All content in this website is sourced legitimately

Page No: 1
Rs 34,000 crore KG-DWN-98/2 project-I: ONGC hires a flow assurance expert
Apr 07: ONGC has hired yet another high cost domain expert for the KG-DWN-98/2 development.
8He is a flow assurance specialist and his expertise is needed at this pre-FEED stage of the massive Rs 34,000 crore project.
8His job is to ensure a detailed framework for assurance of hydrocarbon flows and depending on his concepts, the entire sub sea architecture will be determined
8Sources said that the SURF and Sub Sea Production Sytem contractors in turn will be conducing these flow assurance studies and they will form the very basis on which chemicals will be pumped into the field to ensure a steady flow of gas and oil from the reservoir.
8The domain expert will be a key player in determining the infrastructure needed in the KG-DWN-98/2 block and business development managers ought to stay in close contact with him
Click on Details to find out who this expert is and how he was selected. Also get more information on key general manager level contacts within ONGC who are involved with the project


**********************************

Back  |  Top