Downstream project: Equipment RFQs coming up
Aug 28: 8Project Name: Refinery Greenfield Slurry Resid hydro cracking Unit Project
8Project Cost: Rs 154 crore
8Project Description: The owner and in this case the licensor, indResid, is planning to install a new Slurry Resid hydrocracking Unit
 Major equipment required are: Pumps, Valves, Low-pressure flash drum, Hydrocyclone separator, hydrotreating reactors, Slurry reactors, Hydrocracker reactor, Hot high-pressure separator, Cold low-pressure separator, Recycle gas compressor, Amine scrubber, Column, Analyzer, Feed tank.
8Project Event: RFQ for the DFR consultant is expected by October 2018.
8Expenditure Approval: Q1:2018
8RFQ Date: Oct/2018
8Release Date: Nov/2018
8Start Date: 2019
8Completion Date: 2021
Click here for more details

8Project Name: Brownfield POL Terminal Expansion Project
8Project Cost: Rs 108 crore
8Major equipment to be required are: Mounded Storage Vessel, Centrifugal Compressor, Flanges, Refrigeration Compressors, Lube oil pump compressors, Water Condensate, Discharge Pump, Lube Oil Charging Pumps, Diesel Pumps, Air Compressors, Filters, Trays, Splitters, Separators, Strippers.
8Project Event: RFQ for the listed equipment is expected by October 2018.
8Expenditure Approval: Q3:2017
8RFQ Date: Oct/2018
8Release Date: Nov/2018
8Start Date: Q1:2019
8Completion Date: Q4:2020
Click here for more details

8Contractor required for HAZOP studies- Find out more, including key contact