Dec 01: 8Project Name: Offshore Field Development.
8Project Cost: Rs 1000 crore.
8Project Description: Promoter is planning the development of an offshore field. The project involves drilling of wells with an Electrical Submersible Pump system, installation of 1 new well platform and a 3 well clamp-on structure along with associated pipelines and power cables. At present, oil production of the field is about 30,000 bopd. A peak oil production of 5000 bopd in the year 2019-20, with an incremental oil production of 2 MMT, is envisaged from the project.
Further RFQs for the project are expected shortly.
8Project Event: RFQs for hiring an EPC contractor for supply and installation of a well platform along with associated pipelines and power cables are expected by December end 2017.
8Expenditure Approval: 23/Feb/2017.
8RFQ Date: 15/Dec/2017.
8Release Date: Q1/2018.
8Start Date: Q2/2018.
8Completion Date: Nov/2019.
Click here for more details

8Project Name: Drilling Site Hydrofracturing
8Project Cost: Rs 8 crore
8Project Description: Promoter is planning hydraulic fracturing work in the oil fields. The reservoir characteristics of the fields have wide variations ranging from shallow depth to depth more than 2000m. The requirement from promoter's end for Hydrofracturing services will be for lightweight ceramic/sintered bauxite proppant having a preferable mesh size of 20/40 & 16/30 respectively. An annual requirement of 1000 MT of proppant is expected from promoter's end.
8Project Event: RFP for the 20/40 proppant is expected by December end 2017.
RFP for the16/30 proppant is expected by January end 2018.
8Expenditure Approval: Sep/2017
8RFQ Date: 25/Dec/2017
8Release Date: Jan/2018
8Start Date: Q1/2018
8Completion Date: Q2/2018
Click here for more information
8Project Name: Pipeline Expansion Project
8Project Cost: Rs 1879 Crore
8Project Description: An existing company along with EPC contractor is carrying out the addition of a 280 km spur line from one marketing and pumping station to other from its existing Multi-Product Pipeline. The project also involves expanding the capacity of its pipeline from 5 MMTPA to 8 MMTPA by installing additional pump facilities. RFQ for equipment is already out. At present, backfilling work is going on.
8Project Event: RFQ for commissioning and pre-commissioning work is to be expected by March 2018.
8Expenditure Approval: Q1:2016
8RFQ Date: Mar/2018
8Release Date: Apr/2018
8Start Date: Q4:2016
8Completion Date: Q3:2018
Click here for more details.
8Project Name: Product Pipeline augmentation project
8Project Cost: Rs 277 Crore
8Project Description: An existing company is planning to augment its pipeline capacity to 6 MMTPA of petroleum products from the existing capacity 4.6 MMTPA. No additional land would be required for the project. Work is to be done in the existing stations only not in pipeline route. It includes replacement of 1 existing motor-driven Main Line Pumping Unit (MLPU), Replacement of 2 existing mainline pumps, Installation of 3 (2+1) motor-driven MLPUs.
8Project Event: RFQ for Project Management Consultant is to be expected by January 2018.
8Expenditure Approval: Q3:2017
8RFQ Date: Jan/2018
8Release Date: Feb/2018
8Start Date: Q1:2018
8Completion Date: Q2:2020
Click here for more details.


**********************************

Back  |  Top