Aug 07: Project: Bhadradri Greenfield Thermal Power Plant
Cost: 7360 crore
Description: TSGENCO along with EPC contractor BHEL is setting up a 1080 MW (4*270 MW) Bhadradari Thermal Power Plant in Manuguru district of Telangana. EC was granted to this project on March 15, 2017. At present, basic construction activities are ongoing. BHEL has already floated tenders to procure long lead items like ESP (Electrostatic Precipitators) and transportation of Boiler drum. However, RFQs for Valves and Control Equipment are expected shortly. 
Major requirements: Steel Pipes, I.D Fans, Control Equipment, Valves and heavy duty transportation among many others.
RFQ for Control Equipment expected in August 2017.
Click here for more
Project: Kwar Hydroelectric Power Greenfield Project
Project Cost: Rs 4949.24 Crore
Project Description: Chenab Valley Power Projects Private Limited, a joint venture of NHPC Limited, JKSPDC and PTC India Limited, continues with the basic engineering activities for the 560 MW (4*140 MW) Kwar Hydroelectric Power Station at Kwar in Kishtwar district of Jammu and Kashmir. CVPP has already floated the contract for civil works. RFQs for hydro-mechanical equipment are likely to be float for which equipment required will be vertical gates, radial gates, stoplogs, gantry cranes, trashracks, trashrack cleaning machine, steel liner for pressure shaft, overhead EOT cranes, penstock(4 nos.of 5.65m), penstock pipe, steel lining, expansion joints, fixed wheel gate, intake gate, surge shaft gate, lifting beam, head regulator gate with hoist and embedment, draft tube gate, bell-mouths, hydraulic hoist, power pack for hydraulic hoist, tailrace tunnels (2 nos.), orifice spillway(4 nos.), butterfly valves, among others.
 The contract for E&M works will come later for which the requirement will be powerhouse equipment, generator, switch-yard, among others.
Project Event: RFQs for hydro-mechanical works are likely to be float in third week of August 2017.
Expenditure Approval: Sep/2014
RFQ Date: Aug/2017
Release Date: Sep/2017
Start Date: Nov/2017
Completion Date: Jan/2024