All content in this website is sourced legitimately

Page No: 1
Business opportunities ahead in power sector
Apr 13: 8Project Name: Thermal Power Station Project
8Project Cost: 5000 crores
8Project Description: Owner plans to set up a 660 MW replacement super-critical thermal power complex to be located in the existing premises of old Thermal Power Station has been delayed due to environment permission issues. Further RFQs are expected subsequently. The project requirements are: pulverized boiler, steam turbine, generator, cooling tower, coal handling plant, ash handling plant, chimney, heat exchanger, preheater, ventilation system, water treatment plant, scaffolding, dozers, cranes, stacker-reclaimer, ESP, switchyard equipment, transformer, fire protection system, FGD, NOx controller, tanks, silos, among others.
8Project Event: RFQ for an EPC contractor is expected to be floated by May 2018.
8Expenditure Approval: Q4:2017
8RFQ Date: May/2018
8Release Date: Q3:2018
8Start Date: Q1:2019
8Completion Date: Q3:2023
Click here for more information
8Project Name: Thermal Power Station - FGD Addition
8Project Cost: 500 crores
8Project Description: Promoter is undertaking survey works for preparation of a feasibility report for installation of a flue gas desulphurisation unit (FGD) in 300 MW of its 750 MW thermal power plant. Further RFQs are expected after preparation of the feasibility report. The major requirements are: absorber system, gas to gas heat exchanger, piles, scaffolding, ladders, dozers, limestone silos, slurry tanks, booster fan, wet ball mills, slurry re-circulation pumps, bucket elevator, gypsum dehydration, stairways, among others.
8Project Event: RFQs supply, installation, erection and commissioning of FGD works are expected by June 2018.
8Expenditure Approval: 2017
8RFQ Date: Jun/2018
8Release Date: Q3:2018
8Start Date: Q2:2020
8Completion Date: Q3:2022
Click here for more information
8Project Name: Super Thermal Power Maintenance Project 
8Project Cost: 20 crores
8Project Description: The owner has planned a 25-day capital overhaul in 250 MW of its 3000 MW thermal power plant. The mandatory work includes replacement of boiler pressure parts, water tubes, replacement of pipes in pent house, turbine casing, checking and cleaning of condensate pumps, air preheater guide bearing replacement, checking of nozzles of coal burner and do proper lubrication, damper checking and replacement, among others.
8Project Event: RFQs for required equipment are expected in mid - May 2018.
Click here for more information

**********************************

Back  |  Top