May 16: Project Name: Kiru Hydroelectric Power Greenfield Project
8Project Cost: 5000 crores
8Project Description: Chenab Valley Power Projects Limited, a JV of NHPC, JKSPDC, and PTC is finalizing the price bid evaluation in a greenfield 624 MW (4x156 MW) hydroelectric power project located in the Kishtwar district of Jammu & Kashmir. The award of the three package-wise bids are getting delayed due to internal administrative issues. This delay will in-turn hamper the project schedule. 
8Expenditure Approval: Mar/2019
8RFQ Date: Jul/2019
8Release Date: Jul/2019
8Start Date: Q3:2019
8Completion Date: 2023
Click here for more details

Project Name: Barauni Thermal Power Expansion Project
8Project Cost: 5000 crores
8Project Description: A tender for a project management consultant to conduct feasibility study on FGD has been delayed due to work at the Coal handling plant being on hold due to drainage issue at the area. 
8Project Event: RFQ for the appointment of a Project Management Consultant for the feasibility study, selection of implementing agency and supervision of installation, commissioning, testing & inspection till completion of the project for installation of FGD and SCR at 2X250MW extension project is expected by July 2019 by NTPC.
 RFQ for the balance works at the coal handling and ash handling plant is expected by June 2019.
8Expenditure Approval: 2010
8RFQ Date: Jun/2019
8Release Date: Jun/2019
8Start Date: Mar/2011
8Completion Date: Q3:2019
Click here for more details

Project Name: Wah Umiam Greenfield Hydroelectric Power Project, Stage-II
8Project Cost: 500 crores
8Project Description: North Eastern Electric Power Corporation Limited has put together a project team for a 57 MW (3x19 MW) greenfield hydel power project in the East Khasi Hills district of Meghalaya.
8Project Event: RFQ for a PFR consultant to carry out S&I activities for grant of TOR from the MoEF is expected by the October 2019.
8Expenditure Approval: 2020
8RFQ Date: Oct:2019
8Release Date: Oct:2019
8Start Date: Dec:2023
8Completion Date: 2027
Click here for more details

Project Name: Baradarha Thermal Power Project: Installation of FGD
8Project Cost: 500 crores
8Project Description: DB Power Private Limited is evaluating the final bid prices for an EPC contract for Air Quality Control System including an FGD package in the 1200 MW (2x600 MW) thermal power station located at Baradarha village, in the Janjgir-Champa district of Chhattisgarh. BHEL, L&T, GE Power, Mitsubishi are the major contenders
8Project Event: The date of award of an EPC contract for the FGD package is expected by June 2019.
8Expenditure Approval: Q4:2018
8RFQ Date: Jun/2019
8Release Date: Jun/2019
8Start Date: 2021
8Completion Date: 2023
Click here for more details

Project Name: Lalitpur Thermal Power Project: Installation of FGD
8Project Cost: 1000 crores
8Project Description: Lalitpur Power Generation Company Limited, a wholly owned subsidiary of Bajaj Group has a pending petition for the capital cost approval with the Uttar Pradesh Electricity Regulatory Commission (UPERC) for installation of three flue gas desulphurisation system (FGD) in its operating super-critical thermal power project located at Lalitpur, in the Bulandshehar district of Uttar Pradesh. The case is also pending with the CEA for in-principle approval cost of Rs 2015 crore and to decide the specific optimum technology and mitigation of major issues to be faced in the installation of the FGD/SCR system. 
8Project Event: RFQ for a feasibility consultant is expected by August 2019.
 
RFQ for supply, design, installation, erection, and commissioning of the FGD system is expected by the Q4 2019.
8Expenditure Approval: 2020
8RFQ Date: Aug/2019
8Release Date: Aug/2019
8Start Date: 2021
8Completion Date: 2023
Click here for more details

Project Name: Maithon Thermal Power Station - Installation of De-NOx abatement system
8Project Cost: 500 crores
8Project Description: Maithon Power Limited’s RFQ for supply, erection, engineering and commissioning of a De-NOx system in the existing 1050 (2x525) MW thermal power station located at the Nirsa village, in Dhanbad district of Jharkhand. is getting delayed due to administrative internal issues.
8Project Event: RFQ for supply, transportation, erection, engineering, and commissioning of a De-NOx system among the shortlisted contenders is expected by August 2019.
8Expenditure Approval: 2020
8RFQ Date: Aug/2019
8Release Date: Aug/2019
8Start Date: 2021
8Completion Date: 2023
Click here for more details

Project Name: Sipat Advanced Ultra-Super-critical Thermal Power Demonstration Project, Stage-III
8Project Cost: 9484 crores
8Project Description: National Thermal Power Corporation Limited is carrying out the detailed project report activities by using in-house resources for the development of an 800 MW advanced ultra super-critical demonstration (AUSC) thermal power project to be located in the existing premises of the operating 2980 MW (3x660+2x500 MW) thermal power complex at Sipat in the Bilaspur district of Chhattisgarh.
8Project Event: RFQ for a QCI-NABET accredited EIA consultant to carry out the EIA studies is expected by September 2019.
8Expenditure Approval: 2020
8RFQ Date: Sep/2019
8Release Date: Oct/2019
8Start Date: 2021
8Completion Date: 2025
Click here for more details


**********************************