250 km Gas Transportation Pipeline: Commissioning by Q-1,2018
Feb 07: A gas transportation pipeline is expected to be commissioned in Q-1, 2018 against the earlier scheduled date of Q-4, 2017 8The Length of the pipeline is 250 km with a diameter of 24 inches. 8The carrying capacity of the gas pipeline is expected to be 36 MMSCMD. 8The pipeline is expected to be commissioned by Q-1, 2018 as against Q-4, 2017. Click on Details for more.