All content in this website is sourced legitimately

Page No: 1
Rs 1000 crore development: EPC contractor tender expected in Q-1, 2019
Jul 18: 8Project Name: CBM Block Development
8Project Cost: Rs 1000 crore.
8Project Description New: The owner's RFQs for the directional drilling services for the 80 wells development drilling under Phase III in Sector B of the Raniganj North Block located in Burdwan district in the state of West Bengal are expected soon. The Project also involves the construction of 4 Gas Collecting Stations (GCS) and laying of interconnecting and transportation pipeline network (4”) for CBM transportation. All the planned wells are of vertical profiles and owner owned drilling rigs are proposed to be deployed for undertaking drilling activities. The expected reserves of the block are 43 billion cubic meters (bcm). The equipment required for the project will be Drilling pipes, Casing pipes, Drill Bits, Blow out Preventer, Cementing services and Mud engineering services.
8Project Event New: RFQ for hiring of the directional drilling services are expected by October 2018.
RFQs for hiring of equipment are expected by December 2018.
RFQ for the hiring of an EPC Contractor for GCS construction and laying of pipelines are expected by Q1/2019
8Expenditure Approval: Q3/2014
8RFQ Date: Oct/2018.
8Release Date: Nov/2018.
8Date: Sep/2019
8Completion Date: Dec/2022
 Click here for more details 

**********************************

Back  |  Top