Nov 13: Installation of new natural draft Prilling Tower
An existing company is planning the installation of new natural draft Prilling Tower for their existing two ammonia-urea fertilizer complex in India.
8The company has a fertilizer complex with a capacity of 600 MTPD of ammonia,  1550 MTPD of urea and 30 MW of captive power unit while another unit has a  has a capacity of 650 MTPD of ammonia, 1600 MTPD of urea and 30 MW of Captive power unit.
8RFQs for equipment and services are likely to be released soon
Click on Details for more
  
L
ow-Temperature Shift catalyst for ammonia Plant
An existing company is planning to purchase Low -Temperature Shift catalyst for ammonia plant at their fertilizer complex in India.
8The capacity of its fertilizer complex is 2 x 1520 MTPD of ammonia, 2x 2620 MTPD of urea and 2 x 51 MW of Captive power unit.
8Tender is likely to be released in December 2017 or January 2018
 Click on Details for more
SSP/NPK Greenfield Project
8Cost - Rs 70 Crore
8Project Description: A Fertilizer company is in the erection and installing mode for its greenfield SSP and NPK unit with a capacity of 1500 MTPD of SSP, 500 MTPD of NPK and 400 TPD of LABSA in India. The raw material requirements are 875 MTPD of Rock Phosphate, 550 MTPD of Sulphuric acid, and 525 MTPD of Urea/DAP/MOP/SSP respectively.
8Project Event: The project is likely to be commissioned in May 2018 and RFQs for raw materials are likely to be released in July 2018.
Click here for more information
Single/Triple Super Phosphate Greenfield Project 
  
8Cost - Rs 30 Crore
8Project Description: A Fertilizer company is awaiting environmental clearance for its greenfield Super Phosphate unit with a capacity 100000 MTPA of Single Super Phosphate and 60000 MTPA of Triple Super Phosphate in India. The equipment requirements are Cranes, Hoppers, Feeders, Conveyors, Valves, Grinding Mills, Tanks, Separators, Pumps, ID Fans, Collectors, Generators, Mixers, Dens, Scrubbers, Screen, Mill, Elevator, Drum, Furnace, Cyclone, Blower, Belt, Weighing machine and more.
8Project Event: The terms of reference have been granted and RFQs for a contractor is likely to be released in March 2018
 Click here for more information
SSP/NPK Fertilizer Annual Maintenance Project 
8Cost - Rs 0.35 Crore
8Project Description: A Fertilizer company is planning an annual maintenance shutdown in June or July 2018 at their existing fertilizer complex in India. The existing capacity is made up of 30000 MTPA of NPK and 33000 MTPA of SSP. Pre-Vendor Qualification may be necessary for a maintenance contractor.
8Project Event: RFQs for an Annual Maintenance Contractor is likely to be released in February or March 2018
Click here for more information
Phosphoric Acid Greenfield Project 
8Cost - Rs 10 Crore
8Project Description: A Fertilizer company is awaiting environmental clearance for its greenfield Phosphoric acid unit with a capacity 30000 MTPA in India.The equipment requirements are Storage Systems, Soda Ash Silos, Rotary Dryers, Grinding Unit, Ball Mill, Mixing Tanks, Blending Unit, Wet Scrubber Unit, Venturi Scrubber Unit, Cyclone System, Air Pollution Control System, Vibro Shifter, Screens, Sieves, Conveyors and more
8Project Event: The terms of reference have been granted and RFQs for a contractor is likely to be released in March 2018
Click here for more information

SSP/Sulphuric Acid Annual Maintenance Project
8Cost - Rs 0.30 Crore
8Project Description: A Fertilizer company is planning an annual maintenance shutdown in May or June 2018 at their existing fertilizer complex in India. The existing capacity is made up of 66000 MTPA of SSP, 30000 MTPA of Sulphuric acid. Pre-Vendor Qualification may be necessary for a maintenance contractor.