All content in this website is sourced legitimately

Archives


All the news items since the launch of our web site are preserved in the archive section. The archive entries are freely accessible to all the users.


Apr 2026

8Here's what's happening today in the E&P, midstream-downstream, and CGD section
Click on Reports for more Details Details
8This is after months of extensions and clause rewrites
Click on Details for more
Details
1) ONGC turns KG-DWN-98/2 Odalarevu’s revised effluent and MEG pipeline plan into a tightly staged CRZ-EC clearance race
8ONGC’s latest Odalarevu package is really about a changed field-development logic, not just another environmental consultancy hire.
8A disposal-well and horticulture route has given way to marine discharge and new MEG-linked pipelines, pulling coastal regulation, marine modelling, and amendment engineering into one clearance chain.
 
2) Oil India water disposal well O&M contract win: Details
8Oil India’s water disposal well O&M award looks straightforward only until the tender paper trail is read closely.
8The contract structure keeps mobilization, security and last-well execution pressure firmly on the contractor, while the underlying documents carry a striking scope-reference mismatch.
 
3) Shree Laxmi Corporation emerges L1 for ONGC Ankleshwar SRP maintenance contract 
8The price spread looks controlled, but this is not a light-service contract where a narrow quote can be shrugged off.
8ONGC has bundled uptime, spares, breakdown response, electrical responsibility, painting, custody, and digital workflow into one five-year operating bet.
 
4) This basin tender is really a live cementing operations contract disguised as an O&M service package
8This is not a static maintenance contract.
8The documents push the contractor into the middle of field execution, equipment placement, pressure testing and simultaneous drilling support.
8That makes the commercial risk profile far sharper than the title line suggests.
 
5) Singha Hydraulic wins ONGC Assam Asset well-fluid preheater maintenance contract at a sharply discounted L1 price
8ONGC Assam Asset’s preheater maintenance award is not a routine low-bid story.
8The tender papers load the contractor with specialised extraction, hydro-jetting, chemical-cleaning and repair obligations that make execution quality inseparable from price.
 
6) Two bidders clear ONGC’s Rig Sagar Vijay valuation tender after risk-softening corrigendum
8ONGC did not broaden the market by loosening technical discipline on Rig Sagar Vijay.
8It did something more telling: it eased time and cash-flow stress while keeping the valuation job inspection-heavy and tightly governed.
 
Click on Details for more
Details
1) ONGC’s Rajahmundry asset 10K production-testing tender kept risk on the contractor even after bidder clarifications narrowed field ambiguities
8ONGC used the clarification round to answer field-execution questions without softening the commercial burden of a three-year, high-pressure testing package.
8The replies show where Rajahmundry’s production-testing tender behaves less like routine equipment hire and more like a reliability-heavy flowback services contract.
8Four bidders stayed qualified, one fell out, and the real story sits in how ONGC redrew almost every grey interface without yielding the core risk position.
 
2) OIL India Rajasthan Field widens MSG eligibility but tightens per-unit accountability as tender is extended
8OIL has not merely pushed the date; it has redrawn the competitive map for Rajasthan steam services.
8The corrigendum opens the door to a broader vendor pool while making two-unit performance harder to blur inside a bundled commercial structure.
8The market impact sits in the tension between easier entry and stricter monetisation discipline.
 
3) Two bidders clear ONGC’s Rig Sagar Vijay valuation tender after risk-softening corrigendum
8ONGC did not broaden the market by loosening technical discipline on Rig Sagar Vijay.
8It did something more telling: it eased time and cash-flow stress while keeping the valuation job inspection-heavy and tightly governed.
 
Click on Details for more
Details
New Page 1 8Moefcc sets two-day virtual eac hearing to vet major oil, gas and petrochemical projects across states [EAC] Details
8HPCL says HRRL refinery fire was contained quickly, with no casualties and no material impact seen [HPCL] Details
8CPCL sets april 24 earnings call, saying no price-sensitive information will be shared [CPCL] Details
8Engineers india formalizes RTA transition through tripartite pact with kfin and alankit [EIL] Details
8Veedol shares ex-executive director Sanjeev wangoo’s resignation letter, citing personal and professional reasons [Veedol] Details
8Seamec’s vessel princess wraps up addendum job scope, marking another offshore milestone [Seamec] Details
8Seamec says agastya is back on hire after technical fix, returning to field on april 21 [Seamec] Details
8Desco infratech tells bse recent surge in trading volumes is entirely market-driven [Desco] Details
8IGX holds open house on proposed 1-year and 2-year term-ahead gas contracts [PNGRB] Details
8IGX's response on comments received regarding introduction of term-ahead contracts of 1 year and 2 years on  plIGXatform [PNGRB] Details
8Market feedback builds on igx plan to launch 1-year and 2-year term-ahead gas contracts [PNGRB] Details
Details
8But doesn’t trust the exchange to hold the risk
Click on Details for more Details
1) IOCL’s pipeline security bet leans on manpower over technology
8Pipeline integrity is being guarded by boots on the ground, not sensors in the field. The absence of digital surveillance raises scalability questions. The real risk may lie in what is not being monitored.
 
2) Aggressive L1 pricing defines BPCLs geotechnical award outcome
8The lowest bidder edged out competition by a narrow margin over L2. Yet the broader spread shows deep disagreement on cost structures. The real story lies beyond the first two bids.

Click on Details for more
Details
8The PMC role for this gas pipeline now stretches beyond oversight into deep engineering validation and inspection control. This changes accountability structures across the project lifecycle. The question is whether EPC contractors are being sidelined in execution authority.
Click on Details for more Details
8A technically complex upgrade has been routed through a single-source procurement model. That limits competitive tension at a time when cost discipline is under scrutiny. The bigger question is how price reasonableness will be established.
Click on Details for more Details
8Early stress test for green R&D contracting
Click on Details for more Details
8This is even as as tight API 618 qualification narrows the field
Click on Details for more Details
8It must integrate with MPMC and multiple EPC contractors. Coordination risk may become the dominant execution challenge.
8Bidders flagged multiple gaps, but most were turned down.
8What emerges is a contract structure that quietly reshapes PMC responsibility.
Click on Details for more Details
1) Refinery solar RESCO tender shifts full lifecycle risk to contractors
8It leans heavily on a RESCO structure that minimizes its capital exposure. The tender quietly embeds clauses that reshape risk ownership in ways contractors cannot ignore. The real test will emerge in how bidders price uncertainty against guaranteed offtake.
 
2) Brownfield LPG retrofit complexity drives bid hesitation
8The project demands integration within a live LPG terminal without disrupting operations. This raises execution and safety risks beyond typical greenfield consultancy scopes. The extension suggests bidders are recalibrating technical strategies before committing.
 
3) Gamma scanning tender exposes a shrinking pool of radiation-certified vendors
8A routine diagnostic contract is revealing a deeper supply constraint. Only a handful of AERB-accredited players can realistically compete. The extension hints at how thin this market has become.
 
4) IOCL’s ethanol push meets tighter legal grip
8A relatively small process package now carries a disproportionately heavy contractual framework. The shift reflects a broader tightening across PSU procurement. Execution may no longer be the hardest part—compliance might be.
 
5) Corrigendum sharpens control over the DHT, FGATU and ARU TA contract while preserving a 50 percent scale-up lever
8The corrigendum does more than push the calendar on the DHT, FGATU and ARU turnaround package. It consolidates the governing ATC layer and quietly hands the buyer a 50 percent quantity-or-duration lever that can reshape execution economics after award. For shutdown contractors, the real story is not the date extension but how much risk now sits inside a bid that already spans high-pressure, discovery-prone refinery work.

Click on Details for more
Details
8A daily roundup of tender results in the oil and gas sector.
8Stay informed about contract awards, winning bidders, and project allocations over all oil & gas contracts.
Click on Reports for more. Details
8Get all the latest tenders announced across the oil and gas industry today.
8Discover new procurement opportunities from key public and private sector players.
Also click on the Tenders section for more detailed documentation
Click on Reports for more. Details
For reference purposes the website carries here the following Newsclips (These are public domain newsclips and the website is not responsible for their content):
8AG&P LNG takes over cap MEP import terminal in Vietnam Details
8Burckhardt compression wins several orders for LNG terminals in Thailand and Taiwan Details
8How India can strategically shift to electric cooking at scale Details
8Why India’s oil and gas exploration architecture confronts a shortage of offshore rigs Details
8Us scales up biogas opportunity, ABC data shows Details
8Bwssb to extract biogas from sewage sludge Details
8Cleanmax to supply hybrid renewable power to shell’s LNG terminal and technology centre in India Details
8Deendayal port aids lng tank dispatch by inox India to bahamas Details
8India steps up LNG push with shipment flag-off from US Details
8West Asia on edge after trump hints at Iran bombardment Details
8Prolonged energy disruption to widen India trade deficit, strain fiscal account, moody's says Details
8India reviews safety of its ships after hormuz firing Details
8Household LPG sales fall 8% in march Details
8Iran-us war: strait of hormuz disruptions have implications for India, says Rajnath singh Details
8Us retail sales rises 1.7% mom in march driven by gas price spike due to the Iran war Details
8Oil touches $100 on uncertainty over west asia ceasefire Details
8India ramps up PNG adoption with over 5 lakh new connections Details
8Un agency prepares hormuz evacuation plan for hundreds of ships Details
8War in Iran is causing biggest energy crisis in history, IEA says Details
8India's march crude imports slide on Iran war, Russian volumes hit record high, data shows Details
8Ongc wins platinum award at EEF global sustainability champion awards 2026 Details
8GAIL begins PNG supply to historic benares club in Varanasi under CGD project Details
8Engineers India signs tripartite agreement with Rtas Details
8ONGC bids farewell to director (finance) vivek tongaonka Details
8India keeps domestic fuel prices stable despite rise in global crude market : govt Details
8Citizens in Bengaluru turn to roadside trees for firewood amid LPG shortage Details
8Maharashtra, up lead in PNG sign-ups after government push Details
8Iran war has cost the world $50 billion of lost oil supply, so far Details
8Ukraine strike halts oil processing at novokuibyshevsk refinery Details
8Iraq turns to risky overland routes as oil exports collapse Details
8Us forces board Iranian oil tanker in Indian ocean Details
8Us waiver set to keep Russian oil exports to India near record high Details
8Nitin Gadkari calls for 100% ethanol blending in India amid west Asia oil crisis Details
8Iran oil tanker defies us blockade; it likely went from India Details
8Fuel rations and free buses: how countries have responded to rising oil prices Details
8From crisis to control, India ramps up oil and gas production: RBI governor Details
8Oil India subsidiary OGEL signs green energy MOU with numaligarh refinery Details
8India expands Russian insurers to secure oil shipping cover Details
8Strait of hormuz blockade: India, china’s alternate oil supply cushion fades as Russian crude on water runs low Details
You can also click on Newsclips for more
Details
8Project Name: Burdwan District City Gas Distribution
8Project Cost: Rs 250 crore Click here for more details Details
8Project Name: Kozhikode & Wayanad District City Gas Distribution
8Project Cost: Rs 300 crore Click here for more details Details
It is easy to get month-old import data but it is difficult to solicit forthcoming shipment information in India. We go through a laborious process of data collection to get you full import information, including company-wise, quantity-wise, port-wise, vessel-wise cargoes which are coming into India in the next 15-to30 days.
Get the daily updates for :
8LNG
8Crude
8Chemicals
8LPG
8Ammonia
8Coal & Coke
8All tankers
8Bulk and Dry cargo

Click on Reports for more. Details
New Page 1 8Avg logistics forms lng-focused joint venture, signaling a fresh push into new-age transport logistics [AVG] Details
8India’s city gas network widens sharply, with cng stations already overshooting rollout targets [PNGRB] Details
8United drilling lands ongc order for stabilizers, sharpening its grip on oilfield equipment market [UDTL] Details
8Afcons confirms full utilisation of commercial paper proceeds, reiterates compliance with listing norms [Afcons] Details
8Praj matrix unveils advanced fermentation lab to power india’s next-gen bioeconomy push [Praj] Details
8Oil india arm seals renewable energy pact with nrl to fast-track net-zero push [OIL] Details
8Vedanta sets may 1 record date to spin off four businesses and advance sweeping reorganisation [Vedanta] Details
8Indianoil board sees exit of government nominee director esha srivastava after deputation ends [IOCL] Details
8Iex says share slide followed public cerc draft on market coupling, denies undisclosed trigger [IEX] Details
8Government moves to shield rural schemes, fuel supplies and seafarers amid west asia turmoil [PIB] Details
Details
8Here's what's happening today in the E&P, midstream-downstream, and CGD section
Click on Reports for more Details Details
8Find out why there is a lobby that wants it re-tendered
8And also what is happening with the file in the DOF Details
8A daily roundup of tender results in the oil and gas sector.
8Stay informed about contract awards, winning bidders, and project allocations over all oil & gas contracts.
Click on Reports for more. Details
8Get all the latest tenders announced across the oil and gas industry today.
8Discover new procurement opportunities from key public and private sector players.
Also click on the Tenders section for more detailed documentation
Click on Reports for more. Details
For reference purposes the website carries here the following Newsclips (These are public domain newsclips and the website is not responsible for their content):
8Sterling and wilson renewable bags rs.3,550 crore solar EPC orders Details
8Excise waiver lifts biogas outlook as industry sees Rs 1 lakh crore investment potential Details
8Suzuki producing biogas auto fuel from cow dung in India Details
8Bengaluru set to roll out india’s largest sewage-to-biogas project Details
8Mcx gets SEBI nod to start coal exchange subsidiary Details
8Juniper green begins commissioning of india’s first FDRE project Details
8Core sector output contracts in march on west asia war Details
8Domestic production of oil, gas ramped up amid west asia crisis: RBI governor Details
8Jd vance to visit Pakistan on tuesday for second round of peace talks as ceasefire deadline nears: report Details
8Oil falls on expectations us-iran talks likely to proceed, opening supply Details
8Trump claims us 'winning' against Iran ahead of crucial talks in islamabad Details
8Inauguration of Rajasthan refinery by pm Modi gets postponed after fire incident Details
8Truckers brace for diesel price hike amid west Asia tensions: report Details
8Fire breaks out at rs.79,450 crore Rajasthan refinery a day before pm Modi’s inauguration Details
8Pm Modi to inaugurate rs.79,450 cr refinerypetrochemical complex in Rajasthan on april 21 Details
8India seeks to cool war’s oil burn with flex-fuel shift Details
8Iranian forces launch drones toward us warships after attack on commercial ship in sea of OMAN: IRAN media Details
8Iran war deepens china's dependence on us for niche gas amid supply shocks Details
8Oil tankers transiting strait of hormuz since start of iran war Details
8South korea and India to strengthen cooperation on naphtha and LNG supply chains Details
8Deendayal port handles LNG tank export to bahamas Details
8Gail to take 25% equity in kakinada lng project Details
8Cleanmax secures 30 mw hybrid renewable power contract with shell in India Details
8Noida starts camps in factories to supply 5kg cylinders Details
8Png shift gains pace: over 39,000 users surrender LPG connections amid supply pressure Details
8Gas shortage bites households as 2nd cylinder requests put on hold Details
8Iran has closed strait of hormuz completely: what does this mean for India’s crude oil, LPG, LNG supplies? Details
8No LPG shortage in Mizoram: IOCL Details
8West Asia conflict | oil price volatility lends evs a strategic charge in India Details
8Omv buys crude oil from emergency reserve to stabilize market, Austrian ministry says Details
8Numaligarh refinery signs renewable energy Mou with oil green energy Details
8Oil India announces renewable energy Mou with Numaligarh refinery Details
8Reliance, essar top bidders for coal-based methane gas exploration blocks Details
8Oil green energy signs mou with numaligarh refinery Details
8India mulls nationwide e85 flex fuel vehicle push to cut oil import dependency Details
8Oil arm OGEL signs mou with NRL to boost renewable energy portfolio Details
8India broadens Russian shipping insurance access to secure oil shipments Details
8India, Sri lanka discuss oil pipeline, boost strategic energy cooperation Details
8Domestic production of oil, gas ramped up amid west Asia crisis: RBI Guv Details
8India boosting domestic production of oil and gas, diversifying imports amid west asia tensions: rbi governor sanjay malhotra Details
8Oil is no longer trading like a market Details
8The U.S. -Iran deal, the deadline, and the $200 per barrel of oil question Details
8Perfectly-timed $1 billion wagers tied to Iran war raise suspicion Details
8Oil prices rally as U.S. -Iran tensions escalate Details
8U.S. wants to boost energy exports to India. it will be tough Details
You can also click on Newsclips for more
Details
8Project Name: Hyderabad District City Gas Distribution
8Project Cost: Rs 300 crore Click here for more details Details
8Project Name: Vijayawada District City Gas Distribution
8Project Cost: Rs 350 crore Click here for more details Details
8And the system is starting to break at the edges
Click on Details for more Details
It is easy to get month-old import data but it is difficult to solicit forthcoming shipment information in India. We go through a laborious process of data collection to get you full import information, including company-wise, quantity-wise, port-wise, vessel-wise cargoes which are coming into India in the next 15-to30 days.
Get the daily updates for :
8LNG
8Crude
8Chemicals
8Fertilizers
8LPG
8Ammonia
8Coal & Coke
8All tankers
8Bulk and Dry cargo

Click on Reports for more. Details
8The pricing pattern signals disciplined bidding rather than reckless undercutting despite heavy contractor-side risk.
Click on Details for more Details
1) IOCL narrows SERPL Paradip pipeline security race to two bidders after 50% technical disqualification
8The filtration signals tightening compliance expectations in RoW surveillance contracts. What remains unclear is whether reduced competition will impact price discovery.
 
2) BPCL tightens control in mumbai refinery consultancy tender with value-capped flexible engineering model
8The tender quietly shifts engineering risk downstream. A flexible scope hides a tightly controlled commercial structure. The real impact lies in who can survive the uncertainty.
 
3) IOCL narrows field to five qualified bidders in in LPG pipeline HAZOP and QRA tender amid strict technical filters
8The filters were not about price but about capability, compliance, and ownership of tools. What remains is a sharply defined competitive field where execution risk will shape the final outcome.

Click on Details for more
Details
1) HPCL mandates on-site sludge processing infrastructure with vendor-funded setup
8The payoff depends on recovery efficiency and sludge consistency.
 
2) Owner shifts utility project risk almost entirely to vendor nitrogen plant tender
8The risk asymmetry could reshape how bidders price even small downstream utility contracts.
 
3) NRL’s sulphur forming unit tender gets extension, but Numaligarh expansion keeps the original risk-transfer spine
8NRL has pushed the SFU bid deadline by 32 days, but the real story is not the calendar.
 
4) Sulphur pelletizer tender sees three extensions, signalling vendor constraint in high-spec refinery upgrade
8Three deadline shifts in under a month point to more than routine delays.
 
5) RTO tender extensions and cybersecurity-heavy amendments tighten vendor risk in multi-refinery optimization project
8This is no longer just about optimization—it is about control, cybersecurity, and long-term accountability. Multiple extensions and tighter qualification norms hint at deeper execution challenges beneath the surface. What looks like a digital upgrade may actually reshape how refinery contracts allocate risk.

Click on Details for more
Details
1) NRL extends vertical pump tender deadline amid compliance friction
8A short extension in a limited tender is rarely just about time. It signals deeper friction inside a tightly controlled vendor pool. The implications go beyond scheduling into bidder strategy and project pacing.
 
2) Owner tightens execution control in SRU-1 shutdown tender while shifting compliance burden to contractors
8The tender looks routine until the risk allocation is unpacked. Critical scopes stay with the client, but execution liabilities quietly shift outward. The result is a contract that rewards readiness but punishes miscalculation.
 
3) IPA-propane-sulphuric acid market-study tender stretches past the original deadline
8The real signal is not the delay alone, but what it implies about scope clarity, bidder depth and risk transfer in advisory tenders.
 
4) HPCL’s latest corrigendum resets the live annexure pack and doubles the option-clause swing for the FCCU II, FGD II, & OCO Boiler turnaround
8HPCL’s latest corrigendum on the FCCU II, FGD II, and Old CO Boiler turnaround is more than a paperwork refresh. It moves the bid onto a superseding annexure pack and quietly widens the owner’s post-award flexibility. For turnaround contractors, that changes where the real risk now sits.
 
5) Owner resets contractual framework in SAF ISCC CORSIA certification tender with full ATC override
8A complete reset of bid conditions is rarely routine

Click on Details for more
Details
1) CPCL Manali ETP-IV and DMRO tender corrigendum shifts O&M risk
8What looks like routine flexibility could reshape how contractors price O&M volatility. The real impact lies in how far bidders are willing to absorb uncertainty.
 
2) Refinery resets contractual terms while extending shutdown manpower tender timeline
8A routine extension masks a deeper contractual reset
 
3) Naphtha Cracker inserts revised refinery SCC in corrigendum for rotary shutdown rate contract
8The corrigendum does not alter the shutdown scope, but it changes the legal-commercial frame around it.

Click on Details for more
Details
8The tender wasn’t just delayed—it was stretched across months without closure.
8That pattern signals more than bidder hesitation; it reflects structural discomfort with BOO risk allocation.
8The cancellation now raises a larger question: is the hydrogen contracting model itself premature?
Click on Details for more Details
8The gap between ambition and readiness is starting to show.
Click on Details for more Details
8That changes how serious bidders will price administration, liability, and follow-through.
Click on Details for more Details
8The real test lies in whether the market sees value beyond pilot-scale innovation.
Click on Details for more Details
8India’s SAF ambitions are moving faster than the technology market can support.
Click on Details for more Details
8A hydrocarbon project just invited metallurgical contractors to the table. The line between gas processing and heavy industry EPC is beginning to blur. The consequences for pricing power and execution discipline are still unfolding.
Click on Details for more Details
8Vendors selected here will be embedded into IOCL’s downstream technology packages. That changes the strategic stakes for participation.
Click on Details for more Details
8This is a limited tender, but it is not a relaxed one.
Click on Details for more
Details
8The tender ties the vessel directly to SBM-linked crude receipt, storage, and refinery discharge.
8That changes the commercial meaning of tanker availability.
Click on Details for more
Details
8There was a razor-thin 0.1% gap separates the top two bidders
Click on Details for more Details
1) ONGC’s G1 manifold and GM-01 subsea tie-in tender gets a date-only corrigendum, not a risk reset
8ONGC has moved the calendar, but not the contract philosophy.
8The G1 manifold and GM-01 subsea tie-in package still asks bidders to carry a full EPCIC burden across surveys, subsea hardware, offshore installation and close-out discipline.
8The real story is what a modest date shift says about bidder bandwidth in a technically layered offshore tender.
 
2) Oil India Limited’s Nagajan new OCS corrigendum tightens third-party qualification checks while pulling the pre-bid process forward
8A schedule change is the visible part of this corrigendum, but it is not the real story.
 
3) ONGC had to rewrite core capacity logic after bidders exposed a mismatch at Lakhmani GGS-4
8ONGC’s gas compression tender was not merely clarified; it had to be corrected at the level of contracted capacity.
 
4) ONGC extends RJP MOPU tender after easing life, BEC and mobilization terms
8ONGC’s RJP MOPU tender is no longer the same hard-edged package it first put out.
8The promoter has cut design-life and experience hurdles and stretched mobilization, but it has refused to ease the clauses that really govern contractor pain once the asset is on risk.
 
Click on Details for more
Details
8The deeper story lies in how public procurement norms are being overlaid on proprietary refinery ecosystems.
Click on Details for more Details
1) Jorkian potash DPR tender shifts the consultant from report writer to mine-development gatekeeper
8The E&P operator is not just buying a DPR for the Jorkian potash block; it is outsourcing a large part of the technical logic that will decide whether the project becomes an underground mine or a solution-mining play.
8The tender knits together legacy-data review, live exploration oversight, mineral test-work strategy, and mine-planning architecture in a way that sharply raises both entry barriers and accountability.
 
2) Qualified field-capability bidders dominate ONGC Assam Asset’s 22 preheater maintenance tender as documentation-heavy clauses narrow the field
8ONGC Assam Asset’s three-year preheater maintenance tender is built less like a routine service contract and more like a controlled brownfield reliability package.
8Two bidders cleared, one fell out, and the readable documents show why execution hardware, method discipline and compliance depth matter more here than title-level eligibility.
 
3) Six of nine clear ONGC’s MBA Basin cementing O&M screen as scope-heavy uptime risk keeps the field narrow
8Find out more
 
4) ONGC’s latest corrigendum on the B&S and NH valve AMC eases timeline stress but preserves single-point contractor risk
8ONGC has yielded where the execution maths became hard to defend, but not where contractor accountability would dilute.
8The latest corrigendum stretches one key timeline and sharpens several technical clarifications without reopening the tender’s core risk-transfer model.
8What looks like relief on paper may still leave bidders carrying the harder offshore burden.
 
5) ONGC’s MH Asset bridge refurbishment corrigendum removes hybrid pre-bid access and deletes phased performance security relief
8ONGC has not redrawn the bridge package, but it has redrawn the bidder’s commercial runway.
8One change narrows access to the clarification room, and the other removes a softer path to performance security funding.
8The engineering scope stays offshore and unforgiving, but the corrigendum shifts where the real pressure sits.
 
Click on Details for more
Details
8High-skill environmental risk studies are being evaluated on lowest price alone.
8This creates a tension between compliance quality and cost compression.
Click on Details for more Details
‹ First  < 2 3 4 5 6 >  Last ›

Showing 151–200 of 435 items