All content in this website is sourced legitimately

Page No: 1
Maintenance work at FCCU unit: Tender to be floated soon
Feb 22: What is sought to be replaced is the Pneumatic Control System.
8This maintenance work will be started by June, 2017.
8Following equipment will be required:
--Latest Pneumatic Control System.
--Double Disc Slide Valve (DDSV)
--Hydraulic Power system.
--Electro hydraulic Actuator.
--Position Transducer
--Feedback mechanism equipment
Click on Details for more

**********************************

Back  |  Top