Dec 07: 8Project Name: Greenfield LPG Bottling Plant Project
8Project Cost: Rs 150 crore
8Project Description: The owner has hired Optech a PMC contractor to install an LPG Bottling Plant with a capacity of 120000 MTPA
Major equipment required: Tanks, Boiler, Refrigeration Compressors, LPG discharge pumps, Lube oil pump compressors, Mercaptane Dosing Pump, Discharge Pump, Cooling water pumps, Cooling tower pumps, Lube oil charging pumps, Diesel pumps, Air compressors, Smoke detector, Heat detector, Hooter, Mounded Bullets, Columns, Relief Valves, Separator, Monitor module, Control module.

8Project Event: RFQ for the mounded storage vessel work is expected by February 2019.
8Expenditure Approval: Feb/2017
8RFQ Date: Feb/2019
8Release Date: Feb/2019
8Start Date: Q3:2018
8Completion Date: Q3:2020