All content in this website is sourced legitimately

Page No: 1
Software updates: Oil & gas projects
Aug 31: 8Project Name: Early Production System
8Project Description: An early production system in an E&P field along with the laying of a pipeline for crude evacuation. The following units have been proposed in the facility: Production field headers & test headers, Group separator, Gas scrubber, Bath heater, Dispatch pump, Flare System, Orifice meter, Mass flow meter, Tube well, Firefighting system, DG set.
Further RFQs are expected shortly.
8Project Event: RFQs for the hiring EPC contractor is expected by December 2018
8Expenditure Approval: Q4/2016
8RFQ Date: Dec/2017
8Release Date: Q1/2018
8Start Date: Jun/2018
8Completion Date: Q1/2019
Click here for more details
8Project Name:  Greenfield Propylene Derivative Petrochemical Project
8Project Cost: Rs 4500 crore
8Project Description: The owner along with the PMC and licensor is carrying out engineering activities to establish a Propylene Derivatives Petrochemical Project (PDPP) to manufacture petrochemical products such as Acrylic acid, Oxo-alcohols, and Acrylates. RFQs for miscellaneous civil and structural work are already out. Whereas, RFQs for some mechanical equipment and related works are still to be tendered out
Major equipment still to be needed are: Acrylic acid pumps, Cyclohexane pumps, IPAC pump, Esterification pumps, Propylene inlet line, Mixed tank manifold, HC detectors, Toxic detectors, Valves, Flanges.
8Project Event: RFQs for listed equipment are expected by mid-September 2017.
8Expenditure Approval: Q2/2015
8RFQ Date: Sep/2017
8Release Date: Oct/2017
8Start Date: Q3/2015
8Completion Date: Q2/2018
Click here for more information


**********************************

Back  |  Top