Greenfield LPG pipeline: RFQs for equipment expected in May, 2018
Jan 31: 8Project Name: LPG pipeline project
8Project Cost: Rs 6000 Crore
8Project Description: Owner along has selected the PMC contractor to lay a 2,000-km, 6 MMTPA pipeline to carry liquefied petroleum gas (LPG). The project work is divided into three stretches, 650 km (approx) each.
Major equipment required: Centrifugal Pump, Mainline pipes, welding machines, excavators, bulldozer, Shovel, Backhoes, Dozers, Scrappers, Paver, Pumps, Generators, Compressors, Jack Hammers, Pile drivers, Pumps, Buried Pipelines, Isolation Valves (Manually, Remotely, Automatically Operated), Relief Valves (Thermal or other types), Pipe bridges or other supports, Control Systems, Leak Detection System, Pig launcher and receivers, Motors, Transformers, Bulldozer, Dump Truck, Hydro excavator, Mechanic Truck, Pavement Saw, Forklift, Crane, control valve, Filters.
8Project Event: RFQ for equipment is expected by May 2018.
8Expenditure Approval : Q3:2016
8RFQ Date : May/2018
8Release Date: Jun/2018
8Start Date : Q2:2018
8Completion Date : Q2:2021
Click here for more details.

**********************************