Shutdown in MEG Unit : RFQs to be floated by March, 2017
Feb 09: An existing refinery is planning a shutdown of its MEG plant.
8Equipment likely to be needed are:
-- Hydro product separator

-- PA hydrogeneration reactor
-- Water stripper 
-- C7 cut cooler
-- DEC 7 condensor
-- EDC condensor