Refinery, pipeline and tanakge jobs coming up
Dec 04: 8Project Name: Refinery IndJet Unit Modernization Project
8Project Cost: Rs 189 crore
8Project Description: (NEW DESCRIPTION) Indian Oil Corporation Limited along with EPCM contractor Engineers India Limited and in-housing technology developed by IOCL R&D is carrying out engineering activities to install a new IndJet unit to produce 250 KTA of Aviation Turbine Fuel (ATF) and 75 KTA of Pipeline Compatible Kerosene (PCK) from Barauni Refinery.
Get the latest update here, including key contacts and RFQs coming up ahead

Click here for more details 

8Project Name: Tie-in-Connectivity Pipeline Project
8Project Cost: Rs 50 crore
8Project Description: A private port is planning to do a Tie-in-Connectivity from proposed LNG terminal to a trunk gas pipeline network. The capacity of the 18" pipeline will be 1.2 MMTPA at 45 bars operating pressure at inlet and outlet points. The length of the proposed tie-in-connectivity is 4km from ports limit to the nearest tie-in point.
8Project Event: RFQ for the PMC contractor is expected by February 2019.
8Expenditure Approval: Q3:2017
8RFQ Date: Feb/2019
8Release Date: Feb/2019
8Start Date: Q1:2019
8Completion Date: Q2:2021
Click here for more details 
An Instrumentation work coming up
8A tenure based work schedule has been drawn up
Click on Details for key contacts
Crude Oil Tank Repair Services Coming Up: Find out more
8The owner is soon going to release the RFQs for overhauling of Crude Oil Tanks in an existing oil field.
8Bidders must have prior experience of at least 5 years in crude oil Tank Repair Services.
8The tender is going to be released by the month of February 2019.
Click on Details for key contacts

**********************************