New captive LNG unit coming up-II: Design parameters
Jul 17: Click on Reports for the following details on the new project:
8Regasification capacity
8Parcel size of LNGC
8No. of ships required to handle LNG per year
8Total Time taken per vessel:
8LNGC to FSU loading rate
8Parcel size
8Time to unload an LNGC
8Time for Peripheral activity (berthing, documentation etc.)
8Total time per vessel
8Total time at berth to meet ragas capacity
8Therefore occupancy at berth in a year
8Capacity of regasification skids
8No. of operating days assuming full capacity are operating = 329 days (assuming 90% efficiency)
8Reserve price building RFQs are likely to be floated soon