All content in this website is sourced legitimately

Page No: 1
Single bid for KG-DWN-98/2 FPSO: Was a last minute intervention outside of ONGC to blame?
Apr 10: Was it a last-minute intervention from outside of ONGC that created a single bidder situation for the FPSO for the KG-DWN-98/2 block.
8There was a certain assumption based on which three bidders were in the race for the FPSO
8But there seems to have been a last-minute intervention that turned the table in favour of the Sapoorji Pallonji-Bumi Armada combine
Click on Details for more

**********************************

Back  |  Top