Business opportunities coming ahead in power sector
Apr 18: 8Project Name: Boiler Maintenance of Thermal Power Project
8Project Cost: 25 crores
8Project Description: Promoter's proposal for a planned maintenance of a boiler and its auxiliaries for 20-days at its 1200 MW thermal power complex  has been delayed on account of lack of headquarter approval. The mandatory job includes servicing of burner system, overhauling of ID, FD and scanner air fans, replacement of seals, support bearings, casing, valves, overhauling of boiler pressure parts, among others.
8Project Event: RFQs for overhauling of the boiler and its auxiliaries are expected by the first week of May 2018.
Click here for more information
8Project Name: Greenfield Hydro Project
8Project Cost: 1500 crores
8Project Description: Owner has hired a company as an EIA consultant for preparation of an EIA report for a greenfield 210 MW hydroelectric project. The owner after preparation of the DPR will decide either to come up with a package wise or an EPC contract. The project requirement are: tunnel loading machine, load cum excavator, EOT crane, dozers, piles, elevators, scaffolding, gantry crane, spillway radial gates, valves, intake trash rack, penstock, sluice gates, Francis turbine, water and air seal, pumps, generator, transformer, excitation system and its auxiliaries, power-house equipment, SCADA, HMI, fire protection system, among others.
8Project Event: RFQ for an EPC contract or package wise bids is expected to come in May 2018.
8Expenditure Approval: Q1:2018
8RFQ Date: May/2018
8Release Date: Oct/2018
8Start Date: Q2:2020
8Completion Date: Q3:2024
Click here for more information
8Project Name: Thermal Power Station - Annual Rate Contract
8Project Cost: 3.5 crores
8Project Description: Developer is finalizing the notice inviting tender document for an annual rate contract (ARC) for a 600 MW thermal power plant. Further bid are expected soon.
8Project Event: RFQs for round the clock ARC for the O&M of coal handling plant are expected by May 2018.
8Expenditure Approval: Q1:2018
8RFQ Date: May/2018
8Release Date: Jun/2018
8Start Date: Oct/2018  
8Completion Date: Oct/2019
Click here for more information

**********************************