November Performance-V: Production 3.30% lower than target
Dec 23:   Refinery production during November, 2016 was 19.915 MMT which is 3.30% lower than the target for the month but 1.98% higher than the production during corresponding period of last year.
8Cumulative production during April-November, 2016 was 162.444 MMT which is 2.03% higher than the target for the period and 8.01% higher than the production during corresponding period of last year.
8Refineries' production during November, 2016 was 11.446 MMT which is 2.26% lower than the target for the month but 8.53% higher than the production achieved in the corresponding month of last year.
8Cumulative production during April-November, 2016 was 90658.32 TMT which is 0.98% higher than the target for the period and 11.77% higher than the production during corresponding period of last year.
Reasons for shortfall of refinery production in some PSU refineries are as under:
8IOCL, Paradip: Throughput lower due to coke upliftment issue.
8IOCL, Digboi: Guwahati: Lower availability of Assam crude.
8IOCL, Mathura: Lower throughput due to advancement of DHDT shutdown to Nov-Dec'16 originally planned in December '16.
8CPCL, Manali: Crude throughput was lower than Target due to deferment of DHDT shutdown from Oct'16 to Nov'16.
8CPCL, CBR: Crude throughput was lower than target due to HSD containment (lower offtake of HSD) & non-availability of Crude (Narimanam & KG-D6).
8NRL, Numaligarh: Delay in startup after shutdown.