All content in this website is sourced legitimately

Article Details
Page No:  1
Three phase 10 MMTPA refinery expansion: EC by December, 2017
Dec 21:   A three-phase 10 MMTPA expansion of an existing refinery is now coming up.
8Environmental clearance is expected to be granted in December, 2017.
8The expansion includes in phases additional units, including a CDU, a Fluid Catalytic unit and a DHT unit as well as other units.
8The expansion is likely in three phases and the entire expansion will be commissioned by 2022.
The following equipment requirements:
8Columns, Condensors, Feed water exchangers, Feed water tanks, Heat Exchangers, Heaters, Piping, Pressure Vessels, Reactors, Scrubbers, Flakers, Smoke Duets, Smoke Washers, Steam Drums, Storage Reactors, Reactors With Agitators, Post-Processors, Reactors, Regenarator, Fractionators, Settler, Reflux drums, Air fin cooler tubes, Pumps, Plates, Nozzles, Vessels, Columns cyclones, Air blowers, Wet gas compressors, Relief valves, boilers, Electrostatic precipitators, Scrubbers, Bellows, Heat exchangers, Switch condensers, Intercoolers, Stripping Columns, Separating columns, Other welded construction parts 
Click on Details for more
 Details

**********************************

<< Back  |  Top
 
The content in this website is authentic and all information is sourced legitimately. The news we produce is collated through journalistic effort that is legal and legitimate. We carry no information that violates Indian law or is a breach of confidentiality in any form or manner.
Copyright 2018 www.indianpetroplus.com. All rights reserved