A certain kind of adhocism has crept into the running of Cairn India Ltd 8A norm is decided one day and then changed immediately the next day And that seems to be sending the wrong signals all around
Details
8Project Name:Srikakulam, Vishakhapatnam and vizianagaram Districts City Gas Distribution 8Project Cost: Rs 300 crore Click here for more detailsDetails
Rs. 31000 crore greenfield thermal power project: RFQ ahead 8Civil works are in progress for the chimney and cooling tower. 8Erection and installation of ESP have been completed. 8RFQ for the separator system package is likely to be floated in March 2024 Rs. 1600 crore greenfield hydel project: RFQ ahead 8CWC has approved the hydrology report. 8Forest clearance (stage-1) is pending at DFO. 8RFQ for the civil work package (lot-1) is likely to be floated in Q2 2024 Rs. 6664 crore greenfield pumped storage project: RFQ ahead 8Preparation of the EIA/EMP report is in an advanced stage for completion. 8Bid evaluation is in progress for PMC package. 8RFQ for the civil work package is likely to be floated in Q3 2024 Get exclusive headlines from our energy sector coverage: 8Adani's LT cables tender: Big response 8These states plan to establish new coal based power projects, totaling about 5 GW and project activities are on 8Local Manufacturing: China and India will have manufacturing cost leadership for electrolyzers 8MPLS Technology: Vendors fail on Make In India requirements 8FGD package tender runs into trouble 8700 MW Hydro Electric Project: Delayed further 8Delhi: Trying new ways to boost Renewable Energy utilizations 8REC introduces new provisions for development of this green energy transmission project Get in touch with us for more on these storiesDetails
This FPSO outfit has three such units deployed in India 8Find out more on how the FPSO economics work, and how a foreign company trucked up with an Indian counterpart to do big business Click on Details for more.Details
2G bioethanol plants at Numaligarh and Panipat may have a critical shortage of a vital raw material. 8And it is not feedstock, which is bamboo and straw respectively for the two units, that we are talking about. Click on Details for more.Details
Nano Urea Green field Project 8Cost: 257 Cr. 8ProjectEvent: : The Pre-Qualification Request for Electrical ELV, Instrumentation work and Mechanical Works has been out and bid due date is March 9, 2024. The Pre-Qualification Request for Civil Work Contractors has been released, and bids must be submitted by March 6, 2024 NPK Pilot Plant Greenfield Project 8Cost: 90 Crore 8Project Event: The procurement of equipment and services is likely to be started from March 2024; the company will use in-house patenedt technology for the project.Details
For reference purposes the website carries here the following tenders: 8Supply of flame retardant power cables Details 8Tender for engagement of third party inspection agency (TPIA) for PCSA audit Details 8Procurement of fittings Details 8Tender for inspection, repair and calibration of M/s. easy laser make laser alignment kits Details 8Annual Rate Contract for CG make drives Details 8Supply of demulsifier Details 8Appointment of consultant for carrying out detailed feasibility report (DFR) Details 8Supply of compressed bio gas (CBG) Details 8Laying of MDPE network and associated works in CGD project Details 8Procurement of UPS spares Details 8Supply, installation, commissioning and training of CFR RON/MON XCP engine Details 8Tender for mechanical works Details 8Hiring of operation maintenance OM Services for 02 units surface production facility SPF packages Details 83 Years Annual Rate Contract for Cathodic Protection System maintenance Details 8Hiring service for legacy waste dumpsite remediation and processing of daily waste Details 8Tender for beverage grade liquid carbon-DI-Oxide CO2 Details 8Hiring of services for operation and maintenance of CGD networks Details 8Tender for conducting T4S audit for city gas distribution (CGD) network Details 8Tender for equipment and manpower supply as and when required Details 8Procurement of batteries for electrical forklifts Details 8Supply of metaflex couplings Details 8AMC services for M/s honeywell makes DCS and PLC system Details 8Supply of spares of ametek make analysers for for old SRU unit Details 8Procurement of spares of air compressor and dryer system Details 8Supply of pump spares Details 8Supply of mechanical seal spares Details 8Procurement of batteries for electrical forklifts Details 8Procurement of spares of vertiv make precision air conditioners installed Details 8Tender for TAS modification works Details 8Supply of BLES spares Details 8Supply of flame retardant power cables instrumentation and electrical Details 8Procurement of spares of vertiv make precision air conditioners installed Details 8Supply fabrication and erection of fire water pipeline and allied works Details 8Tender for transportation of indane LPG cylinders in vertical position on unit Details 8Supply of pump spares Details 8Procurement of centrifuge tube, centrifuge equipment ,calibrated flowmeter for gum bath equipment Details You can also click on Reports for more For reference purposes the website carries here the following Newsclips: 8Global LNG demand seen rising in 2024 from China, Europe Details 8Woodside signs 15-year LNG supply deal with Korea Gas Corporation Details 8BPCL ropes in Neeraj Chopra as brand ambassador Details 8HPCL orders 1500 DC chargers from Servotech Details 8HPCL and University of Birmingham partner to launch revolutionary hydrogen transport project Details 8The rally in HPCL, BPCL, IOC leaves the street divided at extreme ends Details 8Green Hydrogen sector needs $4-12 billion in government support to stay competitiveDetails 8Canadian oil and gas producers bump up spending, industry group says Details 8Rudra Gas Lands Rs 9.96 Cr orders from HPCL for pipeline projects in bihar,rajasthan Details 8ONGC incorporates wholly owned subsidiary for green energy and gas biz Details 8GAIL’s biogas plant to start in March: Now corporation is busy collecting garbage, 150 metric tons required daily, only 60% received Details 8Qatar's bigger LNG expansion to squeeze US, other rivals Details 8M Shyamprasad Kamath will lead MRPL as MD Details 8PM Narendra Modi unveils India’s first hydrogen fuel cell ferry at Cochin Shipyard Details 8Boosting India's Energy Self-Reliance with Biogas: A Promising Green Path Details 8Cochin Port Union urges CPA to maximize revenue from created assets Details 8Telangana govt implements Rs 500 LPG cylinder scheme – Know who can avail it Details 8Goverment Scheme: Get free lpg connections to your home from pradhan mantri ujjwala yojana Details 8Supplies of diesel, LPG badly hit in Punjab due to farmers' protest Details 8US sanctions to damage India’s oil supply from Russia Details 8Oil India to consider second interim dividend for FY24 on March 8 Details You can also click on Newsclips for moreDetails
It is easy to get month-old import data but it is difficult to solicit forthcoming shipment information in India. We go through a laborious process of data collection to get you full import information, including company-wise, quantity-wise, port-wise, vessel-wise cargoes which are coming into India in the next 15-to30 days. Get the daily updates for : 8LNG 8Crude 8Chemicals 8Fertilizers 8Coal and Coke 8LPG 8Ammonia 8All tankers 8Bulk and Dry cargo 8Port Update Click on Reports for more.Details
8EXMAR and ENI celebrate congo’s first LNG cargo [Exmer] Details 8Gas introduced into Tango FLNG facility, Republic of Congo [Exmer] Details 8An evening of architectural dialogue with pritzker prize-winning architect peter zumthor at the royal opera house, mumbai [Essar] Details 8Decarbonisation a key imperative for sustainability [Essar] Details 8India is on high-growth trajectory to achieve its development goals by 2047: Minister Hardeep S Puri [PIB] Details 8Trading & Settlement Calendar for March’ 2024 and launch of additional contracts [IGX] Details 8Resignation of Chief Executive Officer (CEO) [MRPL] Details 8Intimation of Changes in Senior Management and office of Managing Director [MRPL] Details 8Change in Directorate of the Company [Adani Port] Details 8Companies to merge respective digital streaming and television assets in India [RIL] Details 8Board Meeting Intimation [OIL] Details 8Change In Senior Management [OIL] DetailsDetails
Ammonia-Urea Annual Maintenance Project 8Cost: 10 Cr. 8ProjectEvent: RFQ for the emergency miscellaneous civil works including shutdown jobs in ammonia-urea plants has been out and bid due date is 1 March 2024. RFQ for miscellaneous civil maintenance works for the factory for the year 2024 April 2025) at RCF. It has been out and bid due date is February 29th, 2024 NP (20:20:0:13) Fertilizer Expansion Project 8Cost: 220 Crore 8Project Event: The RFQ for Programming, Testing, Installation and Commissioning of PLC, HMI, Relays and auxiliaries in existing control panel for NP A and B Streams has been out and bid due date is March 02nd 2024.Details
8GE T&D India Ltd. secures multi-crore orders from Power Grid Corporation of India for grid modernization projects [GET&D] Details 8Incorporation of wholly owned subsidiary “ONGC Green Limited” [ONGC] Details 8Execution of Shareholders’ Agreement with 3EV Industries Private Limited, Founders, Promoters and other shareholders of 3ev [MGL] Details 8Disney and Reliance said to have signed binding merger pact [RIL] Details 8Oil India announces global partner Roadshow in Abu Dhabi ‘Confluence: Where energy and opportunity converge [OIL] Details 8New closing date for well fluid tender Details 8Analysts’ Meet 2024 – Agenda and Presentation(s) [Vedanta] Details 8Investor Meet - Intimation [DIL] DetailsDetails
This petrochemical company is planning a major naphtha-based backward integration 8And that will keep consultants, PMCs and EPC contractors looking out for business Click on Details for more.
Details
Eventually try as hard we can, India cannot run away from grappling with carbon capture and storage. 8What are the main commercial and non-commercial risks associated with CCS? 8What are the incentive mechanisms, regulatory and legal frameworks, types of industry and ownership structures, and public-private partnerships that are likely to emerge in different parts of the world to mitigate these risks and enable viable business models to scale up the technology? 8Given that countries have different natural resource endowments, regulatory frameworks, and economic structures and as CCS can be applied to different industries (e.g. cement, steel, oil and gas, power, and chemicals), emergent business models can differ substantially across countries. Click on Reports for more
Details
India was placed well below other countries when it comes to being ranked as suitable for green hydrogen production 8But a new study places it as no.2 in the world 8How has that happened? Click on Reports for more
Details
Get a full idea of what the implications of the US ban on LNG exports to countries such an India will imply 8How many US projects are impacted? 8There are no short or medium term impact, but the long outlook may be affected Click on Reports for more
Details
Due to droughts and restrictions on vessel transits at the Panama Canal, the volume of LNG shipped via the Panama Canal declined by two-thirds between August 2023 and January 2024, and could fall to zero in February. 8As a result of Houthi attacks on vessels in the Red Sea, no LNG cargoes have traversed the Red Sea since 12 January 2024. 8Here is a full analysis of what happens next Click on Reports for more
Details
The 2G ethanol plant that IOCL is setting up in Panipat refinery seems to be running into some real problems 8Find out what they are? Click on Details
Details
Rs. 11000 crore greenfield hydel project: RFQ ahead 8HRT and TRT works are in progress 8HM work contractor has started the mobilization work. 8RFQ for the EM works package is likely to be floated in Q2 2024 Rs. 7506 crore greenfield pumped storage project: RFQ ahead 8Geotechnical investigation and topographical works are in progress 8RFQ for the PMC package is likely to be floated in April 2024 Get exclusive headlines from our energy sector coverage: 8700 MW Hydro Elecric Project: Low competition 8India's coal clean technology company signs MOU with Germany’s technology provider 8Adani & TotalEnergies Partnership: Get the latest development 8Paisalo Digital gets Rs. 200 crore for lending towards E-Mobility Sector 8Coal sector contributes over Rs. 70000 crore annually to the central and state governments 8Get the latest development by Apraava energy towards India's net zero target Get in touch with us for more on these storiesDetails
For reference purposes the website carries here the following tenders: 8Annual rate contract for maintenance of control systems DCS AND PLC installed Details 8AMC for anton paar make auto KV and auto densitometer Details 8Tender for road transportation of packed lubricants greases specialties additives Details 8Design, supply, installation, testing, and commissioning of HVAC, cold room, VRF system including allied piping and electrical works Details 8Tender for terminal automation system jobs Details 8Procurement of benchtop high pressure microreactor system Details 8Tender for TAS revamping Details 8Supply, erection, installation and calibration of board and float type level indicators Details 8Tender for 62.5 KVA diesel engine driven generating set Details 8ARC for hydrotesting of CNG cascade 3000WL Details 8Supply of ABB make VFD card miscellaneous electrical materials Details 8Tender for solar system Details 8Tender for transformers Details 8Procurement of pump spares for sea water intake pump Details 8Supply of high pressure water hose spares Details 8Annual rate contract for carrying out replacement of oval header plates and TLE tubes of SRT-VI heaters of NCU Details 8Supply of critical spares for HTPC carousels and allied equipment Details 8Supply of sampling systems Details 8Tender for statutory testing of 08 Nos of LPG underground storage tanks Details 8Supply of auxulary lube oil pump for DR make compressor Details 8Supply of spares for ROTORK make actuators Details 8ARC for preventive maintenance of siemens make HT panels and VCBs Details 8Supply of spectacle blinds Details 8AMC for operation and maintenance of FDA system Details 8Tender for conversion of existing EFR tanks to IFR tanks (MS PRODUCT) with mild steel cone roof along with allied miscellaneous works Details 8Tender for security and allied services Details 8Annual rate contract of M/s IPCO process and belt technology india private limited for repair, maintenance and replacement of steel belts coolers installed Details 8Supply of cable trays and ducts Details 8Procurement of spares of indmax slide valves Details 8Tender for providing strappling service of containerized open truck Details 8Procurement of burner tips installed in furnance Details 8Annual maintenance contract of ABB make DCS/PLC systems installed Details 8ARC for instrumentation maintenance services Details 8Procurement of refractory material Details You can also click on Reports for more For reference purposes the website carries here the following Newsclips: 8PM Modi to launch India’s first hydrogen fuel cell ferry today Details 8Qatar Energy names first LNG carrier of its fleet expansion program ‘Rex Tillerson’ Details 8MC Explains: How did IOC's inaugural green hydrogen project reach Delhi HC's corridor? Details 8Oil gains over $1 on possible shipping disruptions Details 8TN's VOC Port will be India's first green hydrogen hub: Sonowal Details 8Oil regulator for opening ATF pipelines at airports Details 8Sustainability in the oil and gas industry in 2024 Details 8BPCL hosts a workshop on compressed biogas Details 8Heath Consultants and Maharashtra Natural Gas Limited (MNGL) to partner on low-emission operations Details 8Taliban ready to advance TAPI gas pipeline project in Afghanistan Details 8EIL and IOCL achieves a major milestone Details 8Can Mukesh Ambani-led Reliance help with north india's air pollution problem? Details 8Russia bans gasoline exports for 6 months from March 1 Details 8Telangana CM formally launches two more guarantees: LPG cylinder refill at Rs 500 and up to 200 units free electricity Details 8Indian Auto LPG Coalition urges 5% GST, echoing Andhra Pradesh’s VAT cut on Natural Gas Details 8India’s bold move towards energy independence: CBG emerges as a gamechanger Details 8Conference urges Cochin Port to enhance revenue Details 8Displace Indian coal power with Canadian natural gas: report Details 8Two DMK men booked for abusing sub inspector, threatening sexual assault in Chennai Details 8Qatar en route to hold quarter of global LNG market b 2030 Details 8Vitol Inks 10-Year LNG Deal with EOG Details 8Are Indian Oil Marketing Companies Overvalued? Details 8Indian Oil launches premium fuel Details 8Oil India Limited inks pact for earth science related studies in northeast region Details 8Oil India rises on inking tripartite MoU with NCS, CES & HS Details 8India will take up deep sea exploration this year, say experts Details You can also click on Newsclips for moreDetails
It is easy to get month-old import data but it is difficult to solicit forthcoming shipment information in India. We go through a laborious process of data collection to get you full import information, including company-wise, quantity-wise, port-wise, vessel-wise cargoes which are coming into India in the next 15-to30 days. Get the daily updates for : 8LNG 8Crude 8Chemicals 8Coal and Coke 8LPG 8Ammonia 8All tankers 8Bulk and Dry cargo 8Port Update Click on Reports for more.Details
8Corrigendum: Malkapur-Hyderabad International Airport Petroleum & Petroleum Product (AT) Pipeline (MHAPL) [PNGRB] Details 8Intimation of Schedule o Analyst / Institutional Investor meetings [Aegis] Details 8OIL inked a tripartite MoU with NCS and CES & HS [OIL] Details 8Notice of Postal Ballot [BPCL] Details 8Fines from stock exchanges [BPCL] Details 8L1 Bidder selected for Monitoring Ambient Air Quality and Emissions at OIL Installations Details 8Disclosure of Inormation Under Regulation 30 Of SEBI [IOCL] DetailsDetails
Rs. 1750 crore greenfield multipurpose project: RFQ ahead 8Bid evaluation is in progress for the hydro-mechanical work. 8RFQ for the EM work package is likely to be floated in Q2 2024 Rs. 4252 crore greenfield pumped storage project: RFQ ahead 8Bid evaluation is in progress for the DPR consultant. 8RFQ for the PMC package is likely to be floated in March 2024 Rs. 7855 crore greenfield pumped storage project: RFQ ahead 8A tender has been floated for the geotechnical investigation and topographical works. 8RFQ for the SIA consultant is likely to be floated by April 2024 Get exclusive headlines from our energy sector coverage: 8A lot of EPC orders going to BHEL 812 MTPA PVUNL coal mine project: EC Delayed 81300 MW wind power project: Why was the tender cancelled? 8600 MW TANGEDCO FGD package: What is happening? 8This state PSU plans for setting up of supercritical units in place of its existing thermal power stations 8Renewable auctions: Private entities beat public sector players Get in touch with us for more on these storiesDetails
There are a limited bunch of seismic data acquisition companies in India 8And they bid in most tenders 8Here is a list of bidders for around 350 sq km of 3D seismic data for a current tender Click on Details for moreDetails
For reference purposes the website carries here the following tenders: 8Rate contract for M and I works Details 8Supply of HT extension panel Details 8Tender for expert service support by M/s UOP India private limited for troubleshooting and performance review of PSA system as installed Details 8Tender for comprehensive operation & maintenance of CGD PNG network Details 8Supply of bearings Details 8Tender for supervision assistance for overhauling the packinox exchanger Details 8Hiring of manpower for patrolling service of steel/MDPE network and operations Details 8Tender for MOV spares procurement and installation Details 8Annual maintenance contract for Yokogawa analyzers Details 8Tender for miscellaneous civil works Details 8AMC of cooling appliances, package ACs & cassette ACs Details 8Design, engineering, supply, installation, testing and commissioning of online gas detectors, multi-sensor detectors and heat detectors Details 8Tender for digital multimeters for electrical department Details 8Hiring of cloud services for upgradation of national data repository Details 8Supply of installation of parking shed (polycarbonate sheets) Details 8Supply of plug gaskets Details 8Supply of liquid nitrogen Details 8Procurement of spare compressor rotor for 206K2 for Elliott Ebara make Details 8Tender for contract for refurbishment reconditioning repair of STG-2 turbine rotor Details 8Supply of valves forged Details 8Tender for repair and rectification of CGPISL make 6.6KV 1160kW PP refrigeration compressor motor through the OEM, Ms. CG power and industrial solutions Details 8Tender for coating refurbishment of underground station piping Details 8Design, supply, installation, testing and commissioning of new CCTV system Details 8Annual maintenance contract for DBBV actuators Details 8Supply of spare for CLO (Slurry Oil) filter valves installed Details 8Supply of NIR analyzer Details 8Tender for electrification of AISF garrison Details 8Tender for invitation of offer to quote rate of interest for term deposit Details 8Tender for engagement of agency/consultant for conducting assessment and development centres and development planning Details 8Procurement of twin screw pump cartridges assembly of Tushaco make Details 8Supply of woodward governor control system spares Details 8Supply of dry air unit spares Details You can also click on Reports for more For reference purposes the website carries here the following Newsclips: 8European hydrogen bank pilot auction generates strong response with 132 bids Details 8NTPC expands Green Hydrogen initiative Details 8Indian Oil cancels tenders for 10 KTA-green hydrogen unit Details 8Minister Hardeep Singh Puri inaugurates IndianOil’s PNG project Details 8Qatar to boost gas output with new mega field expansion: minister Details 8RIL plans to spend Rs 5k cr on CBG Details 8Dolphin prepares semisub for drilling offshore India Details 8At least 3 recently-sanctioned tankers scheduled to supply Russian oil to India in coming weeks Details 8Oil extends losses in early Asian trade Details 8India's three-wheelers segment charged up with electric transition Details 8Rs 500 gas cylinders in State from tomorrow, details inside Details 8U.S. takes lead as the Europe’s top fuel supplier Details 8Report says Canada could offset 400% of emissions with LNG exports to India Details 8Why the transition to clean energy in the transportation sector has become imperative Details 8Ambani's quest for green energy can solve stubble-burning problem Details 8Woodfield Systems to invest $100 mn for manufacturing in India Details 8Telangana - Govt releases Rs 80 crore for LPG cylinder scheme Details 8Centre propose amendment in CMVR rules related to LPG retrofitting Details 8Inauguration of HPCL Varanasi LPG Bottling Plant by Prime Minister Narendra Modi Details 8Oil India Consolidated December 2023 Net Sales at Rs 10,912.61 crore, up 17.31% Y-o-Y Details 8Oil India signs MoU with NCS and CES & HS Details 8Several stage protest against GAIL near MSEZ gate; demand permanent employment Details 8Oil regulator for opening ATF pipelines at airports Details 8Crude oil dropped as IEA said that global oil demand is losing steam. Details 8BPCL restores long-dormant oil pipeline amid urban challenges Details 8Oil India to host global partner roadshow in Dubai Details You can also click on Newsclips for moreDetails
It is easy to get month-old import data but it is difficult to solicit forthcoming shipment information in India. We go through a laborious process of data collection to get you full import information, including company-wise, quantity-wise, port-wise, vessel-wise cargoes which are coming into India in the next 15-to30 days. Get the daily updates for : 8LNG 8Crude 8Chemicals 8Fertilizers 8Coal and Coke 8LPG 8Ammonia 8All tankers 8Bulk and Dry cargo 8Port Update Click on Reports for more.Details
Sulphur Coated Urea (SCU) Pilot Project 8Cost: Rs. 10 crore 8Project Event: The competition for the supply and erection of prefabricated gantries and their transfer tower includes Aishra Technofab Engineers, Bhansali Brothers, Enterprising Enterprise Llp, Piyush Enterprises, Radha Construction, Sgm Buildcon, and Shanz Powertechs Private Limited. The technical bids have been opened, and the financial bids are likely to be opened in March 2024. DAP/NPK & Phosphoric Acid Fertilizer Greenfield Project 8Cost: Rs. 1400 crore 8Project Event: The civil work has commenced, and the long lead item is currently being transported to the site. Erection work is expected to begin in Q2 2024.Details
The Indian gasification story is now looking better 8Find out what is the cost of unabated green hydrogen and also when CCS is applied 8Also, how many gasification projects are currently ongoing 8Further, how many are on the anvil. Click on Reports for more
Details
8Historic Milestone in Jharkhand: Foundation stone laid for HPCL’s Gas Network [PIB] Details 8Empanelment of HSBC Bank as Clearing Bank [IGX] Details 8Additional Session in Auction Market [IGX] Details 8Important contract awarded for pipeline station Details 8List Of State-wise shortlisted bidders for ethanol contracts Details 8Vinod Krishnan drives dialogue on digital transformation at ETCIO Spectrum Summit [Essar] Details 8Here is a bunch of wellhead and down-hole equipment required by an E&P company Details 8Crucial refinery maintenance works awarded Details 8Here are a bunch of contracts awarded by a refinery recently, get the names of the bidders along wth their L-1 ratees Details 8Inviting Views and Suggestions on the development of ATF Pipelines connecting Various Greenfield and Brownfield Existing and Upcoming Airports in India [PNGRB] Details 8Public Consultation Document on the Tariff of the North-East Natural Gas Pipeline Grid of the Indradhanush Gas Grid Ltd. under the provisions of Petroleum and Natural Gas Regulatory Board Tariff Regulations, 2008 [PNGRB] Details 8Disclosure of event or information under regulation 30 of SEBI [MRPL] Details 8Disclosure of event or information under regulation 30 of SEBI [RIL] Details 8Disclosure of event or information under regulation 30 of SEBI [OIL] Details 8Disclosure of event or information under regulation 30 of SEBI [GAIL] Details 8Revised Outcome of Board Meeting [GNRL] Details 8Update on Fund-Raising Committee Meeting [Swan] DetailsDetails
This CGG entity has employed an East European company to do its digitalization. 8What is the reason for doing so? 8Should other CGD companies tap this company too? Click on Details for more
Details
Gujarat Gas will have a big chunk of LNG long term contracts coming up for renewal 8Find out when and what kind of volumes are we talking about Click on Details for more
Details
Morbi is a classic case of competition between propane players and a gas monopoly 8The gas supplier now has an advantage as gas prices have fallen but it is not willing to reduce price to grab market share 8Making more money is now more important than gaining market share 8That is a new strategy, learnt through knocks suffered by the gas supplier Click on Details for more
Details
Mud and chemical handing for E&P projects is a local job 8Here is a list of companies doing that work in the North East Click on Details for more
Details
This city gas distribution company is finding a new way to dramatically increase the number of CNG stations in its geographical areas 8It is an interesting model that other CGD operators can study and perhaps implement Click on Details of more
Details
Ammonia-Urea Brownfield Project 8Cost: Rs. 16,372 crore 8Project Event: Jackson has been selected as the provider for the Emergency Genset, with a price bid of approximately Rs. 17 crore. For the 220 Kv Lilo GIS construction, Stelmec and Sterling & Wilson are the two competing bidders. The technical evaluation of their bids is currently underway. Due to a lack of qualified bidders, the deadline for submitting bids for grid connectivity to TFL to supply 90 MW of power through the line has been extended from February 20 to February 27, 2024. Nitric Acid Storage Tank Greenfield Project 8Cost: Rs. 50 crore 8Project Event: Technical bid currently underway. Details
It is easy to get month-old import data but it is difficult to solicit forthcoming shipment information in India. We go through a laborious process of data collection to get you full import information, including company-wise, quantity-wise, port-wise, vessel-wise cargoes which are coming into India in the next 15-to30 days. Get the daily updates for : 8LNG 8Crude 8Chemicals 8Fertilizers 8Coal and Coke 8LPG 8Ammonia 8All tankers 8Bulk and Dry cargo 8Port Update Click on Reports for more.Details
Rs. 5100 crore greenfield pumped storage project: RFQ ahead 8Re-investigation is underway way for TOR. 8RFQ for the EIA consultant is likely to be floated in April 2024 Rs. 7700 crore greenfield pumped storage project: RFQ ahead 8Project proponent fails to get TOR: Find out why? 8RFQ for the EIA consultant is likely to be floated in April 2024 Get exclusive headlines from our energy sector coverage: 8Rs. 160 crore transformer package has just handed out: What has happened with BHEL? 8Transmission projects: REC introduces new norms 8NTECL units revival is delaying: Is BHEL guilty? 8Talabira EPC contract: There was low competition 8What is India doing to bring down the cost of Green Hydrogen? 8HPCL awards Rs. 102 crore EV Charger order 8NLC Thermal Power Station II: Major modification is on the way Get in touch with us for more on these storiesDetails
For reference purposes the website carries here the following tenders: 8Tender for Analytik make consumables for carbon analyzer Details 8Annual maintenance contract of Tokheim make DUs Details 8Supply of dimethyl disulphide (DMDS) Details 8Supply of welker make analyser spares Details 8Supply of burner parts Details 8Supply and supervision of panel installation testing and commissioning Details 8Development of A site retail outlet Details 8Procurement of roto H plus lube oil Details 8Tender for electrical and heating, ventilation and air conditioning (HVAC) work Details 8Rate contract for servicing and maintenance of firefighting equipment Details 8Supply, testing and commissioning of automatic power factor control (APFC) panel with allied jobs Details 8Annual rate contract for TnI maintenance support Details 8Procurement of speed sensor Details 8Provision of CAMC for DBBV actuators Details 8Tender for contract for security and allied services Details 8Design, supply, installation and commissioning of electrical heat tracing system Details 8Tender for aluminium container 1 litre capacity with wooden box Details 8Supply, transportation, installation and commissioning of high mast Details 8Tender for acquiring payroll software for processing payroll and related applications linking with attendance Details 8Tender for laptops with intel/AMD processors Details 8Procurement of ESP power cable and MLE cable with socket Details 8Supply of FF temperature input multiplexer Details 8Procurement of safety relief valve Details 8Provision of lightning protection system Details 8Procurement of magnetic flow meter Details 8Laying of MDPE network and associated works in CGD project Details 8Tender for servicing of dump valve Details 8Supply and installation of aluminium inspection plug Details 8Design engineering package (BDEP) and other related services for revamp of petro FCC unit Details 8Tender for revamping of HT distribution system Details 8Charter hiring of 02 Nos. crew boats Details 8Tender for design & Re construction Details 8Hiring of courier agency for domestic, commercial and industrial customers Details 8Hiring of services for hazardous operability HAZOP integrated quantitative risk assessment QRA and fire gas mapping studies Details 8Hiring of tag database & report generation system Details 8Tender for rock bits Details 8Tender for roller cone bit Details 8ARC for RCC chimney repair work Details 8Tender for CCR regeneration package of cauvery basin refinery (CBR) project Details 8Supply of HGU sulphur guard adsorbent Details 8Supply of catalyst for chloride guard adsorbent reformate Details 8Tender for site grading works III Details 8Tender for tankage and associated works Details 8Supply of pipes alloy steel seamless welded Details 8Supply of foundation anchor bolts, connection bolts for structural steel Details 8Hiring of vehicle Details 8Supply of flanges CS Details 8Procurement of lube oil for HVJ compressor Details 8Laying and construction of U/G steel pipeline network and associated works Details 8Rate contract for procurement of MDPE Pipe Dia. 32mm and 63mm Details You can also click on Reports for more For reference purposes the website carries here the following Newsclips: 8Indian diesel diverts to Asia amid Houthi threat Details 8Pakistan approves construction of Iran-Pakistan gas pipeline amid fear of penalty Details 8First LNG vessel arrives at new German Mukran terminal Details 8Exploring India’s energy landscape amidst uncertainty Details 8Qatar plans to boost gas output with new mega field expansion Details 8Historic Milestone in Jharkhand: Foundation stone laid for HPCL’s Gas Network Details 8IOC, GAIL, ONGC fined again over board norms Details 8Deepak Gupta, Director (Projects), GAIL speaks at 18th National Convention of UN Global Action Details 8BPCL Kochi Refinery emerge winners of NIPM Young Managers’ Contest 2024 Details 8Waste processing unit planned to generate bioCNG, power Details 8Bio-CNG plant to come up at Ariyamangalam dump yard to process organic degradable waste Details 8CNG prices to drop in Andhra Pradesh from April 1 Details 8Confidence Petroleum joins hands with BW LPG Details 8PMUY cooking gas connections cross 100 million Details 8Pune gas completes LPG project for Taj Group Hotel in Arunachal Pradesh Details 8How LPG subsidy can be redesigned to privilege low-income households Details 8India's Ujjwala Scheme achieves milestone in empowering rural households with clean cooking fuel Details 8India exports $6.65B oil products from Russian oil Details 8Tankers Market: India a major player for seaborne crude oil tanker trade Details 8India's Jan oil imports hit record high on Red Sea delays, trade data shows Details 8Russia’s disrupted oil trade crimps margins for Indian refiners Details 8India’s crude imports at record high Details 8Libya's oil guards shut oil fields over pay dispute Details 8Mitsui O.S.K. Lines, soon to be a prized catch for GIFT City, in talks to build tanker at L&T yard Details 8NRL to integrate Green Hydrogen production, eyes net zero by 2030Details 8Dependence on fossil fuels on the wane Details 8State-Owned Indian oil and gas companies fined again for listing norm violations Details 8IOC, GAIL, ONGC fined for third straight quarter for failure to appoint directors Details 8US sanctions on Venezuela threaten to disrupt India’s crude oil imports Details 8India outperforms global average in UN sustainability goals: Hardeep Singh Puri at UNGCNI Convention Details 8Shell's LNG trading makes $2.4 bln in final 2023 quarter, sources say Details 8"India is trying to diversify": German Minister on oil purchase from Moscow Details 8Yogi govt gearing to produce CNG from stubble Details 8OIL inks MoU with FACT for green hydrogen Details 8Servotech wins order for 1500 DC fast EV chargers from HPCL and other OEMs Details You can also click on Newsclips for moreDetails
8Notice of Postal Ballot [OIL] Details 8Oil India Limited (OIL) signed MoU with The Fertilisers and Chemicals Travancore Limited (FACT) to collaborate in Green Hydrogen domain [OIL] Details 8Crucial refinery maintenance works awarded Details 8Intimation of Schedule of Meeting with Analyst/ Institutional Investor [HOEC] Details Details
India is a price elastic market 8And no one really takes any chances, so many run dual feed furnaces, which can run on liquid fuels or gas 8Now that prices are down, suddenly India is looking for spot purchases of LNG from all over the world 8Some years ago, the Oxford Institute of Energy Studies had estimated that India affordability range was between $5-7/mmbtu but this seems to have moved north to around $8 to $9/mmbtu for gas demand to really take off. 8Anything above this will mean demand will go up secularity but not by much Click on Reports for more
Details
The DGH wants to go all-new tech and wants to use AI and advanced analytics when it comes to decision making and interactions with E&P operators 8But then find out more on why everything however is old school and will not change despite the effort Click on Details for more.
Details
Get exclusive headlines from our energy sector coverage: 8Rays Power secures a solar power project 8Auction of coal Mines: A total of 14 mines fail to attract bidders 8Transmission schemes get modified scope of work 8SJVN awards a 18 MW solar project 8This policy aims to avoid manipulation in the trading system 8Rs 750 crore transmission projects coming up 8Genus Power: There is no preference 8Discoms to pay compensations to consumers for failure to meet Standards of Performance Get in touch with us for more on these storiesDetails
Looks like this Rs 1400 crore 2G bio-ethanol plant, and this is not the BPCL plant at Bargarh in Odisha, is going ahead full stream 8The plant is already looking at a post-commissioning phase, it seems 8Find out how much bio-waste will it need and what will be the cost, as also more details on it Click on Details for more
Details