Power sector RFQs: Equipment wise search throws up all future opportunities
Apr 19: 8Project Name: Absorber System Package in Thermal Power Station 8Project Cost: 200 crores 8Project Description: Owner is planning to install an absorber system package in order to comply with environmental norms for its 660 MW Unit in the 3000 MW thermal power complex. Approval from owner's headquarters is pending. Further RFQs are expected subsequently. The project requirements are: absorber limestone slurry re-circulation pumps, absorber oxidation air blowers, absorber tank slurry agitators, mist eliminator, silos, scaffolding, piles, elevators, water distribution systems, hand railing and fittings, slurry tanks, among others. 8Project Event: RFQs for an absorber system package are expected in May 2018. 8Expenditure Approval: Q1:2018 8RFQ Date: May/2018 8Release Date: Jun/2018 8Start Date: Q3:2018 8Completion Date: Q2:2019 Click here for more information 8Project Name: Hydroelectric Power Greenfield Project 8Project Cost: 4000 crores 8Project Description: Promoter is currently selecting a drilling contractor for a 500 MW greenfield hydro electric power project. Further bid are expected soon. The project requirements are: load cum excavator, hydraulic excavator, dumpers, jack hammer, water sprinkler machine, aggregate crushing plant, grouting pump, needle vibrator, air water jet blaster, drilling machines, DG sets, bending and cutting machine, fuel/water tankers, EOT crane, mobile crane, air compressor, tunnel boring machine, dozers, piles, elevators, building supports, gantry crane, spillway radial gates and hydraulic hoists, spillway stop logs, discharge pipe, valves, main inlet, intake trash rack, intake fixed wheel gates, desilting chamber gate, surge shaft gates, draft tube gate, trash rack cleaning machine, sluice gates, penstock, actuation system, flap gates, Francis turbine, pumps, spiral, casing, runner blades, guide vanes, oil pressure unit, water seal and air seal, generator and its control panel, guide bearings, protection relays, transformer and its auxiliaries, lightning arrester panels, excitation system and its auxiliaries, battery bank, SCADA, unit control board, sensors, console, display panels, gas insulated switch-gear and its auxiliaries - circuit breakers, isolators, capacitor bank, dis-connectors, governor panel, cables, transmission lines, nozzles, among others. 8Project Event: RFQs for consultancy services for DPR preparation are expected by the end of April 2018. 8Expenditure Approval: 2017 8RFQ Date: 28/Apr/2018 8Release Date: May/2018 8Start Date: Q2:2020 8Completion Date: Q3:2025 Click here for more information 8Project Name: Thermal Power Station - FGD Addition 8Project Cost: 700 crores 8Project Description: Owner's plans to install a flue gas desulphurisation (FGD) Unit at its 1200 MW unit in its 2500 MW thermal power station is getting hampered. The major requirements are: absorber system, gas to gas heat exchanger, piles, scaffolding, ladders, dozers, limestone silos, slurry tanks, booster fan, wet ball mills, slurry re-circulation pumps, bucket elevator, gypsum dehydration, stairways, among others. 8Project Event: RFQ for supply of an FGD is expected to be out by June 2018. 8Expenditure Approval: Q4:2017 8RFQ Date: Jun/2018 8Release Date: Jul/2018 8Start Date: Q2:2019 8Completion Date: Q2:2021 Click here for more information