Apr 23: 8Project Name: Thermal Power Brownfield Project
8Project Cost: 7000 crores
8Project Description: Owner's 660 MW super-critical thermal power plant in the existing premises of it's thermal power complex is getting delayed on the lack of issue of the LOA to the EPC contractor. The EPC contractor will come out with further bids subsequently. The project requirement are: water cooled condenser, vacuum pumps, boiler feed pumps and its drives, feed pump motor, deaerating heater and closed heaters, condensate extraction pumps, suction basket strainer, furnace system, furnace chamber, bed media and fuel feed system, air supply and distribution system, soot blowing system, ESP, chimney (275 m),ash handling system,water treatment plant, DM plant, fire fighting system,turbine oil purification system, switch-yard equipment, cranes, thermo mechanically treated steel, DG sets, rolling shutters, fencing materials, down shop lead (DSL) crane, carbon steel and pipe, Cu Ni / Al bronze tubes, stacker cum reclaimer, wagon tippler, piles, reinforced steel, structural steel, MS & Electro forged gratings, conveyer belts, side arm charger, among others.
8Project Event: RFQs for civil works are expected to be out in June 2018.
8Expenditure Approval: May/2018
8RFQ Date: Jun/2018
8Release Date: Jun/2018
8Start Date: Q2:2020
8Completion Date: Q3:2025
Click here for more information
8Project Name: Thermal Power Station - FGD Addition
8Project Cost: 800 crores
8Project Description: Owner's plans to install a Flue-Gas Desulfurisation Unit (FGD) in its 1500 MW thermal power plant is getting hampered because funds has not been allotted by the state government. Further bids are expected soon. The project requirements are: absorber system, gas to gas heat exchanger, piles, scaffolding, ladders, dozers, limestone silos, slurry tanks, booster fan, wet ball mills, slurry re-circulation pumps, bucket elevator, gypsum dehydration, stairways, among others.
8Project Event: RFQs for supply of an FGD are expected to be out by the Q3 2018.
8Expenditure Approval: Q1:2018
8RFQ Date: Q3:2018
8Release Date: Q3:2018
8Start Date: Sep/2021
8Completion Date: Q4:2023
Click here for more information
8Project Name: Thermal Power Maintenance Project
8Project Cost: 18 crores
8Project Description: Promoter has planned a 20-day scheduled maintenance of 250 MW in the 2000 MW thermal power complex covering annual overhaul of boiler parts and its auxiliaries. The mandatory job includes servicing of burner system, servicing of HP valves and safety valves, replacement of axial seals, inspection of generator and its parts, condenser cleaning and inspection, replacement of pipe supports, angles, beams and channels for flue gas ducts.
8Project Event: RFQs for required equipment are expected in June 2018.
Click here for more information
8Project Name: Thermal Power Station - Installation of FGD
8Project Cost: 800 crores
8Project Description: Promoter is planning the installation of a Wet Flue Gas Desulphurization (WFGD) Unit at its 1500 MW thermal power station. Further bids are expected soon but only after getting approval from the state government. The project requirements are: absorber system, gas to gas heat exchanger, piles, scaffolding, ladders, dozers, limestone silos, slurry tanks, booster fan, wet ball mills, slurry re-circulation pumps, bucket elevator, gypsum dehydration, stairways, among others.
8Project Event: RFQ for supply of an WFGD is expected to be out by May 2018.
8Expenditure Approval: Q3:2017
8RFQ Date: May/2018
8Release Date: Jun/2018
8Start Date: Q3:2019
8Completion Date: Q4:2021
Click here for more information
8Project Name: Super Thermal Power Plant - AMC Contractor
8Project Cost: 1 crores
8Project Description: A JV company will come out with a bid for annual maintenance contract (AMC) for electrical equipment in the switch-yard area after preparation of the Notice Inviting Tender documents in the 2500 MW thermal power station  
8Project Event: RFQs of an AMC for electrical maintenance of the switch-yard area are expected by Q3 2018.
8Expenditure Approval: Q1:2018
8RFQ Date: Q3:2018
8Release Date: Q3:2018
8Start Date: Q4:2018
8Completion Date: Q1:2020
Click here for more information
8Project Name: Thermal Power Plant - Annual Rate Contract
8Project Cost: 3 crores
8Project Description: Owner is in preparation of the Notice Inviting Tender document for the ARC for a 600 MW thermal power plant. Further bids are expected soon.
8Project Event: RFQs for an annual contract for the O&M of coal handling plant are expected by Q3 2018.
8Expenditure Approval: Q1:2018
8RFQ Date: Q3:2018
8Release Date: Q3:2018
8Start Date: Q4:2018
8Completion Date: Q4:2019