Dec 05: Ammonia-Urea Energy Saving Project  
8Cost - Rs 481 Crore
8Project Description: A Fertilizer Company is planning to reduce the energy consumption of its Ammonia and Urea units from 8.73 Gcal/MT to 8.40 Gcal/MT and 6.75 Gcal/MT to 6.45 Gcal/MT respectively in India. The capacity of the ammonia plant is 1045 MTPD and the urea capacity is 1000 MTPD. The equipment requirements are 2 nos of GTG with a capacity 25 MW (ISO Rating), 2 nos of HRSG with a capacity 65 TPH, Replacement of turbine for the Benfield Solution Pump in Ammonia with new motor, De-aerator (2 nos.) with HP BFW Pump motor set 2 x (1+1), One PRDS system for 12 ata to 4.5 ata in the Ammonia plant, Modification in Power Distribution System. Enviroment clearance is awaited and it will take about three months
8Project Event: The selection process for the LSTK contractor is on and techno-commercial discussion is completed and price bid is likely to be open in February 2018. No environmental clearance is needed in this case before price bid will be opened.
Click here for more information
Ammonia-Urea Energy Saving Project
8Cost - Rs 347 Crore
8Project Description: A Fertilizer company is planning to reduce the energy consumption of Ammonia and Urea units from 8.20 Gcal/MT to 7.70 Gcal/MT and 5.79 Gcal/MT to 5.33 Gcal/MT respectively in India. The capacity of the ammonia plant is 3500 MTPD and the urea capacity is 6060 MTPD. There is also as 30 MW of Captive Power Plant in the complex. The equipment requirements are Process Air Compressor (PAC), Gas Turbine, Heat Recovery Steam Generation, Pumps, Pipes, among others. Environment clearance has not been received.
8Project Event: EOI has already been released for an LSTK contractor in November 2017, Bid submission date is extended from 29 November to 14 Dec 2017 due to lack of bidders.
Click here for more information
Ammonia-Urea Energy Saving Project 
8Cost - Rs 300 Crore
8Project Description:  Thermax, Mitsubishi Hitachi Power Systems India Private Limited, Tata Power and BHEL are in the race for an energy saving project of National Fertilizer Ltd at its Fertilizer Complex in India. The project consultant is PDIL. There is a requirement for Compressor, Gas Turbine, Air Intake System, Filters, Centrifugal Fans, Pumps, HRSG and its Auxiliaries, Heat Exchanger Shell and Tube, Pressure Vessel, Dosing Pump, Motorised Agitator, Generator, Excitation System, Relay Panels, Generator Control Panels, 11KV Switch Gear, 3.3 KV Switch Gear, DC System, Battery Charger, 11KV/ 11.5KV Generator Transformer,11KV /3.3KV Transformer, 11KV /415V Transformer, Low Voltage Switch Gear, HV Motors, Control Panels, Neutral Earthing Resistor, Light fitting of each Type & Rating, Fire Detecting System, LV Motors, PA Systems, Capacitor bank, LCS, Annunciator panel, Load Management System, EOT Crane, Instrument Items and more. Environment clearance is not an issue here
8Project Event: The tender has already been released for an LSTK contractor in March 2017 and price bid is likely to be open in the end of December 2017. finalization is due in January 2018.