Jun 11: 8Project Name: Thermal Power Station - Long Term Contract
8Project Cost: 8 crores
8Project Description: Owner is preparing the bid document for a long term maintenance contract (LTC) for coal handling plant (preventive maintenance and round the clock maintenance) equipment for the 3000 MW Thermal Power Station. The contract tenure will be of three years. Further bids are expected soon.
8Project Event: RFQs for LTC for a coal handling system equipment are expected by the end of June 2018, instead of May.
8Expenditure Approval: Q1:2018
8RFQ Date: 25/Jun/2018
8Release Date: 30/Jun/2018
8Start Date: Sep/2018
8Completion Date: Sep/2021
Click here for more information for key contacts
8Project Name: Thermal Power Station - Installation of FGD
8Project Cost: 750 crores
8Project Description: The owner has completed the site survey activities for installation of Wet Flue Gas Desulphurisation (WFGD). Preparation of feasibility report is ongoing. Tenders for the same is expected soon. The project requirements are: absorber system, gas to gas heat exchanger, spray headers and nozzles, mist eliminators & washing, agitators, quenching spray system, slurry re-circulation pumps, oxidation blower, gypsum bleed pumps, limestone grinding system, limestone slurry pumps, vacuum belt filter system, auxiliary absorbent slurry pumps with drive motor, piping, valves, auxiliary absorbent tanks, limestone storage tank, limestone silos, process water storage and pumping system, booster fans, ducting, dampers along with supports, slurry piping along with associated valves, low height wet chimney, FGD control room, dozers, wet ball mills, bucket elevator, gypsum dehydration, piles, spray headers, cooling water tank, process water tank, emergency slurry tank, among others.
8Project Event: RFQ for installation, supply, erection and commissioning of Wet Flue Gas Desulphurization unit is expected by the Q3 2018.
8Expenditure Approval: Q1:2018
8RFQ DateQ3:2018
8Release Date: Q3:2018
8Start Date: Q3:2019
8Completion Date: Q2:2021
Click here for more information
Business opportunities for the maintenance contractors : RFQs coming ahead
8A state power electricity board has planned the renovation of a control system in a hydro power station. Know more about the power project owner along with the key contact. Click on Details for more
A greenfield hydro power project in Assam - Opportunities for contractors and equipment suppliers
8A greenfield hydro power project is getting delayed. Find out what the problem is as well about upcoming business development opportunities. Click on Details for more
8400 MW hydel power plant: No one is willing to sign the PPA. Click on Details for more
8A state based distribution company plans to set up a grid-connected solar park : Azure power wins the contract. Click on Details for more

**********************************