All content in this website is sourced legitimately

Page No: 1
Expansion in POL depot: EC expected by Sept, 2017
Jan 31: No additional land is required for the POL expansion.
 
8Pproposal has been submitted to the state environment impact assessment authority.
 
8The proposed project will include installation of two above the ground storage tanks (2 x 858 KL) for biodiesel and one above the ground storage tank (250 KL) for Ethanol.
 
8After implementation of the project, capacity of the depot will increase to 18068 KL from the present capacity of 16102 KL.
 
8Equipment required: 
 -- Metering System
 -- Batch Controller 
 -- Plant control system 
 -- Programmable Logic Controller (SMPS)
 -- Control and Interlocking System 
 -- Integrated Control System 
 -- Emergency Shutdown System
 Click on Details for more


**********************************

Back  |  Top