Software updates: Fertilizer projects
Dec 11: Ammonium Nitrate Greenfield Project: RFQs in Q1, 2018  
8Cost - Rs 1750 Crore
8Project Description: A Fertilizer Company is awaiting clearance for its greenfield Ammonium Nitrate project with a capacity 2550 MTPD in India. The equipment requirements are Power receiving switchyard and sub-station, DG set, Complete firefighting system, Fire and smoke / gas detectors, Intake pipeline for water, Water treatment plant, Water reservoir, DM Water plant, DM Water tank, Condensate tank, Process water tank, Cooling Tower including pumps, motors / turbine and dosing system, Boilers and stack, Instrument air compressors, receivers and dryer, Effluent treatment plant including Reunite, Storage tanks including pumps and more.
8Project Event: RFQ for the Contractor is likely to be released in Q1 2018
Click here for more information
Ammonia-Urea Energy Saving Project: Finalization in January, 2018
8Cost - Rs 300 Crore
8Project Description: Thermax, Mitsubishi Hitachi Power Systems India Private Limited, Tata Power and BHEL are in the race for an energy saving project of National Fertilizer Ltd at its Fertilizer Complex in India. The project consultant is PDIL. There is a requirement for Compressor, Gas Turbine, Air Intake System, Filters, Centrifugal Fans, Pumps, HRSG and its Auxiliaries, Heat Exchanger Shell and Tube, Pressure Vessel, Dosing Pump, Motorised Agitator, Generator, Excitation System, Relay Panels, Generator Control Panels, 11KV Switch Gear, 3.3 KV Switch Gear, DC System, Battery Charger, 11KV/ 11.5KV Generator Transformer,11KV /3.3KV Transformer, 11KV /415V Transformer, Low Voltage Switch Gear, HV Motors, Control Panels, Neutral Earthing Resistor, Light fitting of each Type & Rating, Fire Detecting System, LV Motors, PA Systems, Capacitor bank, LCS, Annunciator panel, Load Management System, EOT Crane, Instrument Items and more.
8Project Event: The tender has already been released for an LSTK contractor in March 2017 and price bid is likely to be opened at the end of December 2017 finalization is due in January 2018.
Click here for more information
SSP Annual Maintenance Project:
RFQ in Q-1, 2018
8Cost - Rs 0.25 Crore
8Project Description: A Fertilizer Company is planning an annual shutdown maintenance in Q2 2018 at their existing fertilizer complex in India. The existing capacity is made up of 180000 MTPA of SSP and 36000 MTPA of Sulphuric Acid. Pre-Vendor Qualification may be necessary for a maintenance contractor.
8Project Event: RFQ for a maintenance contractor is likely to be released in Q1 2018