Nov 01: Urea (Granular) and Captive Power Unit Expansion Project 8Cost - Rs 700 Crore 8Project Description: A Fertilizer company is awaiting environmental clearance for an expansion of Urea (Granular) Unit from 1500 MTPD to 1800 MTPD and Captive Power Unit from 7.5 MW to 32.5 MW in India. 8Project Event: Tender for LSTK contractor is likely to be released in December in place of November 2017 due to delay in tender preparation. Click here for more information NPK Annual Maintenance Project 8Cost - Rs 0.20 Crore 8Project Description: A Fertilizer companyis planning an annual maintenance shutdown in June or July 2018 at their existing fertilizer complex in India. The existing capacity is made up of 20000 MTPA of NPK. Pre-Vendor Qualification may be necessary for a maintenance contractor. 8Project Event: RFQs for Annual Maintenance Contractor is likely to be released in February or March 2018 Click here for more information Customize Blending Unit for NPK Fertilizer & Ammonia Storage Tank Greenfield Project 8Cost - Rs 90 Crore 8Project Description: A Fertilizer companyis awaiting environmental clearance for its 30 TPH of Customized Blending Unit and 5000 MT of Ammonia storage tank in India. 8Project Event: Tender for LSTK contractor is likely to be released in December in place of November 2017 due to delay in tender preparation. Click here for more information An existing company is planning to set up a greenfield SSP/GSSP with a capacity 120,000 MTPA in India. 8The projected investment cost is around Rs 10 crore. 8The requirement of power is about 35 kW/MT, which will be sourced from DGVCL. the company is also planning to purchase a 250 KVA DG set for emergency power back up. Following raw material requirements 8Rock Phosphate 8Sulphuric acid Following plant needs equipment 8SSP plant 8Pollution Section SSP 8Granulation Plant 8Pollution Section GSSP 8Material Handing Machines 8Utilities 8Storage-Liquid RM Click on Report for more Rs 480 crore energy saving project: Contractor selection by February, 2018 Sources said that, the proposal for environmental clearance for an energy saving project in an ammonia-urea complex is likely to be granted in March 2018, and the tender for an LSTK contractor is likely to be finalized in February 2018. 8The present capacity of its existing complex is 25 lakh MTPA of Urea, 6 lakh MTPA of Complex fertilizers and 1.6 lakh MT of Industrial Chemicals every year. 8The main aim of the Energy Saving Project is to reduce the specific energy consumption of Ammonia-V from 8.73 GCal/MT to about 8.40 GCal/MT and Urea from 6.75 GCal/MT to 6.45GCal/MT respectively. 8The projected investment cost is around Rs 481.61 crore. 8The total power requirement is about 42 MW, which is sourced from Tata Power through grid but after ESP company will not depend on Tata Power, but the requirement of Natural gas will be increased. The following are proposed modification 8GTG ( 2×32MW) ISO Rating 8HRSG ( 2×65 TPH) 8Replacement of turbine for Benfield Solution Pump in Ammonia-V with new motor 8De-aerator (2 nos.) with HP BFW Pump motor set (2 x (1+1) 8One PRDS system for 12 ata to 4.5 ata in Ammonia-V 8Modification in Power Distribution System Click on Report for more