Software updates: Fertilizer projects
Nov 28: Energy Saving-cum- Ammonia-Urea Expansion Project 
8Cost - Rs 540 Crore
8Project Description: A Fertilizer Company has hired KBR as the EPC contractor, which is completed Detailed Feasibility Report for the energy saving-cum-expansion project which will reduce energy consumption of urea from 6.5 Gcal/t to 5.75 Gca//t, ammonia from 9.6 Gcal/ ton to 8 Gcal /ton while enhancing ammonia capacity from 240900 MTPA to 328500 MTPA and urea from 419750 MTPA to 569400 MTPA at Mangalore, Karnataka. The project currently awaits environment clearance. KBR will begin taking out RFQ for equipment shortly. The equipment requirements are Compressors, Turbines, Exchangers, Vaporizers, Subcoolers, Filters, Pumps, Heaters, Towers, Vessels, Storage systems, Cooler, Furnaces, Stacks, Converters, Boilers, Drums, Blowers, Economizers, Preheaters, Reactors, Tanks, Reactors, Evaporators, Condensers, Separators, Ejectors, Absorbers, Prilling towers, Absorbers, Heat exchangers, Columns Generators and many more
8Project Event: RFQ for equipment is likely to be released in December in place of October 2017
Click here for more information
Single Super Phosphate Greenfield Project  
8Cost - Rs 10 Crore
8Project Description: A Fertilizer company has been elicited environmental clearance for its greenfield Single Super Phosphate unit with a capacity 300 MTPD of SSP (Powder) and 350 MTPD of Granular SSP at Harjiana in Punjab. The equipment requirements are Cranes, Hoppers, Feeders, Conveyors, Valves, Grinding Mills, Tanks, Separators, Pumps, ID Fans, Collectors, Generator Mixer, Dens, Scrubbers, Screens, Elevators, Drums, Furnaces, Cyclones, Blowers, Belt, Weighing machine and more
8Project Event: Equipment purchase work is going on and RFQ for raw material is likely to be released in Q3 2018
Click here for more information
SSP Annual Maintenance Project 
8Cost - Rs 0.20 Crore
8Project Description:  A Fertilizer company is planning an annual maintenance shutdown in Q4 2018 at their existing fertilizer complex at Dahej in Gujarat. The existing capacity is made up of 200000 MTPA of SSP. Pre-Vendor Qualification may be necessary for a maintenance contractor.
8Project Event: RFQ for the Annual Maintenance contractor is likely to be released in Q3 2018