All content in this website is sourced legitimately

Page No: 1
Maintenance work coming up : RFQs  to be floated by Feb,2017
Jan 25: Cathodic protection system installation is going to take place during maintenance work coming up by Feb, 2017 in an existing product pipeline.
8Equipment required:
-- Cathodic Disbondment Tester 
-- Seamless Pipes 
-- Pressure casting Aluminium Differential 
-- Air Intact tube
 
Click on Details for more


**********************************

Back  |  Top