May 08: Project Name: Chanju III Greenfield Hydroelectric Power Project 8Project Cost: Rs 400 crores 8Project Description: Himachal Pradesh Power Corp. Ltd (HPPCL) is getting delayed in obtaining forest clearance for the diversion of 25.98 Hectare of Forest Land in favour for the construction of a 48 MW (3x16 MW) hydroelectric power project near village Jakhla and Dantoi in Chamba district of Himachal Pradesh. 8Project Event: RFQ for the civil and HM works is now expected by the Q1 2020. 8Expenditure Approval: 2020 8RFQ Date: Q1:2020 8Release Date: Q1:2020 8Start Date: 2021 8Completion Date: 2025 Click here for more details Project Name: Doimukh Greenfield Hydroelectric Project 8Project Cost: Rs 2000 crores 8Project Description: The Arunachal Pradesh government has withdrawn pernission for SJVN’s Doimukh hydroelectric project in Arunachal Pradesh. The capacity of the project was reduced to 52 MW from the allocated 80 MW capacity due to e-flows issues. After all survey and investigations done at the site, the project was found to be unviable. Click here for more details Project Name: Reoli Dugli Greenfield Hydroelectric Project 8Project Cost: 3000 crores 8Project Description:L&T Himachal Hydropower Limited has dropped plans to set up a 430 MW hydro power project in Village Tindi, near Udaipur, in Lahul & Spiti district of Himachal Pradesh due to lack of basic infrastructure and high power generation cost. L&T has already invested 100 crores for the preparation of EIA report, site survey and investigation, design and drawing. A petition to waive off the P&L is pending at the state government. Click here for more details Project Name: Attunli Hydroelectric Greenfield Project 8Project Cost: Rs 7000 crores 8Project Description: Attunli Hydroelectric Power Company Limited, a joint venture between Jindal Power (74%) and Hydro Power Development Corporation of Andhra Pradesh (26%) is carrying out the tree enumeration works for the application of the diversion of forest land in the 680 MW (4*170 MW) greenfield hydel power project at village Aplani, Dibang valley district of Arunachal Pradesh. 8Project Event: RFQ for the civil works is expected by the Q1 2020. 8Expenditure Approval: 2020 8RFQ Date: Q1:2020 8Release Date: Q1:2020 8Start Date: 2021 8Completion Date: 2025 Click here for more details Project Name: Coastal Based Thermal Power Expansion Project 8Project Cost: Rs 8000 crores 8Project Description: Simhapuri Energy Limited’s plans to develop a 1320 MW brownfield thermal power supercritical project seems to have been shelved for now as the already existing 600 MW complex is under shut down due to lack of PPA agreements. An EIA report has been prepared but no movement in the project is seen 8Project Event: RFQ for the project is on hold. Click here for more details