more   Details
A large thermal plant is under completion.
8Get the list of contractors here
Also, RFQ for the DeNOx system package is ahead.
Rs 2000 crore Greenfield Pumped Storage Project
8Get the latest status update
8RFQ for the drilling and drifting work is likely to be floated soon.
Rs 900 crore Greenfield Hydroelectric Project
8Get key contacts here, also check when the RFQ for the Civil works package is likely to be floated.
Transmission line
8RFQ for the 220 kV P/S works package is likely to be floated in Q3 2022
Get in touch with us for more
Details
The CGD industry, which is supposedly to see more investments than any other  segment in the oil & gas sector, is in a churn.
8Find out why there is now an increasing divide between new and old players in the busienss.
8Also, there are new policy formulations that are being talked about, all of which are likely to be adversarial to the industry.
8Putting in money in CGD today is possibly more risky than any other segments of the economy.
Click on Details for more Details
This LPG import expansion project is worth Rs 453 crore
8Get the list of contractors here
Click on Details for more
Details
Get the latest update on the Kandla Brownfield LPG Import Terminal Expansion Project
8It is a Rs 720c crore project
Get a complete update here
Details
Dhamra- Angul Greenfield Gas Pipeline Project
8Not that the Dhamra terminal is getting ready, find out on on the status of this pipeline
Click on Details for more Details
8It is learned that bids have come in for all packages for the Haldia Petrochemical's Cuddalore plant
Click on Details for more.
Details
8Project Name: Guna District City Gas Distribution
8Project Cost: Rs 300 crore.
Click here for more details. Details
8Project Name: Coimbatore District City Gas Distribution
8Project Cost: Rs 300 crore.
Click here for more details. Details
Ammonia Greenfield Project
8Cost: 2773 Cr.
8Project EventThe proposal for the environmental clearance is likely to be submitted in Q2 FY 2022-2023. The RFQ for the contractor is likely to be released in Q2 FY 2022-2023.
Ammonia-Urea Energy Saving Project
8Cost: 380 Cr.
8Project Event: The PDP development is still ongoing and expected to be received by the end of July 2022, RFQ for the LSTK contractor is likely to be re-released in July 2022. Accordingly, the services of M/s CASALE had been engaged to carry out the Process Design Package (PDP) for the ESP schemes and their integration. However, due to financial liquidity issues faced by the Company, the PDP development had not proceeded as envisaged but was resumed through the commencement of the Kick-off Meeting in December-2020. Details
For reference purposes the website carries here the following tenders:
8
Procurement of Assorted Pipes Details
8Procurement of Flanges and Fittings Details
8Tender for Engineering Supply Erection and Construction of Porta Cabin Pebbid Details
8Procurement of Refractory Castable Material and Refractory Bricks Details
8Letter Writing, Making Emblem Signage, Direction Marking on Structure, Walls, Piping, Equipment Under HBPL, PSHPL and PHDPL Loop-Line Project Details
8Procurement of Kone Crane Spares Details
8Rectification, Testing and Refurbishment of Regeneration Gas Heaters Details
8Procurement of Kone Elevator Spares Details
8Contract for Security and Allied Services Details
8Procurement of Gland Packings Details
8Construction of New AFS Details
8Provision of Car Details
8Impact Assessment Analysis of DHDT, BGR Details
8Provision of 1 No Additional 20 kl UG ATF tank 1 Standby 10 HP Pump and Additional ATF Pressurized Underwing Fuelling Point Details
8Hazop and QRA Study of SRPL Details
8Tender of Being Floated for the Purpose of Carrying out Electrical Operation and Maintenance Services Details
8Hiring of HCVs for Transportation of Compressed Biogas Through Mobile Cascades from CBG Plant Details
8Supply of 400 SCMH Booster Compressor Package Details
8Annual Maintenance Contract for Maintenance of Forbes Marshall make Analyzers Installed Details
8Design Manufacture Testing Details
8Rate Contract for Heat Exchangers Overhauling Jobs in CRU-MSQ, DHDT, BS-VI and INDMAX Units Details
8Supply of Spares of Battery Cells Details
8Tender for Procurement of Line Pipe Details
8Tender for Procurement of Valve Pipeline Details
8Tender for Procurement of Assorted Valves Stations Details

You can also click on Tenders for more
For reference purposes the website carries here the following reports:
8Crew carrying helicopter services are needed Details
8Hydrogen costs: Fresh calculations available Details
8New Offshore rig contract awarded. Details
8This agency prepares a monthly update on the Indian oil & gas sector Details
8Cyclone Tauktae had wrecked havoc in ONGC's offshore infrastructure Details
8There is a senior job availability coming up but will anyone be interested? Details
8India's emission control efforts in the transportation has gone nowhere. In fact, emissions are likely to go up Details
8Fresh LNG capacity is incompatible with a 1.5 to 2 degree warming target. Details
8Here is an interesting take on how this time around the energy crisis is of a different and far more dangerous nature than ever before. Details
8There is a seismic services company that has decided to sell out Details
8Some oil & gas vendors are not doing all that well Details
8LNG: Another new terminal coming up Details
8Annual Secretarial Compliance Reports [Aegis] Details
8Corporate Action-Board to consider Dividend [Aegis] Details
8Intimation Pursuant To Regulation 30 Of Securities And Exchange Board Of India [Aegis] Details
8Submission Under Regulation 23(9) Of Securities And Exchange Board Of India [GGL] Details
8Board to consider FY22 results & Dividend on May 27, 2022 [CP] Details
8The Meeting Of Board Of Directors To Be Held On 27Th MAY,2022 [CP] Details
8Compliance Under Regulation 23(9) Of The Securities And Exchange Board Of India [RIL] Details
8Details of Loss of Certificate / Duplicate Certificate [RIL] Details
8Announcement under Regulation 30 (LODR)-Analyst / Investor Meet [Petronet] Details
8Details of Loss of Certificate / Duplicate Certificate [Vedanta] Details
8Order: In the matter of Torrent Gas Pvt. Ltd. & Ors (Review Petition) [PNGRB] Details
8Order: In the matter of M/s Torrent Gas Pvt. Ltd. & Ors Vs. Bhagyanagar Gas Limited [PNGRB] Details
8Announcement under Regulation 30 (LODR)-Acquisition [Swan Energy] Details
8Board Meeting Outcome for Acquisition [Swan Energy] Details
8Announcement under Regulation 30 (LODR)-Analyst / Investor Meet [IEX] Details
8Board Meeting Intimation for Consideration And Approval Of Standalone & Consolidated Audited Financial Results [GNRL] Details
8Intimation Of Postponement Of Conference Call [HPCL] Details
You can also click on Reports for more
For reference purposes the website carries here the following Newsclips:
8
Average US gasoline price jumps 33 cents to USD 4.71 per gallon Details
8BMW exploring energy investments to reduce dependence on natural gas Details
8Rajasthan has costliest petrol and diesel in country, says Union minister Gajendra Singh Shekhawat Details
8India’s ONGC eyes more Russian oil and gas assets Details
8Fuel delivery will be suspended if transporters are threatened, Sri Lankan minister warns Details
8Excise duty cut: Petrol price slashed by Rs 8.69/litre, diesel by Rs 7.05/litre Details
8Fuel a long-term strategy for oil now Details
8Fuel price cut big relief, but more needs to be done to stall stagflation Details
8Stock market update: FMCG stocks up as market rises Details
8LPG Cylinder Subsidy Announced: Who Will Get it, How Much Will You Get; Know Latest Price Details
8India sends relief supplies to crisis-hit Sri Lanka Details
8Lucknow: Indian Oil introduces 5 kg 'Chhotu' door-to-door gas cylinder service Details
8India to have several gigawatts of green hydrogen electrolyser capacity in 5 yrs: Rajiv Menon, Black & Veatch Details
8Demand side needs to be addressed in phase-II of hydrogen policy: Hetal Gandhi, CRISIL Research Details
8Fuel Prices Fall Across Metros After Excise Duty Cut Details
8India mulls $13 billion extra borrowing to offset fuel-tax cut Details
8Pakistan's former PM Imran Khan again praises India for buying discounted oil from Russia Details
8Natural gas supply reaches Bathinda refinery Details
8ONGC repairs damage Cyclone Tauktae caused to offshore installations Details
8Deliberate OPEC-plus actions keeping oil on the boil Details
8Swan Energy acquires majority stake in Veritas India Details
 You can also click on Newsclips for more   Details
8For some vendors and suppliers involved in the oil & gas industry, the going is doing is not easy. Here is a speciality chemical supplier for the oil & gas company in trouble. Click on Reports for more
8Also, there is a seismic services company that has decided to sell out. Click on Reports for more
8Here is an interesting take on how this time around the energy crisis is of a different and far more dangerous nature than ever before. Click on Reports for more
8Fresh LNG capacity is incompatible with a 1.5 to 2 degree warming target. There are some compulsive arguments which have been thrown up. Click on Reports for more
8India's emission control efforts in the transportation has gone nowhere. In fact, emissions are likely to go up
dramatically without policy interventions. Click on Reports for more
8There is a senior job availability coming up but will anyone be interested? Click on Reports for more.
8Cyclone Tauktae had wrecked havoc in ONGC's offshore infrastructure. And it has taken a long time for the company to repair the damage. Click on Reports for more
8This agency prepares a monthly update on the Indian oil & gas sector, and it is quite comprehensive, and it is worth going through. Click on Reports for more
8Crew carrying helicopter services are needed. Click on Reports for more.
8New Offshore rig contract awarded. Click on Reports for more Details
There are some very interesting fresh projections on renewable energy costs going forward, right up to the year 2050
8Then there is the levelized cost of solar and wind-produced hydrogen.
8This is global data but find out where India stands in all this
Click on Reports for more Details
8LNG terminal capacity is low, and some of the new terminals are struggling to get off the ground on lack of deemand
8Yet this players is planning a new 5 MMTPA LNG terminal.
8And plants are at an advanced stage,, and RFQs are out
Click on Reports for more Details
Brownfield thermal power plant
8Find out who the other contractors are
8RFQ for the C&I system package is likely to be floated in July 2022.
Rs 5100 crore greenfield hydroelectric project
8RFQ for the EPC package for civil and HM works is likely to be floated in Q3 2022.
Construction of 400 kV Quad D/C Transmission Line
8RFQ for the P/S package is likely to be floated in July 2022.
 Rs 1580.38 crore hydroelectric project
8RFQ for the drilling and drifting works is likely to be floated in June 2022.
Brownfield thermal power plant
8Find out who the other contractors are
8RFQ for the C&I system package is likely to be floated in July 2022. Details
8There is another nearly 1 mmscmd of gas coming in from a new E&P player
8Tenders are expected to be out soon.   Details
This LNG terminal is going to be ready within the the next few months.
8It will be ready to receive gas and will also be able to transmit gas better than terminals which were set up before it
8Pressureis  now on PSUs who have signed take or pay obligations to ensure that the gas is offloaded, or they will have to pay penalties.
Click on Details for more Details
Ammonia-Urea Expansion Project
8Cost: 150 Cr.
8Project EventThe company is still waiting for approval for the loan. The project has elicited environmental clearance in Jan 2020. RFQ for the EPC contractor is likely to be released in Q2 FY 2022-2023 due to delay in the internal discussion.
Sulphuric Acid and Captive Power Unit Expansion Project
8Cost: 300 Cr.
8Project Event: The project is still awaiting environmental clearance, Public hearing has been completed. clearance is likely to be elicited in July 2022. Internal discussion is still ongoing. RFQ for the PMC contractor is likely to be released in Q2 FY 2022-2023. Details
8Find out more about this company which forced the PNGRB to retract on one of its decisions
Click on Details for more Details
For reference purposes the website carries here the following tenders:
8
Supply of Reformer Catalyst Tube Assembly Details
8Fabrication of Lighting Towers for Area Illumination Details
8Supply of 500 MT of Diesel Lubricity Additive (DLA) Details
8Supply of Odourant Package Details
8Sundyne make Pump Spares Details
8Tender for Providing Industrial Canteen Services Details
8Supply of Heat Exchangers Las Details
8Supply of Lube Oil Filters Details
8Providing services as QCA for compliance to Forecasting Scheduling & Deviation Settlement Mechanism Details
8Expert Services of M/s Hoerbiger India PVT LTD for Calibration, Troubleshooting and Maintenance Service Details
8Procurement of RESCO Refractory Materials Details
8Providing Intelligence and Ancillary Activities in Pipeline ROW Details
8Line Pipe - Third Party Inspection Details
8Replacement of LSHFHSD Pipeline Details
8Supply of Nitrogen Cylinder Details
8Supply of Power Transformers Details
8Supply and Transportation of Structural Steels, Handrails, Ladders Details
8Supply of 11 KV HT Panel Details
8Procurement of Beacon Weir Pumps Spare Details
8Construction of Approach road, Plinth, Road Over Plinth, Construction of CC RCC Foundation to Suit S-3 (E-1400) Rig Details
8Tender for Inviting Applications to Enrol Existing Ethanol Plants who are Producing Ethanol or in the Process of Commencing Production in the Coming Months with All Necessary Approvals for Production & Storage of Ethanol Details

You can also click on Tenders for more
For reference purposes the website carries here the following reports:
8Daily import matrices Details
8Details of Loss of Certificate / Duplicate Certificate [OIL] Details
8Announcement under Regulation 30 (LODR)-Earnings Call Transcript [Petronet] Details
8Board Meeting Intimation for Audited Financial Results [GAIL] Details
8Annual Secretarial Compliance Reports [GAIL] Details
8Details of Loss of Certificate / Duplicate Certificate [BPCL] Details
8Corporate Action-Board approves Dividend [HPCL] Details
8Disclosures Of Related Party Transactions [HPCL] Details
8ppointment Of Secretarial Auditor For The Financial Year 2022-2023 [HPCL] Details
8Announcement under Regulation 30 (LODR)-Analyst / Investor Meet [HPCL] Details
8Order: In the matter of M/s Bagpat Green Energy Private Limited & Ors. (Review Petition) [PNGRB] Details
8Audited Financial Results For The Quarter And Year Ended 31St March [IOCL] Details
8Cabinet approves Amendments to the National Policy on Biofuels [MOPNG] Details
8Order: In the matter of AGP City Gas Private Limited and EICL Limited [PNGRB] Details
8Order: In the matter of Adani Total Gas Limited (Review Petition) [PNGRB] Details
8Outcome of the Board Meeting in terms of the Securities and Exchange Board of India [PIL] Details
You can also click on Reports for more
For reference purposes the website carries here the following Newsclips:
8
Indian Oil's shuttlers fuel India's historic Thomas Cup win Details
8Venezuela confirms US' decision to ease oil sanctions Details
8Sri Lanka cannot find cash to pay even one ship for petrol Details
8About half of Gazprom clients opened ruble accounts: Russia Details
8OPINION: High domestic LPG prices may pose a threat to India’s Clean Cooking Transition Details
8Italy PM says independence from Russian gas to take longer Details
8'Partial sale of government stake in BPCL may not work' Details
8Oil steady as economic worries offset possible China demand rise Details
8HPCL Q4 net drops 40 pc on losses due to holding fuel prices Details
8India will decide the global future of energy: Dr Andrew Light, US DOE Assistant Secretary for International Affairs Details
8Explained: Where the rupee is headed, and what its fall means to consumers, markets Details
8Petrol, diesel prices remain unchanged for 44 consecutive days. Check today's fuel rates here Details
8Siberian Federal University: SibFU Scholars: Simple Method To Clean Up Oil Wells Details
8India State-Owned Energy Firm Considers Raising Stakes In Russian Oil Fields Amid Ukraine Invasion Details
8Positive outlook for IGL on policy push, volume growth, cost pass through Details
8The Hypocrisy of the Opposition narrative on Fuel Prices Details
8Government in talks with Russia over cut-price oil deal: HPCL Details
8India to launch 20% ethanol-mixed gasoline: Why it's important and what are the challenges Details
8Indian oil companies mull bids for stakes in Russian energy assets vacated by Western companies Details
8Assam Police warns Oil India, ONGC of likely ULFA(I) attack Details
8India’s ONGC eyes more Russian oil and gas assets Details
 You can also click on Newsclips for more   Details
Get the daily updates for
8LNG
8
Crude

8Chemicals
8LPG
8Ammonia
8All tankers
8Bulk and Dry cargo
8Port Update
Click on Reports for more Details
8The PNGRB with its quorum in place is now a beehive for litigating parties.
Click on Reports for more
Details
8ONGC offshore rig tender has the usual contenders
Click on Details for more Details
This company seems to be facing serious problems with its offshore output
8And clients are angry
Click on Details for more Details
The PNGRB is a good place for many retiring executives to park themselves in as board members
8There is a lot of benefits, a statutory umbrella and high-impact decision making.
8There is no doubt therefore there are a lot of aspirants.
Click on Details for more Details
Rs 2500 crore multipurpose greenfield hydroelectric project
8EIA and EMP studies for this same project were completed but SIA studies are in progress.
8RFQ for the EPC package for the main plant works is likely to be floated in Q3 2022.
This is a thermal power plant
, and the EPC contractor along with sub-contractors has carried out erection works of the SG, ESP, and TG of a super-critical extension project on the existing site.
8Erection and installation of mechanical equipment of CHP are in progress and civil, and architectural works of AHP are in progress and it is in the advanced stage for completion.
8RFQ for the limestone and gypsum handling system package is likely to float in June 2022.
Rs 5000 crore hydel project
8RFQ for the EOT crane package is likely to be floated in July 2022.
132 kV D/C Transmission Line
8Cost: Rs 90 crore
RFQ for the 132 kV P/S package is likely to be floated in June 2022.
Get in touch with us for more on these projects
Details
Ammonium Nitrate Melt Greenfield Project
8Cost: 88 Cr.
8Project EventThe procurement work is ongoing for the equipment. L&T Hydrocarbon Engineering Ltd is the LSTK contractor, and the scope of work is Process license, Supply of Basic Design., Detailed Engineering, HAZOP Studies, and implementation of its recommendation, Procurement, and Supply of all equipment, Construction is likely to be started in Q2 FY 2022-2023.
Sulphuric acid Greenfield project
8Cost: 400 Cr.
8Project Event: RFQ for the LSTK contractor is likely to be released at the end of June 2022, due to a delay in internal discussion. The company has also signed technology partnership agreements with MECS (Monsanto Enviro-Chem Systems) and TKIS (ThyssenKrupp Industrial Solutions). Details
The set of proposal for raising oil & gas production did not elicit a good reaction from one segment of the industry.
8In fact there is resent and opposition, and this could derail the process. Details
8The government is keen to push through more E&P reforms.
8And a spate of decisions is likely soon.
Click on Details for more
Details
8Project Name:  Kozhikode & Wayanad Districts City Gas Distribution
8Project Cost: Rs 300 crore.
Click here for more details
Details
8Project Name:  Jhabua, Banswara, Ratlam and Dungarpur Districts City Gas Distribution
8Project Cost: Rs 350 crore.
Click here for more details.
Details
Get the daily updates for
8LNG
8
Crude

8Chemicals
8Fertilizers
8LPG
8Ammonia
8All tankers
8Bulk and Dry cargo
8Port Update
Click on Reports for more Details
 < 1 2 3 4 >  Last ›

Showing 51–100 of 261 items