All content in this website is sourced legitimately

Page No: 1
Fertilizer industry: We provide the best templates
Dec 22: We have been monitoring fertilizer projects for the last 15 years but now a new software format has allowed us a 100% coverage. We provided very detailed project related information on the entire fertilizer fertilizer sector. Our services include:
-- A 100% catch of all equipment and service requirements going ahead in the industry
-- All raw material requirements
-- Daily fertilizer prices, domestic and international
-- A rich database of information on the fertilizer sector
-- Our regular 100% coverage of the sector in terms of reports, news and analyses

NPK Fertilizer Greenfield Project  
8Cost - Rs 1517 Crore
8Project Description: ThyssenKrupp Industrial Solutions (India), Tecnimont Private Limited, Intexa- Tata Project are in the race for a greenfield NPK Fertilizer unit. The techno-commercial discussion has been completed and price bids are to be opened. The equipment requirements are Feeding hoppers, Electronic belt scales, Conveyors, Mixers, Crushers, Granulators, Dryers, Feeders, Coolers, Elevators, Blowers, Collectors, Towers, Chimneys, Drums, Bins, Screens and more
8Project Event: RFQ for EPC contractor was floated in February 2017 and price bid is likely to be opened in January 2018. The EPC contractor is likely to be finalized in February 2018.
Click here for more information
SSP Annual Maintenance Project  
8Cost - Rs 0.20 Crore
8Project Description: A Fertilizer Company is planning an annual shutdown maintenance in April 2018 at their existing fertilizer complex in India. The existing capacity is made up of 100000 MTPA of SSP.
8Project Event: RFQ for equipment and services is likely to be released in March 2018
Click here for more information
SSP Annual Maintenance Project 
8Cost - Rs 0.15 Crore
8Project Description: A Fertilizer Company is planning an annual shutdown maintenance in December 2018 at their existing fertilizer complex in India. The existing capacity is made up of 132000 MTPA of SSP.
8Project Event: RFQ for equipment and services is likely to be released in October 2018.
Click here for more information
 

**********************************

Back  |  Top