All content in this website is sourced legitimately

Article Details
Page No:  1
November performance-I: ONGC crude output curtailed by choking of B-193 export pipeline in Bassein
Dec 23:   Crude oil production during November, 2016 was 2.875 MMT which is 5.65% and 5.40% lower than target and production achieved in November, 2015 respectively.
8Cumulative crude oil production during April-November, 2016 was 23.990 MMT which is 1.76% and 3.53% lower than target and production during corresponding period of last year respectively.
8Crude oil production by ONGC during November, 2016 was 1.823 MMT which is 2.35% lower than the monthly target and 0.75% less when compared with November, 2015.|
8Cumulative crude oil production during April-November, 2016 was 14.724 MMT which is 1.45% lower than target for the period and 1.73% lower than the production during corresponding period of last year
8Reasons for shortfall in production are as under:
8Natural decline from matured & marginal fields of Mumbai high.
8Operational loss in Bassein due to suspected wax deposition and choking in the B-193 export pipeline.
Click on Reports for more
 Details

**********************************

<< Back  |  Top
 
The content in this website is authentic and all information is sourced legitimately. The news we produce is collated through journalistic effort that is legal and legitimate. We carry no information that violates Indian law or is a breach of confidentiality in any form or manner.
Copyright 2017 www.indianpetroplus.com. All rights reserved