All content in this website is sourced legitimately

Page No: 1
ONGC lines up 3 rigs for Mumbai High Offshore South field
Mar 08: ONGC has hired 3 offshore rigs developing Mumbai High Offshore South field.
8Each offshore rig with a maximum water depth operating capacity of 300 feet has been hired for an overall period of 3 years.
Find our more on their deployment status

**********************************

Back  |  Top