Aug 31: 8Project Name: Hydroelectric Greenfield Project 8Project Cost: Rs 875 crore 8Project Description: The owner along with a consultant is writing out the final EIA report for scoping environment clearance for a 90 MW (3*30 MW) greenfield hydroelectric project. The TOR has been extended. Implementation of Social Impact Assessment and Public Hearing are pending and will be completed after getting NBWL permission. Environment Clearance is likely to elicited within 4 months. 8Major equipment that will be required will be three Francis Turbine, Radial gates, turbine-generator sets and associated auxiliaries, transformers, butterfly valves, turbine auxiliaries, governors with auxiliaries, cables, bus ducts and terminal equipment, EOT cranes, shaft and bearing, couplings, vibration control system, girders, tunnel boring machine, powerhouse equipment, among others. 8Project Event: RFQ for an EPC contractor is expected by 1st Quarter of 2018. 8Expenditure Approval: Q4:2017 8RFQ Date: Q1:2018 8Release Date: Q1:2018 8Start Date: Q2:2018 8Completion Date: Q3:2023 Click here for more information 8Project Name: Captive Plant Expansion 8Project Cost: Rs 984 Crores 8Project Description: The owner is planning to add 165 MW to its captive capacity of 40 MW. TOR was granted to this project and at present surveys are ongoing at the site. The capacity addition is planned in the following manner 40 MW through coke oven (CO) gas, 68 MW through waste heat recovery unit (WHRU), 22 MW through blast furnace gas (BFG) type boiler and 35 MW through coal based AFBC boiler unit. RFQs for Civil works, Electrical and Mechanical Package, Control & Instrumentation units and BoP are expected in late 2018. Major equipment required will be waste heat recovery unit (WHRU) boilers, atmospheric fluidized bed combustion (AFBC) boiler, blast furnace gas (BFG) boiler, turbines, turbine generators, piping and fitting, pumps, valves, control unit, governor, DG set, electrostatic precipitator (ESP), cooling water circulation system, transmission lines, cables, insulation work, lubrication system and heat exchangers among others. 8Project Event: RFQs for Mechanical equipment expected in the last quarter of 2018. 8Expenditure Approval: 2016 8RFQ Date: Q4:2018 8Release Date: Q1:2019 8Start Date: Q4:2019 8Completion Date: 2022 Click here for more information