Oil and Natural Gas Corporation Limited has awarded the procurement for the Mud Pumps
8The tender was awarded on a nomination basis.
Click on Details for more   Details
Project Name: Greenfield Hydroelectric Project
8Project Cost: 3000 crores
8Project Description: The owner is carrying out the investigation process for the geological data for a 210 MW (3x70 MW) Stage-II greenfield hydroelectric project. The terms of reference has been granted on October 2018. Moreover, DPR is getting prepared using in-house resources. Further bids are expected soon.
8Project Event: RFQ for EIA consultant services is expected by September 2019.
8Expenditure Approval: Q3:2019
8RFQ Date: Sep/2019
8Release Date: Sep/2019
8Start Date: 2021
8Completion Date: 2026
Click here for more details

Project Name: Greenfield Hydroelectric Power Project
8Project Cost: 700 crores
8Project Description: The owner is preparing the DPR for a greenfield 78 MW (3x29 MW) hydel power project. Techno-economic clearance is pending. Further, the owner will look out for financial institutions to fund the project. Currently, geotechnical investigations are in process. 
8Project Event: RFQ for an EIA consultant is expected by October 2019.
8Expenditure Approval: 2020
8RFQ Date: Oct/2019
8Release Date: Oct/2019
8Start Date: 2021
8Completion Date: 2025
Click here for more details

Project Name: Greenfield Hydroelectric Power Project
8Project Cost: 600 crores
8Project Description: The hydromechanical package contractor GMW Private Ltd is waiting for LOI to start work on the 60 MW (2x30 MW) greenfield hydroelectric power station The civil package contractor Jaiprakash Associates is carrying out the removal of slide deposit in desilting tank area. The work of Desilting tank, Barrage, Diversion Channel and HRT etc. in progress. The E&M package contractor Voith Hydro Private Limited, Noida is in discussion with the owner for the time schedule of their activities. 
8Expenditure Approval: Oct/2017
8RFQ Date: Q3:2019
8Release Date: Q3:2019
8Start Date: Q2:2018
8Completion Date: Q4:2021
Click here for more details

Project Name: Thermal Power Plant - FGD Addition
8Project Cost: 300 crores
8Project Description: The owner is going on with the bidding process for installation of two flue gas desulphurisation (FGD) units in the operating 2x600 MW thermal power plantThe techno-commercial bid date is May 30, 2019. The bidding date is likely to be extended. 
8Project Event: The award of the FGD package is expected by the Q4 2019.
8Expenditure Approval: Q1:2017
8RFQ Date: Q4:2019
8Release Date: Q4:2019
8Start Date: 2022
8Completion Date: 2024
Click here for more details

Project Name: Super Thermal Power Brownfield Project
8Project Cost: 8000 crores
8Project Description: The owner's 1320 MW (2x660 MW) super-critical thermal power expansion project  is currently on hold due to pending approval from the state government and coal linkage issues still not resolved. Though the baseline data collection for EIA studies has been completed earlier and submitted to the State Pollution Control Board. But, there seems to be no further movement in the project.
8Project Event: RFQ for the project is on hold.
Click here for more details

Project Name: Thermal Power Station-II - FGD Addition
8Project Cost: 200 crores
8Project Description: The owner along with consultant Fichtner Consulting Engineers has submitted a feasibility report for implementation of a sea-water based flue gas desulphurization system in the 600 MW unit. The DPR for the FGD is already prepared. 
8Project Event: RFQ of an EPC package for supply, installation, construction, and commissioning of the sea water based FGDs is expected by Q4 2019.
8Expenditure Approval: Q2:2019        
8RFQ Date: Q4:2019
8Release Date: Q4:2019
8Start Date: 2021
8Completion Date: 2023
Click here for more details

Project Name: Super Thermal Power Station - FGD Addition
8Project Cost: 1000 crores
8Project Description: Technical evaluation of bids is currently on. 
8Project Event: Award for FGD is likely to be expected by Oct 2019.
8Expenditure Approval: 2017
8RFQ Date: Oct:2019
8Release Date: Oct:2019
8Start Date: 2022
8Completion Date: 2024
Click here for more details

Project Name: Greenfield Hydroelectric Project
8Project Cost: 2000 crores
8Project Description: Naik Environment Research Institute Ltd is the consultant for preparation of Catchment Area Treatment (CAT) plan for a 163 MW (4x31.5 MW main powerhouse + 2x18.5 MW auxiliary powerhouse) greenfield hydroelectric plant. Drilling and drifitng works have been completed. The EIA consultant R.S.Environlink Technologies Pvt. Ltd. is carrying out the EIA studies. The forest land diversion process is underway. The power evacuation studies are also in process. 
8Project Event: RFQ for construction of bridges and approach roads is expected by the Q4 2019.
8Expenditure Approval: 2020
8RFQ Date: Q4:2019
8Release Date: Q4:2019
8Start Date: 2021
8Completion Date: 2025
Click here for more details

Project Name: Tiuni Plasu Greenfield Hydroelectric Power Station
8Project Cost: 1000 crores
8Project Description: The owner is getting delayed in the techno-economic clearance from the CEA for a 72 MW (3x24 MW) greenfield hydropower project. The owner along with EIA consultant EQMS India Pvt Ltd is carrying out a revision of the DPR. Forest clearance is also pending at the district forest officer stage. The owner has approached Power Finance Corporation to fund the project. EC is likely to be elicited by the Q4 2019. Everain Global Services has prepared the Biodiversity Impact Assessment report
8Project Event: RFQ for engineering, procurement, construction and commissioning of electro-mechanical works is expected by August 2019.
8Expenditure Approval: Q4:2019
8RFQ Date: Dec:2019
8Release Date: Dec:2019
8Start Date: 2021
8Completion Date: 2025
Click here for more details

Project Name: Thermal Power Station - FGD Addition
8Project Cost: 200 crores
8Project Description: The owner along with the consultant is carrying out the feasibility studies to explore whether to install an FGD system or a DSI system at its 630 MW (3*210 MW) unit. The feasbility report will be submitted to the state pollution control board for approval. 
8Project Event: RFQ for supply of FGD system or DSI system is expected by the Q4 2019.
8Expenditure Approval: Q1:2018
8RFQ Date: Q4:2019
8Release Date: Q4:2019
8Start Date: 2022
8Completion Date: 2024
Click here for more details

Project Name: Greenfield Hydroelectric Project
8Project Cost: 1000 crores
8Project Description: The owner has put off the plans to develop a 180 MW (3x60 MW) hydroelectric project due to the local resistance in the project area for the acquisition of land, which results in the failure to conduct a public hearing. The project has been called off.
8Project Event: No further RFQs are expected.
Click here for more details

Project Name: Thermal Power Station - FGD Addition
8Project Cost: 300 crores
8Project Description: The owner along with consultant DCPL is undertaking the preparation of a feasibility report for installation of a flue gas desulphurization system for a 600 MW (2x300 MW) thermal power station located at Baneswarchak village, in the Haldia district of West Bengal. Approval from the state government is already granted. The pre-feasibility is expected to be completed by the Q3 2019. Also, preparation of DPR is under process and expected to complete by the Q4 2019. Work at the site is expected to kick off by 2020.
8Project Event: RFQ for the design, supply, installation, and commissioning of the FGD system is expected in the Q1 2020.
8Expenditure Approval: Q2:2019
8RFQ Date: Q1:2020
8Release Date: Q2:2020
8Start Date: 2021
8Completion Date: 2023
Click here for more details

Project Name: Thana Plaun Greenfield Hydroelectric Power Project
8Project Cost: 2223.59 crores
8Project Description: The owner has been granted environmental clearance for a 191 MW (3x50.33 MW and 2x20 MW) greenfield hydroelectric power station. The diversion of forest land is under process. Moreover, acquisition of 40-hectare private land is also under progress. However, the civil works is getting delayed due to delay in forest clearance.
8Project Event: RFQ for civil works is expected by October 2019.
8Expenditure Approval: Q1:2019
8RFQ Date: Oct/2019
8Release Date: Oct/2019
8Start Date: 2020
8Completion Date: 2024
Click here for more details
Details
Ammonia-Urea Energy Saving Project
8Cost - Rs 380 Crore
8Project Event: The Company will be undertaking significant debt-funded capex to meet energy consumption norms applicable under NUP-2015 from FY2021 onwards. The capex for the project is around Rs. 380 crores and is to be funded in a debt-equity ratio of 70:30. The capex is expected to keep the credit metrics subdued in the near term.
Click here for more details
Sulphate of Potash-Bromine and Captive Power Unit Expansion Project

8Cost - Rs 500 Crore
8Project Event: The project is in the initial phase, management is taking time to move forward. The RFQ for the EPC contractor is likely to be released in July 2019 due to delay in the discussion.
Click here for more details Details
Project Name: Brownfield LPG Import Terminal Expansion Project
8Project Cost: 590 crores
8Project Event: RFQ for the terminal work is expected by end of June 2019.
8Expenditure Approval: Q2:2017
8RFQ Date: Q2:Jun/2019
8Release Date: Aug/2019
8Start Date: 2018
8Completion Date:2021
Click here for more details Details
8Project Name: Oil Field Seismic Study
8Project Cost: Rs 500 crore
8Project Description: Oil India Limited's RFQ for the hiring of seismic survey services for the development of the Schuppen Belt and nearby oil field awarded to the company under NELP VI in Nagaland has finally been closed. As per the sources, the oil PSU has received 5 bids from the different companies
8Project Event: RFQ for hiring services for the Data Interpretation and Analysis is expected by end Q3 2019.
8Expenditure Approval: Q2/2018
8RFQ Date: Q3/2019
8Release Date: Q3/2019
8Start Date: Q3/2019
8Completion Date: Q4/2020
Click here for more details
   Details
8Project Name: Oil Field Development
8Project Cost: Rs 600 crore
8Project Description: A 30 well exploratory drilling programme has been stuck in environment clearance for about around a year, and will take some more time. Furthermore, all the drilling and equipment related tenders will be on hold.
8Project Event: RFQ for the drilling rig is on hold.
RFQ for equipment and oil-field chemicals are on hold.
8Expenditure Approval: Q4/2012
8Start Date: Apr/2020
8Completion Date: Dec/2022
Click here for more details
Details
For reference purposes the website carries here the following tenders:
8Project Management Consultancy Services for LPG Cavern Details
8Procurement of Diesel Operated Forklift Details
8Design and Installation of complete Oxygen Analyser System Details
8Supply of Manual Tong complete with Hanger & Lever Assembly Details
8Supply of Wireline Bridge Plug and Adapter Kit Details
8Procurement of Capacity Drilling Hook Details
8Supply of Packer Hydraulic and Redress Kit Details
8Procurement of Permanent Down Hole Gauges with Accessories and Services Details
8Procurement of Cleaning Agent for MH Asset Details
8Installation, Testing and Commissioning of Air Conditioning Details
8Hiring of Third Party Expert for Benchmarking/ Auditing Details
You can also click on Tenders for more

For reference purposes the website carries here the following Newsclips:
8Indian Air Force's AN-32 fleet allowed to use blended aviation fuel Details
8Indraprastha Gas Ltd Q4 net rises 28 per cent to Rs 225 crore Details
8India restricts bio-fuel imports Details

8Govt will push for reforms in oil & gas, mining, railways sectors: Amitabh Kant Details
8India set to face wider trade deficit though oil imports to ease soon Details
8Pune: Transport utility pays MNGL Rs 27 crore for non-stop CNG supply to buses Details
8Jet Airways crisis: India’s aviation fuel consumption drops for the first time in 4 yrs Details
8Power and LPG among initiatives that secured votes for Modi in Elections 2019 Details
8Government's second term will be absolutely growth-oriented: Anil Agarwal Details
8No subsidy burden could trigger Oil India and ONGC re-rating Details
8US oil drillers cut rigs for third week in a row: Baker Hughes Details
8Unipetrol refinery should get clean oil on May 27 Details

8Pemex's oil exports tumble 11% in April from March Details
8Russian deputy PM: One mt oil to be transferred out of Belarus Details
8China's crude oil imports from Saudi Arabia up 43% y-o-y in April Details
8Unipec, Vitol set to win tender to supply fuels to Bangladesh -sources Details
8Fuel tax rejig, infra required to spur air traffic growth Details
8Oil prices rise amid OPEC supply cuts, but trade worries weigh Details
8Qatar says Saudi Arabia invites it to summit amid boycott Details
8Algeria to block Total from buying Anadarko's Algerian assets - minister Details
You can also click on Newsclips for more   Details
Project Name: Crude Distillation Unit Shutdown
8Project Cost: 15 crores
8Project Description: The owner is planning a shut down in its 2.8 MMTPA crude distillation unit for 45 days in August 2019 under a regular maintenance program. This refinery has three crude distillation units with a capacity of 2.8 MMTPA, 3.7 MMTPA and 4 MMTPA.
8Project Event: A maintenance contractor RFQ is expected by last week of June or by mid-July 2019.
8Expenditure Approval: Q3:2019
8RFQ Date: Q3:/2019
8Release Date: Sep/2019
8Start Date: 2020
8Completion Date:2020
Click here for more details Details
Find out who the new OIL CMD is going to be
8Interviews were held this week, and a clear winner had emerged from among four candidates
8OIL will also have a new finance director in place
Click on Details for more
Details
In all cost plus Production Sharing Contracts (PSCs) for E&P fields, there is a need for the DGH to put together detailed guidelines on how the contracting process is to be conducted
8"There is a need for transparency in the entire selection process, something that the DGH does not thoroughly get into, except to generally specify how to arrive at a competitive price with a certain number of minimum bidders," an industry source told this website
Click on Details for more Details
The RIL negotiation process for the Sub Sea Production (SPS) package for the MJ field has been awarded.
8There were four bidders in the race
8The contract has been awarded
8But the contracting process was very opaque, leaving bidders miffed.
8"We spend up to $2 million in putting together a bid of such magnitude and complication, and if the contracting process is not transparent, the entire effort then goes to waste," one of the bidders told this website
Click on Details for more Details
If you are an LNG importer looking for a good deal out of a greenfield project, here is a bargain offer
8A fixed price of $2.35/MMBtu and 113% of US Henry Hub for long term offtake agreements for its up to 8.8 million mt/year project
8This compares much better than let us say other competitive projects which is selling as at a liquefaction fees ranging over $2.25-$3/MMBtu and supply gas indexed to 115% of Henry Hub
Click on Reports for more Details
If you are thinking of retrofitting our vessel with scrubbers, better hurry up
8The ship repair sector is showing a constant and gradual increase on the workload throughout the past months, with almost all the shipyards world-
 wide having already reached close to their maximum capacity as we are heading towards the end of the first half of the year.
8A lot of difficulties are expected to be encountered from the shipyards into delivering the scrubber retrofit projects on time given the expected workmanship and considering the big spectrum of uncertainties and complications. One of these uncertainties is the usually late delivery of most of the
 spare parts, i.e. equipment, cabling, exotic piping, sensors, big valves etc.which in most of the projects coincides with the critical step of the retrofit.
Click on Reports for more Details
The PNGRB is facing a host of legal complaints over extra territorial jurisdictions among CGD players
8Pipelines are being constructed outside a GA and billed as a sub-transmission pipeline
8There are also complaints of encroachment of GAs as well
8It looks like the PNGRB board will be caught up in a spate of such disputes
8Clearly something has to be done to streamline the system
Click on Reports Details
IOC profits were more than what the market had expected
8But is that a result of efficiency gains or higher GRMs?
8Had IOC's fundamentals improved?
8Not really
8Is it the same story with HPCL?
(Also, IOC has drawn up a capex plan of a massive Rs 2.15 lakh crore over 2019-24, know more about it)
Click on Reports for more Details
The UK is one of the most advanced countries when it comes to power reforms and use of new technology.
8Here is a complete template of how UK power companies can work in India
8May be this is a good time for Indian entrepreneurs to tie up with these companies to look for unfolding opportunities here
Click on Reports for more Details
Petronet LNG Ltd's 2.5 MMTPA expansion at Dahej will be completed by June 2019
8Even so, the terminal will ride at over 100%
Click on Reports for more Details
8ONGC awards Logging Cables contract: Find out more
-- Find out who the contactor was
8ONGC awards Air Winch contract: 5 firms disqualified
-- One contractor however won the bid
Click on Details for more Details
8Project Name: CBM Block Development
8Project Cost: Rs 1000 crore
8Project Description: Work is going on at full pace.The EPC contractor has completed the procurement process and the mechanical equipment installation is expected to be completed by the end of the next month. The infill pipeline network will be completed over time. The project envisages coal bed methane gas production of 4.068 billion cubic meters in 20 years with a peak of 0.9 million standard cubic meters per day. The project was earlier expected to be completed by 2023, but the date has now been advanced to 2022,but with an additional cost of Rs 251 crore.
8Project Event: RFQ for an O&M contract is expected by September 2019.
8Expenditure Approval: Q1/2017
8RFQ Date: Sep/2019
8Release Date: Q4/2019
8Start Date: Q3/2017
8Completion Date: Mar/2022
Click here for more details for more, including key contacts
Details
8Project Name: Oil Field Development
8Project Cost: Rs 8000 crore
8Project Description: The owner's 179 well onshore development drilling project has been delayed. The wildlife clearance for the project has been delayed. Environment clearance for the project is expected by Q2 2020. It is to be mentioned here, that drilling will be carried out using Extended Reach Drilling Technique for which a rig will be hired separately. The process of hiring an EPC contractor for setting up of 9 production installations along with laying of associated pipelines will be done at a later stage. 
8Project Event: RFQs for hiring integrated third-party drilling services is expected by Q4 2019
RFQs for hiring an EPC contractor for production installation is expected by Q1 2020
8Expenditure Approval: Q4/2017
8RFQ Date: Q4/2019
8Release Date: Q4/2019
8Start Date: Q2/2020
8Completion Date: Oct/2024
Click here for more details, including key contacts
Details
8Project Name: Field Redevelopment Project
8Project Cost: Rs 1200 crore
8Project Description: Work is on at full pace with the project expected to be completed (including the drilling of 129 development wells) by the year 2026. Most major contracts have been awarded, with the last one being for 4000 m3 Effluent Treatment Plant
Contracts have been awarded to
UEM India Private Limited, DNV-GL, HAL Offshore Limited
Drilling is to be done by the company itself

8Expenditure Approval: Feb/2017
8RFQ Date: Q2/2020
8Release Date: Q2/2020
8Start Date: Q4/2018
8Completion Date: Mar/2026
Click here for more details
Details
8Project Name: ETP Modernization
8Project Cost: Rs 200 crore
8Project Description: Driplex Water and Engineering Service has bagged the LSTK contract. The Project Management consultant LOI has not been awarded till now and is expected to be awarded by the next month. Find out details of the companies in the race. Furthermore the LSTK contractor has already floated some subcontracts
8Project Event: LOA for the PMC will be awarded by June 2019.
8Expenditure Approval: Q1/2018
8Start Date: Q2/2019
8Completion Date: Jun/2023
Click here for more details
Details
For reference purposes the website carries here the following tenders:
8Supply of Air Compressors Details
8Hiring of Trainees from Neem Agency for Kanpur and Bareilly Details
8Supply of Seamless Line Pipes Details
8Hiring of services for collection of crude oil from Effluent Pits and other installations Details
8Civil SOR for bilaspur RRO Details
8Procurement of Test Unit for BOP Details
8Hiring of Services of tankers for transportation of waste/ effluent water from CBM Wells Details
8Procurement of CNAF gasket sheet for surface team Details
8Procurement of Portable Oxygen + LEL Detector for Terminal with O&M base stations of pipeline system Details
8Procurement of assorted pipes on annual rate contract basis Details
You can also click on Tenders for more

For reference purposes the website carries here the following Newsclips:
8Russia-Belarus talks to prepare for PMs' meeting on oil Details
8Torrent Power, GSPC seek LNG cargoes for July: Sources Details
8OPINION: US fills in on oil where OPEC refuses to go Details
8INNOVATION: Artificial photosynthesis transforms CO2 into fuels Details
8Re-election of NDA will be credit neutral for oil and gas sector: ICRA Details
8GST on fuel, easier licensing rules the needed energy bars Details
8Russian oil flows to Slovakia resume: Transpetrol Details

8UK gas for immediate delivery falls to one-month low Details
8Kazakhstan ready to supply oil to Belarus: Belta cites envoy Details
8Turkey stopped purchasing Iranian oil as of May Details
8Rosneft's domestic oil sales hit by dirty oil crisis Details
8Kuwait's KUFPEC signs oil concession agreement in Pakistan Details
8Bulgaria builds gas link to end full reliance on Russian gas Details
8Asia LNG spot price drops below $5/mmBtu as supply floods market Details
8Ivory Coast awards Total and ENI new oil and gas blocks Details
8Saudi Aramco ends talks to join Novatek's Arctic LNG-2 project Details
8Saudi Aramco to buy liquid natural gas from US company under 20-year deal Details
8Brazil's Petrobras approves stake sale in distribution unit BR Distribuidora Details
8Maine company wants to turn cow poo into gas to heat homes Details
8Iran stores more oil on land and at sea as exports slump Details
8Shell starts production at giant Appomattox field in Gulf of Mexico Details
8PetroChina raising gas prices ahead of pipeline reshuffle Details
8Oman LNG signs natural gas liquids sales agreement with Oman Oil Details
You can also click on Newsclips for more   Details
For reference purposes the website carries here the following tenders:
8Procurement of Gland Packing at C2C3 and LPG Plant Details
8Procurement of aluminium scaffolding for ECU furnace Details
8Procurement of Bike Mounted High Pressure Water Mist System Details
8Maintenance of Cathodic Protection Kirk Cells of NPSL Product Pipeline Details
8Supply of Injection Moulded 40 mm ID Spouted HDPE Caps to Lube Oil Blending Plants Details
8Hiring of Gas Compression Services Details
8Supply, Supervision and Commissioning of Mass Flow Meters Details
8Supply, Installation, Commissioning and training of Audio-Visual System Details
8Supplying, Installing, Testing and Commissioning of motor operated high mast tower Details
8Procurement of Gas Chromatograph, Turbidity Meter and UV-Visible Spectrophotometer Details
8Annual Contract for requirement of Retrofitting Concrete Structure Details
You can also click on Tenders for more

For reference purposes the website carries here the following Newsclips:
8Government stops issuing Reliance-BP penalty notices for KG-D6 gas output shortfall Details
8India’s oil imports jumped 14% in April, Iran shipments down 42% Details
8Russian pipeline restart hit by dirty oil evacuation problems Details
8Hungary's MOL will store some contaminated Russian oil Details

8Angola awards fuel tender to Total, Trafigura Details

8EnergyAustralia to buy gas from Port Kembla LNG import terminal Details
8OPINION: BP vote pours gas on Exxon's climate fire Details
8Shell reveals only its gas subsidiary paid Dutch corporate tax in 2018 Details
8Saudi Arabia to buy U.S. LNG from Sempra Energy's Port Arthur project Details
8INNOVATION: Proposed U.S. plant to pull CO2 from thin air, use it to pump oil Details
8Russia says clean crude oil to reach Hungary, Slovakia within a week Details
8Daily shale gas output at PetroChina's Changning field hits 10.1 mln cubic metres Details
8Saudi Arabia to buy U.S. LNG from Sempra Energy's Port Arthur project Details
8Norway's April oil output lags forecast, gas production beats Details
8Sakhalin Energy sells Aug-Sept crude cargoes at higher premiums Details
8Oil prices fall on surging US crude stockpiles, economic concerns Details
8Daily shale gas output at PetroChina's Changning field hits 10.1 mln cubic metres Details
8Transneft to discuss oil contamination in Poland on Thursday Details
You can also click on Newsclips for more   Details
8Open loop scrubbers in ships preparing for 2020 guidelines face an uncertain future. The total number of ships in operation and on order with scrubbers fitted rose to 3,286 in May.Will the investment go waste?Click on Reports for more.
8High crude oil import dependency: Find ways to bring it down. Click on Reports for more
8The Chinese chemical and petrochemical industry is getting less competitive for a number of reasons. Is this the time for India to step in? Click on Reports for more.
8Get full performance analysis of the refining trio of BPCL, HPCL and IOC. Click on Reports for more
8The LPG freight market will see a lot of upheaval post IMO 2020, as a battle emerges between those who are fitted with scrubbers and those which are not. Click on Reports for more.
8Ennore LNG terminal: Full utilization not likely anytime soon. Click on Reports for more.
8New Trend: LNG contracs are getting signed on sport markers. Click on Reports for more. Details
Adani Welspun Exploration Ltd, a 65:35 JV between Adani Group and Welspun is working on four blocks as of the moment
8In one block itself (the B-9 Cluster), plans are being put in place for an investment of $110 million
8Overall, the blocks are either in advanced exploration of FDP stages
8First revenues are expected in 2020-21
Click on Reports for more Details
Project Name: Greenfield Hydroelectric Power Project, Stage-1
8Project Cost: 2000 crores
8Project Description: The owner has extended the bidding date for an EPC contract for design and engineering services of main civil and hydro-mechanical works in a greenfield 210 MW (2x80 MW main unit + 2x25 MW auxiliary unit) hydroelectric power project
8Project Event: RFQ for E&M works worth Rs. 372.78 crores are expected by the Q3 2019.
8Expenditure Approval: Q4:2018
8RFQ Date: Q3:2019
8Release Date: Q3:2019
8Start Date: 2020
8Completion Date: 2025
Click here for more details

Project Name: Greenfield Hydroelectric Power Project
8Project Cost: 2500 crores
8Project Description: The CEA has vetted the project cost at Rs. 2238 crores. The stage-I forest clearance accorded on 26.02.2018 and stage-II forest clearance is under progress. Construction of boundary pillars for demarcation of forest land is in progress. 
8Project Event: RFQ for design and construction of single-lane steel truss Bridges-IV are expected by June 2019.
RFQ for main plant civil works is expected by the Q4 2019.
8Expenditure Approval: Dec/2018
8RFQ Date: Jun/2019
8Release Date: Jun/2019
8Start Date: 2020
8Completion Date: 2025
Click here for more details

Project Name: Thermal Power Station - FGD Addition
8Project Cost: 200 crores
8Project Description: BHEL, Tata Power, and L&T have been qualified in the techno-commercial part of the bid for the installation of a flue gas desulphurization system
8Project Event: The award for the FGD package is expected by the Q4 2019.
8Expenditure Approval: Q2:2019
8RFQ Date: Q4:2019
8Release Date: Q4:2019
8Start Date: 2021
8Completion Date: 2023
Click here for more details

Project Name: Combustion Modification Package
8Project Cost: 100 crores
8Project Description: The owner has awarded to GE Power -- in the race were ISGEC Heavy Engineering Ltd and Doosan Power System,--  for installation of a combustion modification package for a 1500 MW (3x500 MW)super thermal power plant
8Project Event: RFQ for air compressor, valves and fittings, and ID fans is expected by July 2019.
8Expenditure Approval: Q2:2017
8RFQ Date: Jul/2019
8Release Date: Jul/2019
8Start Date: Q4:2019
8Completion Date: 2021
Click here for more details

Project Name: Thermal Power Station: Installation of WFGD
8Project Cost: 300 crores
8Project Description: The owner in consultation with NTPC is preparing cost estimate and technical specifications for installation of four wet limestone based flue gas desulphurisation systems
8Project Event: RFQ for design, engineering, supply, erection, and commissioning of a wet FGD system is expected by July 2019.
8Expenditure Approval: Q1:2018
8RFQ Date: Jul/2019
8Release Date: Jul/2019
8Start Date: 2021
8Completion Date: 2023
Click here for more details

Project Name: Installation of FGD
8Project Cost: 300 crores
8Project Description: The owner is going on with evaluation of bid for installation of FGD in 2x500 MW thermal power station
8Project Event: The award for the flue gas desulphurization system (FGD system) is expected by July 2019.
8Expenditure Approval: Q312017
8RFQ Date: July:2019
8Release Date: July:2019
8Start Date: 2021
8Completion Date: 2023
Click here for more details

Project Name: Thermal Power Station - Installation of new cooling towers
8Project Cost: 200 crores
8Project Description: The owner is preparing feasibility report for installation of new cooling towers in the 3x210 MW  in place of the old cooling towers at the existing facility of 2630 MW (3x210 + 4x500 MW) thermal power station located . The floating of RFQs for supply of new cooling towers is getting delayed due to delay in preparation of DPR. 
8Project Event: RFQ for supply, installation, erection, and commissioning of cooling towers are expected by the Q3 2019.
8Expenditure Approval: Q2:2018
8RFQ Date: Q3:2019
8Release Date: Q3:2019
8Start Date: 2020
8Completion Date: 2022
Click here for more details
Details
Ammonia-Urea Energy Revamp Project
8Cost - Rs 200 Crore
8Project Event: The civil work is ongoing and the project is likely to be commissioned by the end of 2020.
Click here for more details
Ammonia-Urea Energy Saving Project

8Cost - Rs 250 Crore
8Project Event: The company is still in trouble, but the sources said that they will complete the energy norms within the timeframe provided
Click here for more details Details
Get a complete update on refinery expansion and maintenance projects up ahead.
8Over 20 updates are given here
Click on Details for more Details
8Find out those who are in the race for the tender
Click on Details for more Details
ONGC has asked for empanelment of bidders for the execution of wellhead platforms
8What the company is asking for is expertise in surveys, design, engineering, procurement, fabrication, load out, tie down / sea fastening, tow-out / sail-out, transportation, installation, hook-up, testing, pre-commissioning and commissioning. The whole contract will be executed on LSTK basis within an overall period of 3 years.
8Know more about the companies which are likely to show interest.
8The tender will close by 11 Jun 2019, and at least seven bidders are expected
Click on Details for more Details
ONGC has awarded a premium casing pipes contract recently to a foreign supplier
8It was a keenly fought tender
8The contract involves supply of premium casing pipes for one year
Click on Details to know who the winner is Details
Project Name: Greenfield POL terminal
8Project Cost: 225 crores
8Project Description: The owner is planning to set up a new POL (Rail- fed) Depot in South India. The company has appointed M/s. Enviro Resources, Mumbai, to obtain Environmental Clearance. Equipment required for the project: Storage Tanks, Compressors, Valves, Pumps, Fire Proofing(Sprinklers, Alarms), DG sets of power 2x500, 1x250, 1x25 kVA.
8Project Event: RFQ for surveying work is expected by mid of July.
8Expenditure Approval: Q2:2019
8RFQ Date: Q3,July/2019
8Release Date: Sep/2019
8Start Date: 2019
8Completion Date:2021
Click here for more detail Details
At long last, LOIs are getting issued for the 5 MMTPA Chhara LNG terminal promoted by HPCL in collaboration with the Shapoorji-Pallonji group
8It had been two years since the tender for the terminal closed
8But last week, contracts were awarded, it is learned
Click on Details for more
Details
For reference purposes the website carries here the following tenders:
8Supplying and filling earth inside HWD-H well head Setup in Bahadur Chariali area Details
8Procurement of Premium Connection Tubing for DDW wells in JV block KG-OSN-2001/3 Details
8Procurement of CS, IBR and NACE Flanges Details
8Annual Rate Contract for Outdoor Network Infrastructure Installation Details
8Clamp On Ultrasonic Flow Transmitters for High Temperature at refinery Details
8Supply of Vessels at refinery Details
8Hiring of services of transportation of water on call out basis Details
8Procurement of Tyres, Tubes and Flaps Details
8Supply of Capital Instruments for Drill Site Laboratories Details
8Acquisition of 395 Nos. of Integrated G&G Interpretation licenses on Access Rights Basis Details
8Renovation and Construction of new Tool Yard/ Shed Details
You can also click on Tenders for more

For reference purposes the website carries here the following Newsclips:
8Reliance topples Indian Oil to become the biggest Indian company Details
8Shell opens its first lubricants laboratory in India Details
8ONGC to spend Rs 65,773 crore on ramping up production from 13 projects Details
8How to make rural India switch to cleaner cookstoves Details
8BPCL cracks over 4%; brokerages mixed after Q4 numbers Details
8There is no issue as far as crude supply is concerned: M K Surana, HPCL Details
8HPCL likely to borrow Rs 8,000 cr in FY20 to revamp its refineries: Chairman MK Surana Details
8Russia's Sakhalin Energy shuts LNG train 1 after unexpected issue Details
8Malaysia's Petronas shuts Sabah-Sarawak gas pipeline for maintenance Details
8Uniper tests interest in its German LNG import project, seeks partner Details

8EU urges Turkey restraint in Cyprus energy dispute Details

8Columbia natgas pipe see Monday fix to West Virginia MarkWest problem Details
8Novatek and TechnipFMC sign EPC contract for LNG plant Details
8US energy secretary: Sanctions bill on Nord Stream 2 coming soon Details
8Despite rhetoric, Turkey complies with US oil sanctions on Iran Details
8PGNiG prepared for problems with gas supply from East: CEO Details
8High-level committee submits report on reducing import dependence Details
8Climate change protesters disrupt BP investor meeting, Shell gets boost Details
8COLUMN:Funds sell oil as economic fears trump supply threats: Kemp Details
8Oil falls after Saudi assurances on market balance, Mideast tensions Details
8COLUMN-Saudi Arabia waits for higher spot prices before raising oil exports: Kemp Details
8Saudi Arabia to buy U.S. LNG from Sempra Energy's Port Arthur project Details
You can also click on Newsclips for more   Details
GAIL's breakwater construction project to push the capacity of the Davhol LNG terminal up to 5 MMTPA seems to have got into trouble
8The contracting process may get delayed by quite some time
Click on Details for more Details
Overall LNG prices, contract plus spot, has seen a sizeable decline in price in India in April 2019, compared to April, 2018
8Prices are lower in April in comparison to the average price for all of 2018-19 as well
Click on  Report & Details for more. Details
Project Name: Yeramarus Super Thermal Power Station: Installation of WFGD
8Project Cost: 500 crores
8Project Description: Raichur Power Corporation Limited, a JV of KPCL, BHEL, and IFCIL is carrying out the bidding process for the development of the wet limestone based FGD system in the 2x800 MW thermal power project located in the Raichur district of Karnataka. Fichtner Consulting Engineers and STEAG has carried out the design of the FGD equipment. Further bids are expected soon. The pre-bid meeting is expected by the end of May 2019. 
8Project Event: The technical bid date is expected by July 2019.
8Expenditure Approval: Q1:2018
8RFQ Date: Jul/2019
8Release Date: Jul/2019
8Start Date: 2020
8Completion Date: 2022
Click here for more details

Project Name: Lower Kopili Greenfield Hydroelectric Project
8Project Cost: 1000 crores
8Project Description: The RFQs for an electro-mechanical package in the APGCL's 120 MW (2x55 MW surface power-house + 2x2.5 MW+1x5 MW auxiliary power-house) greenfield hydroelectric project at Longku village, situated in the Karbi Anglong district of Assam is getting further delayed due to clearance pending at the state high-level committee. The civil and hydro mechanical bids have been floated,and are still under evaluation. Patel Engineering Limited, HCC Limited, Gammon India are among the major contenders in the bid.
8Project Event: RFQ for engineering, procurement, construction and commissioning of electro-mechanical works is expected by August 2019.
8Expenditure Approval: Q1:2018
8RFQ Date: Aug:2019
8Release Date: Aug:2019
8Start Date: Q1:2020
8Completion Date: Q3:2024
Click here for more details

Project Name: Solapur Super Thermal Power: FGD Addition Project
8Project Cost: 500 crores
8Project Description: GE Power India along with sub-contractor Priya Construction is carrying out the RCC works at the chimney for implementation of a Flue Gas Desulphurisation Unit (FGD) in the NTPC's 1320 MW (2x660 MW) thermal power complex in Solapur, Maharashtra. Currently, civil works are under progress. Further bids are expected soon.
8Project Event: RFQ for supply and installation of limestone handing plant is expected by June 2019 by GE Power India.
8Expenditure Approval: Q2:2017
8RFQ Date: Jun/2019
8Release Date: Jun/2019
8Start Date: Q4:2018
8Completion Date: Q1:2021
Click here for more details

Project Name: Marwa Tendubhata Thermal Power Station - Installation of FGD
8Project Cost: 300 crores
8Project Description: (NEW DESCRIPTION) Chhattisgarh State Power Generation Company Limited is preparing technical specifications for installation of a wet limestone based flue gas desulphurisation system at its 1000 MW (2x500 MW) thermal power station located at Marwa village, in the Janjgir-Champa district of Chhattisgarh. Development Consultant Private Limited has prepared the DPR for the FGD. Wet Stack will be used instead of GGH.
8Project Event: RFQ for design, supply, installation, erection, and commissioning of WFGDs is expected by July 2019.
8Expenditure Approval: Q3:2018
8RFQ Date: Jul/2019
8Release Date: Jul/2019
8Start Date: 2020
8Completion Date: 2022
Click here for more details

Project Name: Rajghat Thermal Power Station - Dismantling
8Project Cost: 200 crores
8Project Description:Indraprastha Power Generation Co. Ltd. is planning to dismantle two plants of 135 MW (2 x 67.5 MW) coal-based thermal power plant in Rajghat, Delhi. The two plants have been shut down since December 2015. Currently, the promoter is approaching the Delhi Government for approval of the dismantling process. 
8Project Event: RFQ for dismantling services of various equipment is expected to kick off by the Q4 2019.
8Expenditure Approval: Q2:2017
8RFQ Date: Q4:2019
8Release Date: Q4:2019
8Start Date: 2020
8Completion Date: 2021
Click here for more details

Project Name: Talwandi Sabo Super-Critical Thermal Power Project - Installation of SNCR
8Project Cost: 800 crores
8Project Description: Talwandi Sabo Power Limited is going on with the bidding process of a Primary NOx Emission Control system in the 1980 MW (3x660 MW) super-critical thermal power complex at Mansa, Punjab. The price bid evaluation for the installation of wet flue gas desulphurisation system is under progress in which BHEL, Mitsubishi Hitachi Power Systems India Pvt. Ltd, ISGEC Heavy Engineering Limited, GE Power India Limited, and L&T are the major contenders.
8Project Event: The award of the FGD package is expected by August 2019.
The award of the Primary NOx control system is expected by September 2019.
8Expenditure Approval: Q3:2019
8RFQ Date: May:2019
8Release Date: May:2019
8Start Date: 2020
8Completion Date: 2022
Click here for more details
Details
Ammonia-Urea Revamp Project
8Cost - Rs 6000 Crore
8Project Event: The installation of equipment is ongoing and 96 % physical progress has been completed. The commissioning has been delayed by 8 month due to delay in the construction, now the plant is likely to be commissioned by September 2019 in place of December 2018
 Click here for more details
NPK Fertilizer Greenfield Project
8Cost - Rs 400 Crore
8Project Event: The project is on hold due to lack of fund..The RFQ for the EPC contractor is likely to be released in August 2019.
Click here for more details  Details
From early 2019 spot LNG prices began to fall sharply, from over $10 in January to less than $5 by May.
8The fall in spot prices is driven by an over supplied market but the point to note is that there is considerable divergence between spot LNG prices and long term contract prices which are usually based on crude prices. So much so, that the differential is more than 100%, as crude prices continue to stay high
8Forward curves show that long term contract prices may stay higher for the rest of 2019 and 2020 while forward spot prices for this period  will be much lower
8There is a fundamental decoupling of LNG prices from crude prices taking place in the market today
8And even if the demand-supply balance is restored in the future, it will not be the same again.
8Find out more on the rapid but permanent changes taking place in the LNG market today
Click on Reports   Details
EIL is working out a new set of initiatives to push its business forward
8It likely to push for OBE contracts
8Look for sweat equity. technology collaborations
8Alliances is another way it plans to diversify
Click on Reports for more Details
Not enough is known on the entire scope of US sanctions on Iran and its impact on India
8The sanctions have wide and serious implications for India.
Click on Reports to know more Details
Setting greenhouse emission reduction targets has now become a necessary exercise for an oil & gas company
8The important first step is to figure out what the company's own footprint is. An independent assessment is also a necessity
8Once the total emission footprint is established, goals have to be set for reducing emissions
Click on Reports for a step by step guide on how to begin this exercise. Know more on how other companies are doing it Details
India's interest in LNG trucking is rising. Truck loading facilities are now standard features in any regasification plant
8Standard lithium-ion battery technology is likely to penetrate the passenger car, light commercial vehicle, city bus and municipal vehicle markets, but it has made no inroad into the higher energy consuming heavy-duty vehicle market.
8Lithium-ion heavy trucks, despite much fanfare, remain largely at a conceptual stage as developers grapple with the weight, power and range requirements.
8The point to note however is that LNG as a fuel for heavy vehicles are expected to have a golden run only until 2030 only and not after that.
8Any investment payback analysis must take this crucial timeline into consideration while working out the maths.
Click on Details for more Details
For reference purposes the website carries here the following tenders:
8Laying of MDPE pipes network & associated works for City Gas Distribution Details
8Carrying out Reactor effluent air coolers tubes internal cleaning to enable NDT during shutdown Details
8Supply of Fittings Details
8Provision of Third Party Inspection Services Details
8MVWS system and allied modification jobs Details
8Procurement of CS, NACE and IBR Pipes Details
8Procurement of tripod mounted Multi Gas Detector as per technical specification at refinery Details
8Passivation of SS equipments and piping circuits at refinery Details
8Loading of Sulphur by excavator loader including lump sulphur excavation at refinery Details
8Supervision work of Cup Lock Scaffolding and Tubular Scaffolding at refinery Details
8Supply of Thermal Safety valves Details
8Supply of Compressor Spares Details
You can also click on Tenders for more

For reference purposes the website carries here the following Newsclips:
8Pawan Hans sale: Govt to issue fresh bid document, to indemnify buyers of contingent liability Details
8High gas prices led ONGC to start integrated development of KG basin blocks at a cost of Rs 3,917 cr Details
8HPCL fourth quarter net profit up 70 per cent at Rs 2,970 crore Details
8BPCL fourth quarter net profit up 16 per cent at Rs 3,125 crore Details
8Venezuela oil minister says economy, oil industry under US siege Details
8Russia's Novak: Many options for oil deal, including production rise Details
8China's CNPC breaks into Myanmar fuel retailing with Singapore brand Details

8Libya's oil and gas revenues reach $1.87 billion in April Details

8Saudi energy minister says attacks put security of oil supply at risk Details
8Gazprom chief says slight changes to Nord Stream 2 timings possible Details
8Fuel prices in India rise as 2019 Lok Sabha polls come to a close Details
8Greenpeace activists block entrance to BP HQ demanding an end of oil exploration Details
8Saudi oil sector secure, minister says after attacks Details
8Saudi energy minister recommends driving down oil inventories, says supply plentiful Details
8Iraq oil minister says deal with Exxon close, slowed by evacuation Details
8Oil rises on escalating U.S.-Iran tensions; trade war concerns weigh Details
8COLUMN:Funds sell oil as economic fears trump supply threats: Kemp Details
You can also click on Newsclips for more   Details
8Project Name: Drilling Site Development
8Project Cost: Rs 9734 crore
8Project Description: This is an ambitious development drilling plan but the clearance process has been slow and tedious.
As per latest estimates, the timelines are:
-- RFQs for hiring Rigs and other equipment are expected by Q4 2019.
-- RFQ for hiring an EPC contractor for pipeline part of the project is expected by Q2 2020
8RFQ Date: Q4/2019
8Release Date: Q4/2019
8Start Date: Q2/2010
8Completion Date: Q2/2025
Click here for more details
Details
Oil and Natural Gas Corporation Limited's tender for the hiring of helicopters has attracted interest from five bidders
8The bidding process is currently on
Click on Details for more   Details
This is a multi-asset work involving geological and geophysical interpretation
8Two companies are hotly in the race
Click on Details for more Details
As we all know, oil & gas agents and consultants rarely move out to become entrepreneurs
8But here is one instance where one such agent has decided to try his hand at setting up a small-scale LNG plant in the east coast.
8It is trying to tie-up customers.
8Work on the terminal is expected to begin as early as October, 2019.
Click on Details for more Details
What are HOEC's plans for the B-80 block that it won in partnership with Adbhoot Estates
8A MOPU is to be mobilized
8A contractor is on the verge of being selected
Click on Details for more Details