Software updates: Fertilizer projects
Dec 14: Urea (Granular) and Captive Power Unit Expansion Project  
8Cost - Rs 700 Crore
8Project Description: A fertilizer company a Project Management Consultant, which is completed a basic engineering study for an expansion of Urea (Granular) Unit from 1500 MTPD to 1800 MTPD and Captive Power Unit from 7.5 MW to 32.5 MW in India. The equipment requirements are Gas Turbine Generating Set, HRSG Unit, Pumps, Heaters, Compressors, Reactors, Evaporators, Condensers, Coolers, Separators, Ejectors, Absorbers, Filters, Prilling tower Absorbers, Heat exchangers, Columns and more
8Project Event: RFQ for the EPC contractor is likely to be released in March 2018
Click here for more information
Customize Blending Unit for NPK Fertilizer & Ammonia Storage Tank Greenfield Project 
8Cost - Rs 90 Crore
8Project Description: A fertilizer company has hired a Project Management Consultant, which is completed a basic engineering study for its 30 TPH of Customized Blending Unit and 5000 MT of Ammonia storage tank in India. The equipment requirements are Steam Granulator drum, Rotary Dryer, Rotary Cooler, Belt / Screw Conveyors, Crushers, Screens, Weigh feeders, Cyclone Separators, Bag filters, Scrubbers, Bucket Elevators, Screw conveyors, Coating drum, Blowers, Compressor, Centrifugal Pumps, Safety Showers, Wind Sock, Flare package consists of Flare Tip Pilot, Flare stack, Local control stations (LCS) with canopy, Flame proof light fittings, GI earthing & lightning protection materials, Non addressable fire alarm system consisting FA panel, detectors, manual call points, etc., Ammonia gas detector, Bellows,Firefighting hydrants/ Spray Nozzles and more
8Project Event: RFQ for the EPC contractor is likely to be released in March 2018
Click here for more information
Ammonia-Urea Annual Maintenance Project
8Cost - Rs 30 Crore
8Project Description: A fertilizer company is planning an annual shutdown maintenance in March or April 2018 at their existing fertilizer complex in India. The existing capacity is made up of 1100 MTPD of Ammonia, 1650 MTPD of Urea. Pre-Vendor Qualification is necessary for maintenance contractor.
8Project Event: Tender for maintenance contractor is likely to be released in Q1 2018
Click here for more information


**********************************

Back  |  Top