All content in this website is sourced legitimately

Page No: 1
ONGC to hire an MOPU-I: Project parameters
Aug 23: ONGC will soon hire a Mobile Offshore Production Unit
8But how long should the contract period be?
8According to sources in ONGC, this was a subject of much debate and it was finally decided that the contract period should be more than what it was when an MOPU was hired for the Cluster-7 fields.
Find out more on where the MOPU will be deployed and what will the final period of contract be as also the advantage of having a longer period contract period.


**********************************

Back  |  Top