All content in this website is sourced legitimately

Page No: 1
Drilling programme-II: Rs 200 crore GCC and pipeline network in May, 2017
Nov 29: Along with the drilling programme, an investment is proposed for a Rs 200 crore investment in a Gas Collection Centre and an attendant pipeline network
8Environment clearance is expected in May, 2017
8EOIs are to be floated by March, 2017 for a header, piping systems, test separator, production separator, test tank, production tank, oil transfer pump and flare stack system
Click on Details for more


**********************************

Back  |  Top