Jun 15: Rs 4500 crore greenfield hydroelectric power project 8Mobilization of equipment is in progress at the site. 8FC stage-2 is pending at DFO. 8RFQ for the HM works package is expected soon. Rs 8500 crore greenfield hydroelectric power project 8S/S tender floated and pre-bid meetings are yet to be conducted. 8Erection and installation of TG units are in progress. 8RFQ for the 250 KVA P/S works is expected. Reconductoring of MePTCL lines: Business opportunities 8Meghalaya Power Transmission Corporation Ltd (MePTCL) plans to reconductor the existing 132 KV single circuit line with HTLS conductor 8There are business opportunities ahead Old hydel power plant: Business opportunities 8This hydel power plant is going to complete 25 years of service 8The owner plans a replacement of old equipment 8More business opportunities ahead Rs 2000 crore greenfield hydroelectric power project 8Pilling and foundation works were completed. 8FC stage-2 is pending at DFO. Detailed engineering works are in progress for P/S works. 8RFQ for the ACSR moose conductor package is likely to be floated in July 2022. Rs 2000 crore greenfield hydroelectric power project 8PPA was signed with the government. 880% of the total land acquisition was completed. 8EPC package for civil and HM package is expected. Rs 323 crore 400 kV SC line to DC line with QUAD Moose ACSR 8Detailed engineering was completed for S/S. 8Forest clearance stage is yet to be granted. 8EPC package for T/L works is likely to be floated in Q3 2022. (Get in touch with us for more on these opportunities)