Aug 29: 8Project Name: Barhi Greenfield LPG Bottling Plant Project
8Project Cost: Rs 161 crore
8Project Description: Hindustan Petroleum Corporation Limited (HPCL) is planning to relocate an existing LPG plant at Hazaribagh to a Barhi and set up a new LPG Bottling plant at Barhi, Jharkhand with a capacity of 120 TMTPA along with a 48 slot automatic electronic carousal and attendant downstream facilities. LPG mounded bullet storage will of 3 x 350 MT capacity along with 10 unloading bays are to be installed. The old plant had to be resited at Barhi due to land acquisition by National Highways department for a proposed 6 landing of NH-33 Highway which connects Hazaribagh to Jamshedpur. The new plant will cater to the market served by the Hazaribagh plant. The LPG product will be received through bullet trucks from Vishakhapatnam Refinery. HPCL has hired ABC Techno Labs India Private Limited for pre-feasibility studies. RFQ for the EPCM contractor is already out. Further RFQs are expected soon.
Major equipment required: Tanks, Molded bullets, Mercaptane Dosing Pump, Discharge Pump, Cooling water pumps, Cooling tower pumps, Lube oil charging pumps, Diesel pumps, Air compressors, Centrifugal compressor, Smoke detector, Heat detector, Hooter, Separator, Monitor module, Control module. 
8Project Event: RFQ for the fabrication of mounded storage vessel (MSV) and freshwater tank (FWT) is expected by October 2018.
8Expenditure Approval: Q3:2017
8RFQ Date: Oct/2018
8Release Date: Nov/2018
8Start Date: Q4:2018
8Completion Date: Q4:2020