Project Name: Thermal Power Project: Installation of FGD 8Project Cost: 500 crores 8Project Description: RFQ for design, engineering, supply, installation, erection, and commissioning of the FGD system is expected by May 2019. 8Expenditure Approval: Q1:2017 8RFQ Date: May/2019 8Release Date: May/2019 8Start Date: 2021 8Completion Date: 2023 Click here for more details for project details and key contacts 8Project Name: Thermal Power Station - R&M Project 8Project Cost: 300 crores 8Project Description: RFQ for R&M package of the boiler and its auxiliaries is expected by the Q3 2019. 8Expenditure Approval: Q1:2018 8RFQ Date: Q3:2019 8Release Date: Q3:2019 8Start Date: Q1:2020 8Completion Date: Q3:2022 Click here for more details for project details and key contactsDetails
8If an Indian owner is going to use a scrubber to get around the IMO 2000 low sulphur specifications, it may find itself in a corner sourcing high sulphur oil as well. Click on Reports for more 8If you are a PSU officer looking for a good deputation, here is a good opportunity to get out and pick up some good experience for some time. Click on Reports for more 8MRPL's director finance's slot is up for grabs. If you are eligible, put in your application now. Click on Reports for more 8Compressed biogas opportunities are now abundantly available. Know more click on Reports. 8An oil company is looking at empanelling solar energy suppliers. Click on Reports for more 8PNGRB has issued fresh tariff orders for: -- Devangonthi-Devanhalli ATF pipeline -- Different segments of the Jamnagar-Loni LPG pipeline -- Different segments of the Mundra-Delhi pipeline -- Mangalore-Bangalore pipeline -- Paradip Raipur Ranchi pipeline -- Vizag-Secunderabad LPG pipeline -- Chennai Trichi Madurai pipeline Click on Reports for more
Details
8Oil and Natural Gas Corporation Limited is planning the designing and implementation of surfactant based chemical Enhanced Oil Recovery formulation. The company plans to execute the pilot project in Jhalora, Kalol, North Kadi , Sobhashan, Lakwa, Lakhmani, and Rudrasagar. Click on Details for more
Details
While the likes of Exxon Mobil and Shell are increasingly focused on selling LNG into the Indian market, with teams stationed strategically here, enough attention needs to be focused on what Russian major Gazprom is doing. 8Under a long term contract, GAIL is today Gazprom's largest LNG purchaser, amounting for around 19% of its total sales. 8The Russian giant is sitting on a huge portfolio of gas, it is also China's largest gas supplier Click on Reports to find out more on what is up
Details
French company Schlumberger has always been the most aggressive of the big three E&P equipment and service providers in India, the other two being Baker Hughes and Halliburton. 8But it looks like Schlumberger overplayed its hands in a recent ONGC tender, forcing the latter to initiate blacklisting procedures on the multinational. Click on Details for more on how this is going to play out
Details
8Project Name: IOC's Bhadrak Greenfield Continuous Polymerization Textile Project 8Project Cost: Rs 1971 crore 8Project Description: Indian Oil Corporation Limited is planning to construct Continuous Polymerisation (CP) unit with a capacity of 900 TPD, Fibre manufacturing unit with a capacity of 500 TPD and Yarn manufacturing unit with a capacity of 300 TPD in a polyester plant project at Bhadrak in Odisha. MEG and PTA, the two main feedstocks for the proposed CP unit which are subsequently converted into manmade fibers/yarns, which will be imported from Paradip Refinery. Chemtex Consulting of India Private Limited has been hired for the Techno-Commercial feasibility study. Further RFQs for the PFR consultant is expected soon. 8Project Event: RFQ for the PFR consultant is expected by May 2019. 8Expenditure Approval: 2020 8RFQ Date: May/2019 8Release Date: May/2019 8Start Date: 2020 8Completion Date: 2023 Click here for more details for key contacts and other details. Also, click on ReportsDetails
If Schlumberger is placed on holiday, the multinational will find itself out of the race from several high value tenders that ONGC has floated or are likely to float in the future 8Find out more on what kind of jobs it may find itself not participating in. Click on Details for more
Details
8How ONGC deals with the black listing process for multinational equipment and service providers such as Halliburton and Schlumberger will set the precedent for its dealings with black listing of Indian companies as well, such as Deep Industries and perhaps John Energy too at a later point in time. Find out more
Details
This is not the first time that one of the big three equipment and service providers has gone through a blacklisting scare from ONGC 8Earlier, Halliburton went through a similar process Click on Details for more.
Details
There have been a twist in the story relating to the award of an MOPU for to a company put together by a bunch of Indian entrepreneurs lead by an ex-ONGC official for the development of the Rs 4000 crore Ratna & R Series field. 8Reacting to our earlier news that a contract is indeed being readied for a MOPU, well-placed sources are now saying the deal is in fact not going through. 8Click on Details to find out what happened
Details
Ammonia-Urea Brownfield Project 8Cost - Rs 6000 crore 8Project Event: RFQ for the Urea handling & bagging package has been out and bid closing date is 18 March 2019. Date & Time of opening of EMD and Technical and Commercial bid is 19 March 2019 and Pre-Bid Meeting Schedule on 5 March 2019. Click here for more details DAP Expansion Project 8Cost - Rs 100 crore 8Project Event: The project has elicited the term of references and proposal for the environmental clearance is likely to be submitted in March 2019, RFQ for the EPC contractor is likely to be released in April 2019. Click here for more detailsDetails
8Project Name: Panipat Refinery Greenfield Fuel Up-gradation Project 8Project Cost: Rs 3529 crore 8Project Description: Indian Oil Corporation Limited along with EPCM contractor Engineers India Limited and licensor UOP/Axens is carrying out engineering activities to construct the following new units: DHDT of 2200 KTPA, HGU of 44 KTPA, SRU of TPD, ARU of 189 TPH and SWS unit of 56.7 TPH along with the revamping of existing DHDS unit from 700 KTPA to 1000 KTPA for the proposed BS–VI Quality Up-gradation as well as the Capacity Expansion of the PX / PTA in the existing premises of Panipat refinery. All long lead items and 99% of short lead items have already been ordered. Tankage work is completed. Bridge and Roof Corporation Ltd.has got the contract for civil work, underground piping work and composite work like aboveground piping fabrication work of revamping unit and new units. Erection of cooling tower and erection of DHDT reactor has already been completed. RFQ for the erection work for SRU main combustion chamber package has already come out and the bidding process is going on. Further RFQ for the erection and installation work for the HGU reformer unit is expected soon. 8Completion Date: Q3:2019 Click here for more details 8Supply contract for Biomass coming up Find out the who will be tendering for it, who is the key contactDetails
8Project Name: Pipeline Development Project 8Project Cost: Rs 230 crore 8Project Description: Oil India Limited along with its EPCM contractor MECON has awarded the contract for the Gaskets Ring to Tirupati Industries respectively. Meanwhile, technical evaluation of the tender for the Mainline Valves, Ball Valves, Plug valves, Gate Valves, Hydraulic Actuator, and Globe Check Valves is going on from the MECON's end. The RFQs for the Flanges, Bolts, Nuts, NRVs, Electrical items, Cables, Instruments, UPS, Batteries will be floated soon. Tender processing is currently on for Coated Line Pipes, Insulating Joints, Scrappers, Flow-Tees, Pig Signalers, etc. Find out what kind of RFQs are expected ahead. 8Completion Date: Dec/2020 Click here for more detailsDetails
8Project Name: Quick Production System 8Project Description:Oil and Natural Gas Corporation Limited's tender for the hiring of an EPC contractor for Quick Production System at Ramol in Ahmedabad, Gujarat has been delayed 8Project Event: RFQ for the hiring EPC contractor is expected by May end 2019 8Expenditure Approval: Q4/2018. 8RFQ Date: 30/May/2019 8Release Date: Aug/2019. 8Start Date: Q4/2019 8Completion Date: Q4/2020 Click here for more detailsDetails
For reference purposes the website carries here the following tenders: 8Supply and Commissioning of Mounded Storage Vessels for storage of LPG at LPG Plant Site Details 8Supply of Safety caps Details 8Supply of steel plates Details 8Diversion of oily water sewer load by laying new above ground lines for tank drains system pipe supports Details 8Sale of various used/ scrapped material of refinery Details 8Procurement of Rotary Substitutes Details 8Construction of ''GS-15-E1-DA'' drill site Details 8Procurement of valves for surface team Details 8Purchase of 3000 numbers of Composite Mats and O&M services for 3 years for Drilling Services Details 8Civil works at Drill site BK-AC Details You can also click on Tenders for more For reference purposes the website carries here the following Newsclips: 8IWAI, Indian Oil ink pact on fuel needs of national waterways Details 8IOC wins city gas licences for 10 areas; HPCL wins for 9 Details 8Indian Oil, Adani, Bharat Gas, Torrent emerge biggest winners under 9th and 10th round of CGD auctions Details 8New energy source discovered off Andhra coast Details 8No environmental norms violated by Barauni refinery: Indian Oil Corporation Details 8ONGC to drill 406 wells in Gujarat oil and gas asset at a cost of Rs 2,403 croreDetails 85,000 compressed bio gas plants to come up by 2023: Pradhan Details 8Romania to lose $540 mn in taxes from gas price cap, says industryDetails 8UAE's ADNOC signs agreements with South Korean energy companies Details 8Workers at Total's North Sea oil, gas platforms to start strikes in March Details 8China plans new state pipeline company in massive energy reshuffleDetails 8Ineos to invest 1 billion pounds in UK energy assetsDetails 8Russian energy ministry, oil companies to discuss global oil dealDetails 8OPEC welcomes Trump in dialogue on rebalancing oil market: BarkindoDetails 8Saudi's Falih warns of policies undermining oil, gas development Details 8Russian energy minister says oil markets are more or less stableDetails 8Exxon's reserves up 23 per cent on gains in US shale, offshore Details 8Libya's recognised govt agrees with state oil firm to reopen El Sharara oilfieldDetails 8Mexican state oil company Pemex posts $6.4 bln 4th-qtr loss Details 8Oil slips on record U.S. crude output, China's weakening economyDetails You can also click on Newsclips for moreDetails
Project Name: Greenfield Hydroelectric Power Project 8Project Cost: 3000 crores 8Project Description: Owner is carrying out the acquisition of private land in a greenfield hydel power project. 8EC has been recommended by MoEF on special grounds. 8Additional geotechnical investigations have been carried out. 8RFQs for construction of single-lane steel truss Bridges are expected Find out more along with the key contacts Click here for more details Project Name: Thermal Power Project: Installation of FGD 8Project Cost: 200 crores 8Project Description: The feasibility report is under evaluation for the installation of three wet limestone-based FGD systems in a thermal power complex. 8Retrofitting of ESP to reduce emission is in process. Find out the business opportunities Click here for more detailsDetails
Maersk, the world's largest shipping company has been widening its reach in India. 8It has invested across in India through different subsidiaries. 8It has set up a cold storage facility recently. 8And it continues to work with ship recycling yards in Alang, India, to prove the viability of more options for responsible ship recycling. In 2018, the European Union (EU) introduced a list of approved yards for the recycling of vessels carrying EU flags. The desire to be included on this list is encouraging the transformation of Alang, where at least 66% of the yards are now investing in improvements. The current version of the EU list does not include Indian yards Click on Reports for more
Details
Ammonia-Urea Brownfield Project 8Cost - Rs 100 crore 8Project Event: Bridge and Roof Co India Ltd, Comt Constructions Private Limited, McNally Bharat Engineering Company Limited, Montecarlo Limited, Nice Projects Limited, VRC Constructions (I) Pvt. Ltd and Simplex Infra are in the race for building, the wagon loading platform, conveyor gantry, and transfer tower and pipe rack structure. The technical evaluation has been completed and price bid is likely to be opened in March 2019. Click here for more details Ammonia-Urea Brownfield Project 8Cost - Rs 100 crore 8Project Event: Agnice Fire Protection Pvt Ltd, Blue Star Limited, Golden Edge Engineering Pvt Ltd, Neo Structo Construction Private Limited, NTPC GE Power Services Private Limited, Onshore Construction Company Pvt Ltd, Sopan O & M Co Pvt Ltd & Sparklet Engineers Private Ltd are in the race to Supply Composite Mechanical Erection Work for Offsite & Utilities. The technical evaluation is ongoing, price bids have not been opened yet. Click here for more detailsDetails
8Project Name: Krishnapatnam Greenfield POL Terminal Project 8Project Cost: Rs 700 crore 8Project Event: RFQ for the long lead items is expected by May 2019. 8Expenditure Approval: Q2:2017 8RFQ Date: May/2019 8Release Date: May/2019 8Start Date: Q2:2019 8Completion Date: Q2:2021 Click here for more details 8Project Name: Thiruvallur- Bengaluru Greenfield RLNG Pipeline Project 8Project Cost: Rs 720 crore 8Project Event: RFQ for the PMC contractor is expected by May 2019. 8Expenditure Approval: Q3:2017 8RFQ Date: May/2019 8Release Date: May/2019 8Start Date: Q2:2019 8Completion Date: Q2:2021 Click here for more details 8Bid submission date has been extended for Emergency Response Centres Click on Details for moreDetails
8Project Name: Block Exploratory Drilling 8Project Cost: Rs 100 crore 8Project Description: Bharat PetroResources Limited is expected to release the tender for EIA consultancy services soon in Kheda, Gujarat. Furthermore, the integrated drilling services tender will be floated in Q3 2019. In the meanwhile, the company has applied for PEL validity extension of the block and TOR for the project has also been granted. The company now plans to drill 5 exploratory wells instead of 3 exploratory well. Targeted depths of proposed exploratory wells will be 1800 meter. The drilling will be carried out on an integrated contract basis and is expected to start by Q2 2020. The block had been awarded to the company under the OALP round in 2018 and covers an area of about 174 sq km and is located adjacent to CB-ONN-2010/08 block. Further RFQs are expected shortly. 8Project Event: RFQ for hiring EIA consultant is expected by April 2019. RFQ for integrated drilling services is expected by Q3 2019. 8Expenditure Approval: Q3/2019. 8RFQ Date: Apr/2019 8Release Date: Jun/2019. 8Start Date: Q1/2020 8Completion Date: Q4/2020 Click here for more details for proejct details and key contacts 8Project Name: Offshore Field Phase-II Exploration 8Project Cost: Rs 150 crore 8Project Description:Adani Welspun Exploration Limited has still not been granted approval for the phase-II exploration programme in the block MB-OSN-2005/2 block but approval is now expected by the end of March or April 2019. The company has still not initiated the process of hiring the subcontractors, and that will be started once clearances are received from the ministry. 8Project Event: RFQ for the hiring of equipment and services from IPM's end is expected by April 2019. 8Expenditure Approval: Q1/2017. 8RFQ Date: Apr/2019 8Release Date: Jun/2019. 8Start Date: Jan/2020 8Completion Date: Dec/2020 Click here for more details for project details and key contacts Details
For reference purposes the website carries here the following tenders: 8Repair & strengthening of subsea facilities project Details 8Procurement of DiethyleneTriaminePenta Acetic Acid and Potassium Hydroxide for MH & NH Assets Details 8Annual O&M contract for HVAC System at HVJ Compressor Details 8Group Personal Accident Insurance Coverage of Employees Details 8AC Interference mitigation job at three RRVPNL crossing sites Details 8Hiring of Courier for PNG Bills Distribution Details 8Procurement of CS Fittings, Ball Valves and Insulation Joints Details 8Procurement of Belt Tongs Details 8Supply of Antioxidant-1010 for Poly Propylene Unit Details 8Procurement of Safety Caps Suitable for SC Valve of LPG Cylinders Details 8Carrying out Civil Works at Jabalpur Details 8Supply and Commissioning of 3X200 MT Capacity Mounded Storage Vessels Details 8Design and Commissioning of Effluent Treatment Plant Details You can also click on Tenders for more For reference purposes the website carries here the following Newsclips: 8Petrochemical complexes to boost turnover of BPCL Kochi Refinery Details 8ONGC to sell 9.5 million tonnes of liquefied natural gas a year from Mozambique projectDetails 8Oil marketing cos permit dealers to operate more than one petrol pumpDetails 8US envoy offers Assam state of the art technology for exploring petroleum and natural gas Details 8Mukesh Ambani breaks into global rich list as Anil with $1.9 bn fights bankruptcy Details 8OPINION: Trump warns Saudi Arabia on oil prices as focus turns to re-electionDetails 8FEATURE: Rio de Janeiro hits the gas in push toward its zero carbon goalDetails 8Gazprom sees its gas price in Europe at $230-250 per 1,000 cubic metres in 2019 Details 8OPINION: Trump warns Saudi Arabia on oil prices as focus turns to re-electionDetails 8Saudi Aramco to deliver 500,000 barrels per month of crude to Egypt Details 8Aramco CEO says oil industry facing 'a crisis of perception' Details 8Our 2018 order book has been the highest ever: Ashish Bhandari, CEO, India & South Asia, BHGE Details 8OVL and Mozambique LNG1 partners sign fresh LNG sale agreements for 8.1 MTPA Details 8Petrochemical complexes to boost turnover of BPCL Kochi Refinery Details 8GE CEO says company needs to reduce debt 'thoughtfully and soon' Details 8Oil rises on OPEC-led supply cuts, report of falling US crude inventories Details You can also click on Newsclips for moreDetails
Project Name: Super-Critical Thermal Power Expansion Project 8Project Cost: 9000 crores 8Project Description: The BTG contractor BHEL is carrying out erection works in a super-critical thermal power project. 8The unit is expected to get commissioned in Q1 2020 8An FGD package is still to be tendered 8Find out the major contractors and sub-contractors involved in the project Find out more along with the key contacts Click here for more details Project Name: Captive Thermal Power Project: R&M 8Project Cost: 0.50 crores 8Project Description: A JV company plans renovation and modernization of the regenerative air-preheater 8When are the RFQs expected Find out the business opportunities Click here for more detailsDetails
8Fresh analysis made on LNG demand and supply seems to indicate that fresh supplies are being absorbed by markets in Asia and India. Click on Report for more. 8Now that the Ratnagiri Refinery is delayed, is Saudi Arabia looking at Reliance for investments in the refineries and petrochemical projects in India? Click on Report for more. 8Are petroleum sector subsidies under-provided? Click on Report for more. 8The zero tolerance policy could hurt India this time around, as the US focus turns to India and China for shoring up Iranian crude production. Click on Report for more.
Details
8Get the latest E&P cost curves for: -- Onshore -- Shallow water -- Deep water -- Mid water -- Shale/tight oil 8The falling cost curves have made 90% of offshore unsanctioned discoveries viable at $60/bbl and above 8This is the reason why rig utilization rates -- both jack up and floaters -- are going up, coupled with decreased rig supply. 8Get the latest tender activity for floaters and Jackups here Click on Reports for more
Details
Get an idea of the latest and most efficient stacking cost for jack-up rigs and floaters 8The data is divided up between warm and cold stacked Get data on: 8Deactivation charges 8Daily opex 8Reactivation charges Compare your own costs with global benchmarks Click on Reports for more
Details
For reference purposes the website carries here the following tenders: 8Annual Maintenance Contract for DCS System of LPG Recovery Plant & Mounded Bullets of LPG Plant Details 8Supply of DMDS in ISO Containers for VGO HDT for refinery Details 8Procurement of Crank Shaft of Hydrocracker Mug Compressor for refinery Details 8Supply of Drag reducing Additives Details 8Advisory Services in Turnaround Management in refinery Details 8Supply, Commissioning and CAMC of Mercaptan Analyser Systems Details 8Supply of Safety Caps Details 8Carry out painting of Coke Drum Structures with scaffolding in delayed coker unit Details 8Laboratory Information Management System License and installation Details 8Annual rate contract for vibration analysis of offshore Drilling rig equipment Details 8Procurement of Perforated Liners Details 8Job of installation of EPS facilities Details 8Supply of Manila Ropes for Drilling Services Details 8Civil works at drill site LKGZ in Lakwa area Details You can also click on Tenders for more For reference purposes the website carries here the following Newsclips: 8Access to pipelines a key issue in unlocking India’s natural gas potential: Ajay Shah, VP, Shell Energy Asia Details 8Oil PSUs taking up education projects in 17 Odisha districts: Pradhan Details 8OPINION: Crude and politics mingle as Saudi crown prince visits India, ChinaDetails 8Petrol dealers: Fuel tanks have larger capacity than is claimed Details 8After sharing of CM's post, now Shiv Sena-BJP bicker over Nanar projectDetails 8Azerbaijan wants stable oil price before any further output cut Details 8Turkey's Global Investment Holding plans Naturelgaz IPO Details 8Platts adds Rotterdam-priced crude oil cargoes to dated BrentDetails 8OPINION: Hedge funds bet cautiously on even higher oil pricesDetails 8ConocoPhillips shuts down Suban gas field for planned maintenance Details 8Goldman Sachs says near-term oil view modestly bullish on tightening marketDetails 8Crude oil futures fall 0.49%, hurt by weak global cues Details 8China CNOOC says offshore gas discovery has over 100 bcm proven reserveDetails 8Oil prices dip as record US exports undermine OPEC-led efforts to cut supply Details 8Oil steadies after selloff; market eyes Trump interventionDetails 8Donald Trump calls on Opec to 'relax,' says oil prices are too high Details You can also click on Newsclips for moreDetails
Coal-based Ammonia-Urea & Captive Power Plant Greenfield Project 8Cost - Rs 6500 crore 8Project Event: The project activities are on hold, due to an internal issue. The project is likely to be active in August 2019. Click here for more details Ammonia and Captive Power Unit Greenfield Project 8Cost - Rs 1920 crore 8Project Event: The project has elicited the terms of references but project activities are on hold from three to four months, and will restart in April 2019. The proposal for the environmental clearance is likely to be submitted in May 2019 after that consultancy and contractor hiring process will start Click here for more detailsDetails
ONGC has been able to elicit the lowest rates worldwide against its category-1 jack-up rig tender. 8The lowest rate was quoted by the local outfit, Jindal Drilling & Industries Ltd under a newly introduced cost-cum-quality system against its rig Disovery-1. 8Find out by how much lower the Jindal Drilling quote was from prevailing international rates. 8Also find an answer to to why ONGC elicits the lowest rig rates in the world and why foreign drilling companies stay away from ONGC's tenders. Click on Details for more
Details
John Energy Ltd is an old hand in the E&P business. It has a total of 34 rigs -- 19 drilling and 15 workover rigs -- and it has recently forayed into the gas dehydration business. 8The company however seems to be in a bit of a crisis as it faces penal action, even black listing, by its single largest client, ONGC. 8The charges are serious, workers were not being paid in some areas of its operations, and the company will need all its resources to get out of the bind that it has found itself in. Click on Details for more
Details
8Project Name: Tank Farm Development 8Project Cost: Rs 438 crore 8Project Description: Oil India Limited's is working with its EPCM contractor to complete the project. June 2019 is the deadline for completion, it seems Click here for more details 8Project Name: Drilling Site Development 8Project Cost: Rs 240 crore 8Project Event: RFQ for the hiring of rig mobilization services is expected by April end 2019 RFQ for the hiring of the slickline services is expected by May 2019 8Expenditure Approval: Q4/2014. 8RFQ Date: Apr/2019 8Release Date: May/2019. 8Start Date: Q3/2019 8Completion Date: Dec/2021 Click here for more detailsDetails
8Project Name: B-80 Offshore Development 8Project Cost: Rs 280 crore 8Project Description: It is a big standalone offshore development plan by HOEC. Get the details here. 8Project Event: RFQ for Rig cum MOPU mobilization and positioning is expected by Q2 2019. 8Expenditure Approval: Q3/2017. 8RFQ Date: Q2/2019 8Release Date: Q2/2019. 8Start Date: Q4/2019 8Completion Date: Q4/2020 Click here for more detailsDetails
8Project Name: Offshore Platform Revamp 8Project Cost: Rs 50 crore 8Project Description: Delay in engineering work has meant a delay in the RFQ for the job. 8Project Event: RFQ for hiring EPC contractor is expected by May 2019. 8Expenditure Approval: Q3/2018. 8RFQ Date: Apr/2019 8Release Date: May/2019. 8Start Date: Q3/2019 8Completion Date: Q3/2020 Click here for more detailsDetails
Project Name: Thermal Power Plant - FGD Addition 8Project Cost: 500 crores 8Project Description: NTPC is the DFR consultant for installation of FGD system in a thermal power plant 8The project is under review at the state electricity regulatory commission 8When the RFQ for the supply of FGD is expected Find out more along with the key contacts Click here for more details Project Name: Thermal Power Project: Installation of FGD 8Project Cost: 1000 crores 8Project Description: A FGD system needs to be installed in a super-critical thermal power project in Uttar Pradesh 8The proposal for the FGD is stuck at UPERC and CEA 8The phase-out for the installation is planned in 2021 8A De-NOx system is also in the proposal Find out the business opportunities Click here for more detailsDetails
Has Oil India Ltd's leadership failed to keep miscreants from damaging its oilfields in Upper Assam? 8OIL leadership's failure has now been noted formally by the government of India, as the company posted an under-performance of an unprecedented 23% from target oil production in January 8It is learned that local agitators have freely accessed OIL's properties, damaging some wells permanently. 8OIL's failure to protect its properties has attracted the ire of the central government. Click on Reports and Details for more.
Details
A rank outsider has grabbed the tender for high quality electric submersible pumps (ESPs) for the NBT and Ratna R Series fields 8This has left the traditional suppliers, including Baker Hughes, completely outwitted. Click on Details for more
Details
8Project Name: Oilfield Development 8Project Cost: Rs 150 crore. 8Project Event: RFQ for an EPC contractor for a Quick Production Facility and pipeline is expected by January 2019 RFQ for the hiring of rig services is expected by February 2019 8Expenditure Approval: Q4/2017. 8RFQ Date: Jan/2019 8Release Date: Mar/2019. 8Date: Oct/2019 8Completion Date: Dec/2021 Click here for more detailsDetails
ONGC is likely to change the Bid Evaluation Criteria for electric submersible pumps (ESPs) used in offshore platforms 8ESPs are used across ONGC's well platforms Find out what kind of parameter changes are likely
Details
The processing of the ONGC tender for Category-II of the 9-rig jack-up rig requirement has seen many a twist and turn. 8Is it going to be opened soon? Click on Details for more
Details
NPCC is currently executing the five-well platform project for the Ratna & R Series field. 8A lot of logistics are involved and the race is on to complete the project in time. Click on Details for more
Details
OIL has awarded a mud engineering services contract for HPHT wells 8Traditional bidders, such as Baker Hughes and Halliburton, lost out in the race Click on Details for more
Details
8Project Name: Oil Field Development 8Project Cost: Rs 300 crore 8Project Description: RFQs for the hiring of rig mobilization and slickline services for the 12 wells development drilling are expected. The drilling is expected to start by May 2019. 8Expenditure Approval: Q4/2014 8RFQ Date: Jan/2019 8Release Date: Mar/2019 vStart Date: Q2/2019 8Completion Date: Dec/2021 Click here for more informationDetails
8Project Name: Greenfield LNG Terminal Project 8Project Cost: Rs 5402 crore 8Project Description: Two-phase development is planned Procurement for the phase- I is already completed. RFQ for the PFR consultant for phase-II has already come out and the bidding process is going on. Further RFQs are expected soon. 8Expenditure Approval: Q4:2016 8RFQ Date: May/2019 8Release Date: May/2019 8Start Date: Q3:2019 8Completion Date: Q3:2022 Click here for more details 8A short term annual maintenance contract is coming up for a downstream petrochemical unit Get key project details as well as key contactDetails
For reference purposes the website carries here the following tenders: 8Transportation of Bulk POL products MS HSD and Branded fuels by Road ex Miraj IRD Details 8Transportation of Bulk POL products MS HSD and Branded fuels by Road ex Irumpanam Terminal Details 8Supply of Conduit Gate Valves Details 8Integrated Chemical Enhanced Oil Recovery Pilot Project in Onshore fields Details 8Procurement of Structural Quality Carbon Steel Plates Details 8Instrumentation Works for BS-VI MS Block Project at refinery Details 8Basic Engineering and Cost Estimate of Cross-linked Acrylic Monomer Polymerization Plant Details 8Mechanical Works of UG Tanks Details 8Disposal of Silt/ Sludge from various pits outside refinery Details 8LSTK Package for 2G Ethanol Bio Refinery Project Details 8Procurement of General Electrical Consumables Details 8Supply, Installation and Commissioning of Float Cum Boost Chargers for Battery Systems Details 8Procurement of PVC Tamper Evidant Seals Details 8Hiring the Services of Scrapping Winches Details 8EIA/ EMP Studies & Public Hearing for Exploratory drilling Details You can also click on Tenders for more For reference purposes the website carries here the following Newsclips: 8Renewed US sanctions on Iran oil revive fortunes of an Indian bank Details 8New petrol pumps to create lakhs of jobs: Oil minister Pradhan Details 8Hydrocarbon project: Movement to hold rally in ThanjavurDetails 8India's Nayara Energy Jan oil imports surge 36 pct month-on-month Details 8Jharkhand: Bokaro to open state’s first CNG station today Details 8Petroleum regulator rejects HPCL review petition on ATF pipelineDetails 8Saudi Arabia to make India regional hub for oil supply: Saudi FM Details 8Rs 1.40 lakh crore of oil & gas investments likely in Odisha: PradhanDetails 8Uzbekistan seeks $300 mln loan from Russia's Gazprombank for gas complex Details 8Energy Transfer expands Bakken oil pipeline capacity to 570,000 bpdDetails 8Dutch energy firm Eneco reports rise in 2018 operating profit Details 8Owners of Permian producer DoublePoint plan $5 bln sale - sources Details 8Repsol signs supply deal for Brittany Ferries' new LNG shipDetails 8Russia's Novatek to double spending on gas fields, other projectsDetails 8High crude oil prices, fears of rise in core inflation subdue equity indices Details 8Asia's surging fuel exports depress oil refining industry profitsDetails 8China's January LNG imports rise to record highDetails 8Saudi Aramco agrees tie-up for $10 bn refinery and petrochemical project in China Details 8Oil leaked from Petrobras P-58 platform off Brazil -company Details 8Iran says it has many options to neutralise "illegal" U.S. oil sanctionsDetails 8UAE oil firm ADNOC signs $4 billion deal with US investors BlackRock, KKRDetails 8Oil prices firm on hopes for U.S., China trade deal Details 8Exxon asks U.S. regulator to block climate-change resolution -investors Details You can also click on Newsclips for moreDetails
Project Name: Thermal Power Project 8Project Cost: 9000 crores 8Project Description: A major thermal power project has faced a time overrun of 60 months. But, as of now, it is on track. 8The project is expected to get commission by the end of 2019. 8BHEL is the BTG contractor. 8Who are the major contractors and sub-contractors involved 8What kind of RFQs are still to come Find out more along with the key contacts Click here for more details Project Name: Greenfield Super Thermal Power Project 8Project Cost: 15000 crores 8Project Description: BHEL and along with sub-contractors is at the pre-commissioning stage to commission one of the units in a super-critical thermal power project. 8But, still a lot of work in the balance of plant area is left behind. 8L&T is the FGD EPC contractor Find out the RFQs that are expected Click here for more detailsDetails
IOC is slowly emerging into a big multi-channel LNG player 8With the commissioning of its LNG terminals, the company is unleashing new programmes to reach LNG to customers Click on Reports for more
Details